991 resultados para Traffic Engineering
Resumo:
The problem of determining the suitability of carbonate rocks as concrete aggregates is extremely complex and calls for more new data than has been available or obtainable from usual methods. Since 1955 the approach which has served as a primary basis for the project has been to gather as much new information as possible to apply to the problem. New information obtained by new and different techniques provides better understanding. This approach was decided on since, in all prior studies, a standard petrographic and petrologic approach correlated in many instances with standard engineering tests did not provide the answer in Iowa or elsewhere. One can theorize that concrete fails (excluding external causes such as traffic, foundation failure, etc.) because of stresses of internal origin. The stresses can be of a physical nature, such as frost action, or result from chemical activity such as the alkali aggregate reaction. If, as service records show, the aggregate is considered the cause of distress in concrete, it will without doubt be the manner in which an aggregate can create or contribute to stress of internal origin by physical or chemical means. Therefore the main emphasis was placed on studying physical and chemical properties of aggregates as well as the behavior of carbonate rocks in concrete environments. Although standard geologic and engineering methods were also utilized, the approach adopted required considerable effort in devising new techniques and methods. This report is intended to be a detailed summary of the research performed. Whenever possible, the work accomplished will be summarized and all pertinent data will be included. For further details, reference to the various theses and publications transmitted with this report or at previous times will be made wherever possible.
Resumo:
In mammals, glucose transporter (GLUT)-4 plays an important role in glucose homeostasis mediating insulin action to increase glucose uptake in insulin-responsive tissues. In the basal state, GLUT4 is located in intracellular compartments and upon insulin stimulation is recruited to the plasma membrane, allowing glucose entry into the cell. Compared with mammals, fish are less efficient restoring plasma glucose after dietary or exogenous glucose administration. Recently our group cloned a GLUT4-homolog in skeletal muscle from brown trout (btGLUT4) that differs in protein motifs believed to be important for endocytosis and sorting of mammalian GLUT4. To study the traffic of btGLUT4, we generated a stable L6 muscle cell line overexpressing myc-tagged btGLUT4 (btGLUT4myc). Insulin stimulated btGLUT4myc recruitment to the cell surface, although to a lesser extent than rat-GLUT4myc, and enhanced glucose uptake. Interestingly, btGLUT4myc showed a higher steady-state level at the cell surface under basal conditions than rat-GLUT4myc due to a higher rate of recycling of btGLUT4myc and not to a slower endocytic rate, compared with rat-GLUT4myc. Furthermore, unlike rat-GLUT4myc, btGLUT4myc had a diffuse distribution throughout the cytoplasm of L6 myoblasts. In primary brown trout skeletal muscle cells, insulin also promoted the translocation of endogenous btGLUT4 to the plasma membrane and enhanced glucose transport. Moreover, btGLUT4 exhibited a diffuse intracellular localization in unstimulated trout myocytes. Our data suggest that btGLUT4 is subjected to a different intracellular traffic from rat-GLUT4 and may explain the relative glucose intolerance observed in fish.
Resumo:
We review the key topics of one of the areas with the biggest impact of the last years in the chemical and pharmaceutical industry that is Crystal Engineering. The relevance of polymorphs and co-crystals from different points of view is been highlighted and broadly illustrated by means of several recent examples of studies carried out in this field. In addition, the most suitableinstrumental techniques and the intellectual property implications are reviewed.
Resumo:
Women in Science and Engineering (WISE) Program is to expand and improve educational and professional opportunities for women in all fields of science, technology, engineering and math (STEM) by facilitating individual, institutional, and social change.
Resumo:
Women in Science and Engineering (WISE) Program is to expand and improve educational and professional opportunities for women in all fields of science, technology, engineering and math (STEM) by facilitating individual, institutional, and social change.
Resumo:
Women in Science and Engineering (WISE) Program is to expand and improve educational and professional opportunities for women in all fields of science, technology, engineering and math (STEM) by facilitating individual, institutional, and social change.
Resumo:
Women in Science and Engineering (WISE) Program is to expand and improve educational and professional opportunities for women in all fields of science, technology, engineering and math (STEM) by facilitating individual, institutional, and social change.
Resumo:
Women in Science and Engineering (WISE) Program is to expand and improve educational and professional opportunities for women in all fields of science, technology, engineering and math (STEM) by facilitating individual, institutional, and social change.
Resumo:
Women in Science and Engineering (WISE) Program is to expand and improve educational and professional opportunities for women in all fields of science, technology, engineering and math (STEM) by facilitating individual, institutional, and social change.
Resumo:
Women in Science and Engineering (WISE) Program is to expand and improve educational and professional opportunities for women in all fields of science, technology, engineering and math (STEM) by facilitating individual, institutional, and social change.
Resumo:
The purpose of this Interstate Corridor Plan (plan) is to provide the Iowa Department of Transportation (Iowa DOT) with an initial screening and prioritization of interstate corridors/segments. This process evaluates the entire interstate system, independent of current financial constraints, using a select group of criteria weighted in terms of their relative significance. The resulting segments would then represent those areas that should be considered for further study (e.g., environmental, design, engineering), with the possibility of being considered for programming by the Iowa Transportation Commission. There was a dominant theme present in conversations with those department stakeholders who have a keen interest in the product of this planning effort. A statement that was often heard was that staff needed more information to help answer the question, “Where do we need to be looking to next, and when?” There was a strong desire to be able to use this plan to help populate that initial pool of candidate segments that would progress towards further study, as discussed below. It was this theme that framed the need for this plan and ultimately guided its development. Further study: As acknowledged at the beginning of this section, the product of this planning effort will be an initial screening and prioritization of interstate corridors/segments. While this initial screening will assist the Iowa DOT in identifying those areas that should be considered for further study, the plan will not identify specific projects or alternatives that could be directly considered as part of the programming process. Bridging the gap between this plan and the programming process are a variety of environmental, design, and engineering activities conducted by various Iowa DOT offices. It is these activities that will further refine the priority corridors/segments identified in this plan into candidate projects. In addition, should the evaluation process developed through this planning effort prove to be successful, it is possible that there will be additional applications, such as future primary system highway plans and statewide freight plans.