940 resultados para Road Lighting Costs.


Relevância:

20.00% 20.00%

Publicador:

Resumo:

This issue review provides information on the Department of Corrections construction and of proposed staffing for additional beds in the prison system and community-based corrections.

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Lane-Wells Road Logger was utilized primarily to determine the feasibility of employing such a device for moisture and density control in Iowa highway construction. A secondary objective was the use of the Road Logger to obtain information concerning moisture content and density during and after construction. Correlation studies with conventional test results required a small portion of the lease period. Practically all phases of construction and most materials utilized in base and surface courses were surveyed. Results of this study were good, in general, with the Road Logger indicating dry density slightly higher and the moisture content slightly lower than conventional results in most instances. Economic feasibility seemed to pose the greatest problem for the acceptance of the Road Logger as a standard compaction control device. It would appear from the findings of this study that probably only large projects, or several smaller contracts tested simultaneously, could justify the expense of the Logger. A total of about 128 miles were surveyed with the Logger during the lease period. Approximately 16 days of downtime due to minor breakdowns were recorded. Inclement weather forcing construction delays resulted in several idle days in which the Logger's full capabilities were not realized.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A computer program to adjust roadway profiles has been developed to serve as an aid to the county engineers of the State of Iowa. Many hours are spent reducing field notes and calculating adjusted roadway profiles to prepare an existing roadway for paving that will produce a high quality ride and be as maintenance free as possible. Since the computer is very well adapted to performing long tedious tasks; programming this work for a computer would result in freeing the engineer of these tasks. Freed from manual calculations, the engineer is able to spend more time in solving engineering problems. The type of roadway that this computer program is designed to adjust is a road that at sometime. in its history was graded to a finished subgrade. After a period of time, this road is to receive a finished paved surface. The problem then arises whether to bring the existing roadway up to the de signed grade or to make profile adjustments and comprise between the existing and the design profiles. In order to achieve the latter condition using this program, the engineer needs to give the computer only a minimum amount of information.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In the administration, planning, design, and maintenance of road systems, transportation professionals often need to choose between alternatives, justify decisions, evaluate tradeoffs, determine how much to spend, set priorities, assess how well the network meets traveler needs, and communicate the basis for their actions to others. A variety of technical guidelines, tools, and methods have been developed to help with these activities. Such work aids include design criteria guidelines, design exception analysis methods, needs studies, revenue allocation schemes, regional planning guides, designation of minimum standards, sufficiency ratings, management systems, point based systems to determine eligibility for paving, functional classification, and bridge ratings. While such tools play valuable roles, they also manifest a number of deficiencies and are poorly integrated. Design guides tell what solutions MAY be used, they aren't oriented towards helping find which one SHOULD be used. Design exception methods help justify deviation from design guide requirements but omit consideration of important factors. Resource distribution is too often based on dividing up what's available rather than helping determine how much should be spent. Point systems serve well as procedural tools but are employed primarily to justify decisions that have already been made. In addition, the tools aren't very scalable: a system level method of analysis seldom works at the project level and vice versa. In conjunction with the issues cited above, the operation and financing of the road and highway system is often the subject of criticisms that raise fundamental questions: What is the best way to determine how much money should be spent on a city or a county's road network? Is the size and quality of the rural road system appropriate? Is too much or too little money spent on road work? What parts of the system should be upgraded and in what sequence? Do truckers receive a hidden subsidy from other motorists? Do transportation professions evaluate road situations from too narrow of a perspective? In considering the issues and questions the author concluded that it would be of value if one could identify and develop a new method that would overcome the shortcomings of existing methods, be scalable, be capable of being understood by the general public, and utilize a broad viewpoint. After trying out a number of concepts, it appeared that a good approach would be to view the road network as a sub-component of a much larger system that also includes vehicles, people, goods-in-transit, and all the ancillary items needed to make the system function. Highway investment decisions could then be made on the basis of how they affect the total cost of operating the total system. A concept, named the "Total Cost of Transportation" method, was then developed and tested. The concept rests on four key principles: 1) that roads are but one sub-system of a much larger 'Road Based Transportation System', 2) that the size and activity level of the overall system are determined by market forces, 3) that the sum of everything expended, consumed, given up, or permanently reserved in building the system and generating the activity that results from the market forces represents the total cost of transportation, and 4) that the economic purpose of making road improvements is to minimize that total cost. To test the practical value of the theory, a special database and spreadsheet model of Iowa's county road network was developed. This involved creating a physical model to represent the size, characteristics, activity levels, and the rates at which the activities take place, developing a companion economic cost model, then using the two in tandem to explore a variety of issues. Ultimately, the theory and model proved capable of being used in full system, partial system, single segment, project, and general design guide levels of analysis. The method appeared to be capable of remedying many of the existing work method defects and to answer society's transportation questions from a new perspective.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Supplement to HR-388 - "Total Cost of Transportation Analysis of Road and Highway Issues"

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This report presents the results of a survey on the use of yellow versus white traffic paint. It was found that in most states the white paint was less expensive than the yellow. A substantial savings could be realized if an all white traffic marking system was permitted by the Federal Highway Administration. Paint costs from each state are presented, as well as by each region.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Iowa Department of Transportation (DOT) evaluated the PAS I Road Survey System from PAVEDEX, Inc. of Spokane, Washington. This system uses video photograph to identify and quantify pavement cracking and patching distresses. Comparisons were made to procedures currently used in the State. Interstate highway, county roads and city streets, and two shoulder sections were evaluated. Variables included travel speeds, surface type and texture, and traffic control conditions. Repeatability and distress identification were excellent on rigid pavements. Differences in distress identification and the effect of surface textures in the flexible test sections limited the repeatability and correlation of data to that of the Iowa DOT method. Cost data indicates that PAVEDEX is capable of providing comparable results with improved accuracy at a reasonable cost, but in excess of that experienced currently by the Iowa DOT. PAVEDEX is capable of providing network level pavement condition data at highway speeds and analysis of the data to identify 1/8-inch cracks at approximately 2-3 lane miles per hour with manual evaluation. Photo-logging capability is also included in the unit.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The first phase of the study of intersection lighting and accidents conducted using data from 1964 through 1971 yielded the conclusion that the installation of intersection lighting reduced the nighttime accident frequency by 52%. With this conclusion, this project (the second phase), was initiated to determine the relative benefit of a higher level of lighting as opposed to minimum lighting. Twenty pairs of intersections with similar geometrics were selected. Some lights were turned out at one intersection of each pair to produce a lighting level differential. Based on the results of this research, the lighting level of lighted rural at-grade intersections does not have a significant effect on the accident frequency. At the nineteen "reduced lighting" intersections, the number of lighted luminaires was reduced from 101 to 46 with a corresponding reduction in energy consumption of over 100,000 Kilowatt hours per year. This energy conservation measure could reduce consumption by an estimated 1,000,000 Kilowatt hours per year if initiated on more than 200 earlier primary, rural installations.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Falling Weight Deflectometer (FWD) has become the "standard" for deflection testing of pavements. Iowa has used a Road Rater since 1976 to obtain deflection information. A correlation between the Road Rater and the FWD was needed if Iowa was going to continue with the Road Rater. Comparative deflection testing was done using a Road Rater Model 400 and a Pynatest 8000 FWD on 26 pavement sections. The SHRP contractor, Braun Intertec Pavement, Inc., provided the FWD testing. The r^2 for the linear correlations ranged from 0.90 to 0.99 for the different pavement types and sensor locations.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The use of Railroad Flatcars (RRFCs) as the superstructure on low-volume county bridges has been investigated in a research project conducted by the Bridge Engineering Center at Iowa State University. These bridges enable county engineers to replace old, inadequate county bridge superstructures for less than half the cost and in a shorter construction time than required for a conventional bridge. To illustrate their constructability, adequacy, and economy, two RRFC demonstration bridges were designed, constructed, and tested: one in Buchanan County and the other in Winnebago County. The Buchanan County Bridge was constructed as a single span with 56-ft-long flatcars supported at their ends by new, concrete abutments. The use of concrete in the substructure allowed for an integral abutment at one end of the bridge with an expansion joint at the other end. Reinforced concrete beams (serving as longitudinal connections between the three adjacent flatcars) were installed to distribute live loads among the RRFCs. Guardrails and an asphalt milling driving surface completed the bridge. The Winnebago County Bridge was constructed using 89-ft-long flatcars. Preliminary calculations determined that they were not adequate to span 89 ft as a simple span. Therefore, the flatcars were supported by new, steel-capped piers and abutments at the RRFCs' bolsters and ends, resulting in a 66-ft main span and two 10-ft end spans. Due to the RRFC geometry, the longitudinal connections between adjacent RRFCs were inadequate to support significant loads; therefore, transverse, recycled timber planks were utilized to effectively distribute live loads to all three RRFCs. A gravel driving surface was placed on top of the timber planks, and a guardrail system was installed to complete the bridge. Bridge behavior predicted by grillage models for each bridge was validated by strain and deflection data from field tests; it was found that the engineered RRFC bridges have live load stresses significantly below the AASHTO Bridge Design Specification limits. To assist in future RRFC bridge projects, RRFC selection criteria were established for visual inspection and selection of structurally adequate RRFCs. In addition, design recommendations have been developed to simplify live load distribution calculations for the design of the bridges. Based on the results of this research, it has been determined that through proper RRFC selection, construction, and engineering, RRFC bridges are a viable, economic replacement system for low-volume road bridges.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Road dust is caused by wind entraining fine material from the roadway surface and the main source of Iowa road dust is attrition of carbonate rock used as aggregate. The mechanisms of dust suppression can be considered as two processes: increasing particle size of the surface fines by agglomeration and inhibiting degradation of the coarse material. Agglomeration may occur by capillary tension in the pore water, surfactants that increase bonding between clay particles, and cements that bind the mineral matter together. Hygroscopic dust suppressants such as calcium chloride have short durations of effectiveness because capillary tension is the primary agglomeration mechanism. Somewhat more permanent methods of agglomeration result from chemicals that cement smaller particles into a mat or larger particles. The cements include lignosulfonates, resins, and asphalt products. The duration of the cements depend on their solubility and the climate. The only dust palliative that decreases aggregate degradation is shredded shingles that act as cushions between aggregate particles. It is likely that synthetic polymers also provide some protection against coarse aggregate attrition. Calcium chloride and lignosulfonates are widely used in Iowa. Both palliatives have a useful duration of about 6 months. Calcium chloride is effective with surface soils of moderate fine content and plasticity whereas lignin works best with materials that have high fine content and high plasticity indices. Bentonite appears to be effective for up to two years and works well with surface materials having low fines and plasticity and works well with limestone aggregate. Selection of appropriate dust suppressants should be based on characterization of the road surface material. Estimation of dosage rates for potential palliatives can be based on data from this report, from technical reports, information from reliable vendors, or laboratory screening tests. The selection should include economic analysis of construction and maintenance costs. The effectiveness of the treatment should be evaluated by any of the field performance measuring techniques discussed in this report. Novel dust control agents that need research for potential application in Iowa include; acidulated soybean oil (soapstock), soybean oil, ground up asphalt shingles, and foamed asphalt. New laboratory evaluation protocols to screen additives for potential effectiveness and determine dosage are needed. A modification of ASTM D 560 to estimate the freeze-thaw and wet-dry durability of Portland cement stabilized soils would be a starting point for improved laboratory testing of dust palliatives.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A prior project, HR-388, (which was entitled "Total Cost of Transportation analysis of road and highway issues"), explored the use of a total economic cost basis for evaluation of road based transportation issues. It was conducted as a proof-of-concept effort between 1996 and 2002, with the final report presented in May 2002. TR-477 rebuilt the analytical model using current data, then performed general, system level, county level, and road segment level analyses. The results are presented herein and will be distributed to all county engineers for information and local use.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Please see TR-477 Phase 2 Final Report -- http://publications.iowa.gov/id/eprint/20041