999 resultados para Machine costs


Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper considers two-machine flow shop scheduling problems with machine availability constraints. When the processing of a job is interrupted by an unavailability period of a machine, we consider both the resumable scenario in which the processing can be resumed when the machine next becomes available, and the semi-resumable scenario in which some portion of the processing is repeated but the job is otherwise resumable. For the problem with several non-availability intervals on the first machine under the resumable scenario, we present a fast (3/2)-approximation algorithm. For the problem with one non-availability interval under the semi-resumable scenario, a polynomial-time approximation scheme is developed.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this note, we consider the scheduling problem of minimizing the sum of the weighted completion times on a single machine with one non-availability interval on the machine under the non-resumable scenario. Together with a recent 2-approximation algorithm designed by Kacem [I. Kacem, Approximation algorithm for the weighted flow-time minimization on a single machine with a fixed non-availability interval, Computers & Industrial Engineering 54 (2008) 401–410], this paper is the first successful attempt to develop a constant ratio approximation algorithm for this problem. We present two approaches to designing such an algorithm. Our best algorithm guarantees a worst-case performance ratio of 2+ε. © 2008 Elsevier B.V. All rights reserved.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

We consider the two-machine open shop scheduling problem in which the jobs are brought to the system by a single transporter and moved between the processing machines by the same transporter. The purpose is to split the jobs into batches and to find the sequence of moves of the transporter so that the time by which the completed jobs are collected together on board the transporter is minimal. We present a 7/5-approximation algorithm. © 2008 Wiley Periodicals, Inc. Naval Research Logistics 2009

Relevância:

20.00% 20.00%

Publicador:

Resumo:

We consider single machine scheduling and due date assignment problems in which the processing time of a job depends on its position in a processing sequence. The objective functions include the cost of changing the due dates, the total cost of discarded jobs that cannot be completed by their due dates and, possibly, the total earliness of the scheduled jobs. We present polynomial-time dynamic programming algorithms in the case of two popular due date assignment methods: CON and SLK. The considered problems are related to mathematical models of cooperation between the manufacturer and the customer in supply chain scheduling.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Cinema, with its passive cinematic apparatus and linear narrative is often characterised as a contrast to new media narrative strategies, yet from Vertov’s Man with a Movie Camera to Mike Figgis’ TimeCode and Wong Kar Wei’s 2046 cinema provides narrative strategies and spatial conceptualisations which prefigure or are contiguous with new media environments. Both our perception of what cyberspace constitutes and the technology that actualises those perceptions arise out of and are driven by fantasy and desire. This paper will explore the metaphors used to represent and understand new media aesthetics through cinematic representations of new media environments. Two key themes relevant to new media aesthetics emerge. Irigaray, Haraway, and Grosz are used to explore the de-essentialising haptic and penetrative potential of new technologies and their ability to collapse the boundary between the body and the machine. The second fantasy, of new media as a liminal space that expresses the memorialising function of technology and its relation to mourning, is analysed using Benjamin, Burgin and Rutsky. These altered spaces and perceptions of the body and memory of the post-cinematic subject are illustrated through an analysis of Gondry’s Eternal Sunshine of the Spotless Mind and Jonze’s Being John Malkovich. [From the Author]

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This study investigates whether men and women in caring occupations experience more negative job-related feelings at the end of the day compared to the rest of the working population. The data are from Wave Nine of the British Household Panel Survey (1999) where respondents were asked whether, at the end of the working day, they tended to keep worrying or have trouble unwinding, and the extent to which work left them feeling exhausted or “used up.” Their responses to these questions were used to develop ordinal dependent variables. Control variables in the models include: number of children, age, hours worked per week, managerial responsibilities and job satisfaction, all of which have been shown in previous research to be significantly related to “job burnout.” The results are that those in caring occupations are more likely to feel worried, tense, drained and exhausted at the end of the working day. Women in particular appear to pay a high emotional cost for working in caring occupations. Men do not emerge unscathed, but report significantly lower levels of worry and exhaustion at the end of the day than do women.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Annular, ring or torsional shear testers are commonly used in bulk solids handling research for the purpose of powder characterisation or equipment design. This paper reports from a DEFRA sponsored project which aims to develop an industrial powder flow-ability tester, (based on the annular shear tester) that is economic to buy and quick and easy to use in trained but unskilled hands. This paper compares the wall failure loci measured with an annular shear cell with measurements obtained using the accepted standard wall friction tester, the Jenike shear cell. These wall failure loci have been measured for several bulk solids which range from fine cohesive powders to free-flowing granular materials, on a stainless steel 304 2B wall surface.