884 resultados para Inhalation dose and risk


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Normally ovulating women exhibit a decline in risk behaviours that may lead to sexual assault during the fertile phase of the menstrual cycle, whereas women using the Pill do not. The current study tests two explanatory models: the mood and fertility models. Self-reported risk and non-risk behaviours, mood, and risk perception in sexual assault and physical risk domains were assessed by testing fiftyone women at menstruation and during their fertile period. Based on the decline in risk behaviours shown in past research, the fertility model predicts that normally ovulating women will display greater risk perception during the fertile phase of their cycle. The mood model predicts that at menstruation, when negative mood is highest, risk perception will be increased and risk behaviours correspondingly reduced. Risk behaviours did not vary over the cycle or between groups. Overall, results support the mood model. Negative mood was greater at menstruation and positive mood during the fertile period for both groups, rational risk perception was correspondingly greater at menstruation. The fertility model was not supported as risk perception ratings did not vary in the expected direction and ratings were not specific to the sexual assault domain.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The present global economic crisis creates doubts about the good use of accumulated experience and knowledge in managing risk in financial services. Typically, risk management practice does not use knowledge management (KM) to improve and to develop new answers to the threats. A key reason is that it is not clear how to break down the “organizational silos” view of risk management (RM) that is commonly taken. As a result, there has been relatively little work on finding the relationships between RM and KM. We have been doing research for the last couple of years on the identification of relationships between these two disciplines. At ECKM 2007 we presented a general review of the literature(s) and some hypotheses for starting research on KM and its relationship to the perceived value of enterprise risk management. This article presents findings based on our preliminary analyses, concentrating on those factors affecting the perceived quality of risk knowledge sharing. These come from a questionnaire survey of RM employees in organisations in the financial services sector, which yielded 121 responses. We have included five explanatory variables for the perceived quality of risk knowledge sharing. These comprised two variables relating to people (organizational capacity for work coordination and perceived quality of communication among groups), one relating to process (perceived quality of risk control) and two related to technology (web channel functionality and RM information system functionality). Our findings so far are that four of these five variables have a significant positive association with the perceived quality of risk knowledge sharing: contrary to expectations, web channel functionality did not have a significant association. Indeed, in some of our exploratory regression studies its coefficient (although not significant) was negative. In stepwise regression, the variable organizational capacity for work coordination accounted for by far the largest part of the variation in the dependent variable perceived quality of risk knowledge sharing. The “people” variables thus appear to have the greatest influence on the perceived quality of risk knowledge sharing, even in a sector that relies heavily on technology and on quantitative approaches to decision making. We have also found similar results with the dependent variable perceived value of Enterprise Risk Management (ERM) implementation.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Enterprise Risk Management (ERM) and Knowledge Management (KM) both encompass top-down and bottom-up approaches developing and embedding risk knowledge concepts and processes in strategy, policies, risk appetite definition, the decision-making process and business processes. The capacity to transfer risk knowledge affects all stakeholders and understanding of the risk knowledge about the enterprise's value is a key requirement in order to identify protection strategies for business sustainability. There are various factors that affect this capacity for transferring and understanding. Previous work has established that there is a difference between the influence of KM variables on Risk Control and on the perceived value of ERM. Communication among groups appears as a significant variable in improving Risk Control but only as a weak factor in improving the perceived value of ERM. However, the ERM mandate requires for its implementation a clear understanding, of risk management (RM) policies, actions and results, and the use of the integral view of RM as a governance and compliance program to support the value driven management of the organization. Furthermore, ERM implementation demands better capabilities for unification of the criteria of risk analysis, alignment of policies and protection guidelines across the organization. These capabilities can be affected by risk knowledge sharing between the RM group and the Board of Directors and other executives in the organization. This research presents an exploratory analysis of risk knowledge transfer variables used in risk management practice. A survey to risk management executives from 65 firms in various industries was undertaken and 108 answers were analyzed. Potential relationships among the variables are investigated using descriptive statistics and multivariate statistical models. The level of understanding of risk management policies and reports by the board is related to the quality of the flow of communication in the firm and perceived level of integration of the risk policy in the business processes.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The aim of this research was to improve the quantitative support to project planning and control principally through the use of more accurate forecasting for which new techniques were developed. This study arose from the observation that in most cases construction project forecasts were based on a methodology (c.1980) which relied on the DHSS cumulative cubic cost model and network based risk analysis (PERT). The former of these, in particular, imposes severe limitations which this study overcomes. Three areas of study were identified, namely growth curve forecasting, risk analysis and the interface of these quantitative techniques with project management. These fields have been used as a basis for the research programme. In order to give a sound basis for the research, industrial support was sought. This resulted in both the acquisition of cost profiles for a large number of projects and the opportunity to validate practical implementation. The outcome of this research project was deemed successful both in theory and practice. The new forecasting theory was shown to give major reductions in projection errors. The integration of the new predictive and risk analysis technologies with management principles, allowed the development of a viable software management aid which fills an acknowledged gap in current technology.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose: The purpose of this paper is to investigate the relations between perceived business uncertainty (PBU), use of external risk management (RM) consultants, formalisation of RM, magnitude of RM methods and perceived organisational outcomes. Design/methodology/approach: This paper is based on a questionnaire survey of members of the Chartered Institute of Management Accountants in the UK. Using AMOS 17.0, the paper tests the strength of the direct and indirect effects among the variables and explores the fit of the overall path model. Findings: The results indicate significant and positive associations exist between the extent of PBU and the level ofRMformalisation, as well as between the level ofRMformalisation and the magnitude of RMmethods adopted. The use of externalRMconsultants is also found to have a significant and positive impact on the magnitude of RM methods adopted. Finally, both the extent of RM formalisation and the magnitude of RM methods adopted are seen to be significantly associated with overall improvement in organisational outcomes. Research limitations/implications: The study uses perceptual measures of the level of business uncertainty, usage of RM and organisational outcomes. Further, the respondents are members of a management accounting professional body and the views of other managers, such as risk managers, who are also important to the governance process are not incorporated. Originality/value: This study provides empirical evidence on the impact ofRMdesign and usage on improvements in organisational outcomes. It contributes to the RM literature where empirical research is needed in order to be comparable with the traditional management control system literature.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper addresses the theme of real options decision-making in multinational corporations (MNCs) and stresses the role of real options attention and managerial learning in company performance. Using a sample of 278 large MNCs with categorised degrees of managerial real options awareness, we examine the risk implications of switching options in multinational operations, and explore the extent to which the real options logic can be classified as “best practice” in decision-making and risk management. Our results reveal that MNCs which have high managerial awareness about their real options are able to reduce their downside risk through multinationality, organisational slack and other firm characteristics. This finding does not apply fully to MNCs without evidence of such an awareness. Also, although real options awareness does not systematically guarantee lower downside risk from operations, supplementary results indicate that MNCs with evidence of significant investment in the acquisition of real options knowledge tend to outperform competitors that are unaware of their real options. This suggests that if real options are explored and exploited appropriately, real options decision-making can result into superior performance for MNCs in the long-term.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Biomass is projected to account for approximately half of the new energy production required to achieve the 2020 primary energy target in the UK. Combined heat and power (CHP) bioenergy systems are not only a highly efficient method of energy conversion, at smaller-scales a significant proportion of the heat produced can be effectively utilised for hot water, space heating or industrial heating purposes. However, there are many barriers to project development and this has greatly inhibited deployment in the UK. Project viability is highly subjective to changes in policy, regulation, the finance market and the low cost incumbent; a high carbon centralised energy system. Unidentified or unmitigated barriers occurring during the project lifecycle may not only negatively impact on the project but could ultimately lead to project failure. The research develops a decision support system (DSS) for small-scale (500 kWe to 10 MWe) biomass combustion CHP project development and risk management in the early stages of a potential project’s lifecycle. By supporting developers in the early stages of project development with financial, scheduling and risk management analysis, the research aims to reduce the barriers identified and streamline decision-making. A fuzzy methodology is also applied throughout the developed DSS to support developers in handling the uncertain or approximate information often held at the early stages of the project lifecycle. The DSS is applied to a case study of a recently failed (2011) small-scale biomass CHP project to demonstrate its applicability and benefits. The application highlights that the proposed development within the case study was not viable. Moreover, further analysis of the possible barriers with the DSS confirmed that some possible modifications to be project could have improved this, such as a possible change of feedstock to a waste or residue, addressing the unnecessary land lease cost or by increasing heat utilisation onsite. This analysis is further supported by a practitioner evaluation survey that confirms the research contribution and objectives are achieved.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This article takes the perspective that risk knowledge and the activities related to RM practice can benefit from the implementation of KM processes and systems, to produce a better enterprise wide implementation of risk management. Both in the information systems discipline and elsewhere, there has been a trend towards greater integration and consolidation in the management of organizations. Some examples of this are: Enterprise Resource Planning (Stevens, 2003), Enterprise Architecture (Zachmann, 1996) and Enterprise Content Management (Smith & McKeen, 2003). Similarly, risk management is evolving into Enterprise Risk Management. KM’s importance in breaking down silos within an organization can help it to do so.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The main purpose of the study is to develop an integrated framework for managing project risks by analyzing risk across project, work package and activity levels, and developing responses. Design/methodology/approach: The study first reviews the literature of various contemporary risk management frameworks in order to identify gaps in project risk management knowledge. Then it develops a conceptual risk management framework using combined analytic hierarchy process (AHP) and risk map for managing project risks. The proposed framework has then been applied to a 1500 km oil pipeline construction project in India in order to demonstrate its effectiveness. The concerned project stakeholders were involved through focus group discussions for applying the proposed risk management framework in the project under study. Findings: The combined AHP and risk map approach is very effective to manage project risks across project, work package and activity levels. The risk factors in project level are caused because of external forces such as business environment (e.g. customers, competitors, technological development, politics, socioeconomic environment). The risk factors in work package and activity levels are operational in nature and created due to internal causes such as lack of material and labor productivity, implementation issues, team ineffectiveness, etc. Practical implications: The suggested model can be applied to any complex project and helps manage risk throughout the project life cycle. Originality/value: Both business and operational risks constitute project risks. In one hand, the conventional project risk management frameworks emphasize on managing business risks and often ignore operational risks. On the other hand, the studies that deal with operational risk often do not link them with business risks. However, they need to be addressed in an integrated way as there are a few risks that affect only the specific level. Hence, this study bridges the gaps. © 2010 Elsevier B.V. All rights reserved.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Risk assessment is crucial for developing risk management plans to prevent or minimize mental health patients' risks that will impede their recovery. Risk assessments and risk management plans should be closely linked. Their content and the extent to which they are linked within one Trust is explored. There is a great deal of variability in the amount and detail of risk information collected by nurses and how this is used to develop risk management plans. Keeping risk assessment information in one place rather than scattered throughout patient records is important for ensuring it can be accessed easily and linked properly to risk management plans. Strengthening the link between risk assessment and management will help ensure interventions and care is tailored to the specific needs of individual patients, thus promoting their safety and well-being. Thorough risk assessment helps in developing risk management plans that minimize risks that can impede mental health patients' recovery. Department of Health policy states that risk assessments and risk management plans should be inextricably linked. This paper examines their content and linkage within one Trust. Four inpatient wards for working age adults (18-65 years) in a large mental health Trust in England were included in the study. Completed risk assessment forms, for all patients in each inpatient ward were examined (n= 43), followed by an examination of notes for the same patients. Semi-structured interviews took place with ward nurses (n= 17). Findings show much variability in the amount and detail of risk information collected by nurses, which may be distributed in several places. Gaps in the risk assessment and risk management process are evident, and a disassociation between risk information and risk management plans is often present. Risk information should have a single location so that it can be easily found and updated. Overall, a more integrated approach to risk assessment and management is required, to help patients receive timely and appropriate interventions that can reduce risks such as suicide or harm to others. © 2011 Blackwell Publishing.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Objective - During pregnancy, the human cervix undergoes angiogenic transformations. VEGF is expressed in cervical stroma and is proposed to play key roles in the process of cervical ripening and dilation. This study was conducted to evaluate whether cervical secretion of VEGF can be of clinical value in predicting impending PTB. Study Design - In an observational prospective cohort study, we analyzed cervical fluid samples from 103 pregnant women (GA: median [IQR]: 28 [25-31] wks) who presented for either a routine prenatal visit (n=61) or for evaluation of threatened preterm labor (n=42). Cervical secretions were collected under a standard protocol which was followed in all cases. Cervical length (CL) was assessed by transvaginal ultrasound using well-established criteria. Dilation was evaluated by digital exam performed only after collection of the biological samples. VEGF levels were immunoassayed by investigators unaware of the clinical outcome. Main exclusion criteria were ruptured membranes, active labor, vaginal bleeding, vaginal exam or intercourse within 24h. Results were analyzed with and without normalization for total protein. Results - 1) Clinical characteristics of the cohort are presented in Table;2) VEGF was detectable in all specimens, with no correlation between its levels, CL, twins or GA at collection; 3) There was an inverse correlation between VEGF and cervical dilation (R=-0.646, P=0.003); 4) Women with cervical dilation =1 cm had lower VEGF compared to those with a closed cervix (P=0.003); 5) Women who experienced PTB within 14 days (n=11) had lower VEGF (P=0.003); 6) A free VEGF level of =600 pg/mL had a sensitivity, specificity, +LR and -LR of 70%, 95%, 13.5 and 0.3, respectively in predicting PTB within 14 days. Conclusions - Low VEGF levels in the cervicovaginal secretions of pregnant women are associated with an increased risk of PTB within 2 weeks of collection. Active engagement of VEGF in the process of cervical ripening and dilatation and/or increased affinity of extracellular matrix components for VEGF may provide explanation for our findings.