923 resultados para Implementation process
Resumo:
The Great Barrier Reef Marine Park, an area almost the size , of Japan, has a new network of no-take areas that significantly improves the protection of biodiversity. The new marine park zoning implements, in a quantitative manner, many of the theoretical design principles discussed in the literature. For example, the new network of no-take areas has at least 20% protection per bioregion, minimum levels of protection for all known habitats and special or unique features, and minimum sizes for no-take areas of at least 10 or 20 kat across at the smallest diameter Overall, more than 33% of the Great Barrier Reef Marine Park is now in no-take areas (previously 4.5%). The steps taken leading to this outcome were to clarify to the interested public why the existing level of protection wets inadequate; detail the conservation objectives of establishing new no-take areas; work with relevant and independent experts to define, and contribute to, the best scientific process to deliver on the objectives; describe the biodiversity (e.g., map bioregions); define operational principles needed to achieve the objectives; invite community input on all of The above; gather and layer the data gathered in round-table discussions; report the degree of achievement of principles for various options of no-take areas; and determine how to address negative impacts. Some of the key success factors in this case have global relevance and include focusing initial communication on the problem to be addressed; applying the precautionary principle; using independent experts; facilitating input to decision making; conducting extensive and participatory consultation; having an existing marine park that encompassed much of the ecosystem; having legislative power under federal law; developing high-level support; ensuring agency Priority and ownership; and being able to address the issue of displaced fishers.
Resumo:
Land-surface processes include a broad class of models that operate at a landscape scale. Current modelling approaches tend to be specialised towards one type of process, yet it is the interaction of processes that is increasing seen as important to obtain a more integrated approach to land management. This paper presents a technique and a tool that may be applied generically to landscape processes. The technique tracks moving interfaces across landscapes for processes such as water flow, biochemical diffusion, and plant dispersal. Its theoretical development applies a Lagrangian approach to motion over a Eulerian grid space by tracking quantities across a landscape as an evolving front. An algorithm for this technique, called level set method, is implemented in a geographical information system (GIS). It fits with a field data model in GIS and is implemented as operators in map algebra. The paper describes an implementation of the level set methods in a map algebra programming language, called MapScript, and gives example program scripts for applications in ecology and hydrology.
Resumo:
Foreign exchange trading has emerged in recent times as a significant activity in many countries. As with most forms of trading, the activity is influenced by many random parameters so that the creation of a system that effectively emulates the trading process is very helpful. In this paper, we try to create such a system with a genetic algorithm engine to emulate trader behaviour on the foreign exchange market and to find the most profitable trading strategy.
Resumo:
Achieving consistency between a specification and its implementation is an important part of software development. In this paper, we present a method for generating passive test oracles that act as self-checking implementations. The implementation is verified using an animation tool to check that the behavior of the implementation matches the behavior of the specification. We discuss how to integrate this method into a framework developed for systematically animating specifications, which means a tester can significantly reduce testing time and effort by reusing work products from the animation. One such work product is a testgraph: a directed graph that partially models the states and transitions of the specification. Testgraphs are used to generate sequences for animation, and during testing, to execute these same sequences on the implementation.
Resumo:
Public policy becomes managerial practice through a process of implementation. There is an established literature within Implementation Studies which explains the variables and some of the processes involved in implementation, but less attention has been focused upon how public service managers convert new policy initiatives into practice. The research proposes that managers and their organisations have to go through a process of learning in order to achieve the implementation of public policy. Data was collected over a five year period from four case studies of capital investment appraisal in the British National Health Service. Further data was collected from taped interviews by key actors within the case studies. The findings suggest that managers do learn to implement policy and four factors are important in this learning process. These are; (i) the nature of bureaucratic responsibility; (ii) the motivation of actors towards learning; (iii) the passage of time which allows for the development of competence and (iv) the use of project team structures. The research has demonstrated that the conversion of policy into practice occurs through the operationalisation of solutions to policy problems via job tasks. As such it suggests that in understanding how policy is implemented, technical learning is more important than cultural learning, in this context. In conclusion, a "Model of Learned Implementation" is presented, together with a discussion of some of the implications of the research. These are the possible use of more pilot projects for new policy initiatives and the more systematic diffusion of knowledge about implementation solutions.
Resumo:
Singapore's electronics manufacturers are facing many questions. In the computer hard-drive industry, where the problem of obsolescence is common and where a product's lifecycle may be only six months, manufacturers are anxious to know what the next order-winning criteria will be. Since low labour costs are no longer a key factor, many organisations are developing their competencies in research and development, sales and marketing, logistics and supply chain management in order to maintain competitiveness. This paper illustrates how Seagate has envisaged a climate of cooperation and collaboration to better serve its customers in the areas of technology, cost and delivery. The paper is based on observations and findings following a longitudinal case study approach at the Seagate Storage Product Group (SPG) in Singapore. The seven-stage implementation framework adopted by Seagate in their SCM project is discussed, together with the process of how Seagate has created a paradigm shift towards a new culture of teamwork-based collaboration.
Resumo:
Purpose - The purpose of the work discussed in this paper is to understand, analyse and benchmark the "Packing and Filling" processes within BASF. A benchmarking project is described in detail which aimed to cover sites in different countries that supplied many different variants of finished goods in order to establish best practice and then to generate some options for their implementation. Design/methodology/approach - The project used an adaptation of accepted benchmarking methodology combined with other techniques (such as rich picture generation, and cluster analysis) to maximise the insight generated. Findings - The findings of the research showed that one of the main factors effecting the process was how third parties were used (e.g. extent and nature of out-sourcing, and its degree of centralisation). Research limitations/ implications - The exercise was challenged by the selection of suitably similar benchmarking candidates because the environment was complex and highly varied; the paper explains practical solutions for dealing with this challenge. Practical limitations - Strategic and tactical options are outlined at the end of the paper and will have applicability to other organisations and industries that are looking to find the answers to frequently asked questions about how to successfully implement an internal process benchmarking project in a large complex organisation that has high variety in end products and delivery methods. Originality/value - The methodology described in this paper is of a proprietary and unique nature. The paper is structured around some key questions commonly asked of benchmarking, and the answers are provided via a real in-depth case study from BASF that spans 4 sites in 3 countries using 15 different filling lines. © Emerald Group Publishing Limited.
Resumo:
Improving healthcare quality is a growing need of any society. Although various quality improvement projects are routinely deployed by the healthcare professional, they are characterised by a fragmented approach, i.e. they are not linked with the strategic intent of the organisation. This study introduces a framework which integrates all quality improvement projects with the strategic intent of the organisation. It first derives the strengths, weaknesses, opportunities and threats (SWOT) matrix of the system with the involvement of the concerned stakeholders (clinical professional), which helps identify a few projects, the implementation of which ensures achievement of desired quality. The projects are then prioritised using the analytic hierarchy process with the involvement of the concerned stakeholders (clinical professionals) and implemented in order to improve system performance. The effectiveness of the method has been demonstrated using a case study in the intensive care unit of Queen Elizabeth Hospital in Bridgetown, Barbados.
Resumo:
Conventionally, oil pipeline projects are evaluated thoroughly by the owner before investment decision is made using market, technical and financial analysis sequentially. The market analysis determines pipelines throughput and supply and demand points. Subsequent, technical analysis identifies technological options and economic and financial analysis then derives the least cost option among all technically feasible options. The subsequent impact assessment tries to justify the selected option by addressing environmental and social issues. The impact assessment often suggests alternative sites, technologies, and/or implementation methodology, necessitating revision of technical and financial analysis. This study addresses these issues via an integrated project evaluation and selection model. The model uses analytic hierarchy process, a multiple-attribute decision-making technique. The effectiveness of the model has been demonstrated through a case application on cross-country petroleum pipeline project in India.
Resumo:
Conventional project management techniques are not always sufficient to ensure time, cost and quality achievement of large-scale construction projects due to complexity in planning, design and implementation processes. The main reasons for project non-achievement are changes in scope and design, changes in government policies and regulations, unforeseen inflation, underestimation and improper estimation. Projects that are exposed to such an uncertain environment can be effectively managed with the application of risk management throughout the project's life cycle. However, the effectiveness of risk management depends on the technique through which the effects of risk factors are analysed/quantified. This study proposes the Analytic Hierarchy Process (AHP), a multiple attribute decision making technique, as a tool for risk analysis because it can handle subjective as well as objective factors in a decision model that are conflicting in nature. This provides a decision support system (DSS) to project management for making the right decision at the right time for ensuring project success in line with organisation policy, project objectives and a competitive business environment. The whole methodology is explained through a case application of a cross-country petroleum pipeline project in India and its effectiveness in project management is demonstrated.
Resumo:
A phenomenon common to almost all fields is that there is a gap between theory and practical implementation. However, this is a particular problem in knowledge management, where much of the literature consists of general principles written in the context of a ‘knowledge world’ that has few, if any, references to how to carry out knowledge management in organisations. In this chapter, we put forward the view that the best way to bridge this gap between general principles and the specific issues facing a given organisation is to link knowledge management to the organisation’s business processes. After briefly reviewing, and rejecting alternative ways in which this gap might be bridged, the chapter goes on to explain the justification for, and the potential benefits and snags of, linking knowledge management to business processes. Successful and unsuccessful examples are presented. We concentrate especially on the issues of establishing what knowledge is relevant to an organisation at present, the need for organisational learning to cope with the inevitable change, and the additional problems posed by the growing internationalisation of operations. We conclude that linking knowledge management in terms of business processes is the best route for organisations to follow, but that it is not the answer to all knowledge management problems, especially where different cultures and/or cultural change are involved.
Resumo:
Purpose – To investigate the role of simulation in the introduction of technology in a continuous operations process. Design/methodology/approach – A case-based research method was chosen with the aim to provide an exemplar of practice and test the proposition that the use of simulation can improve the implementation and running of conveyor systems in continuous process facilities. Findings – The research determines the optimum rate of re-introduction of inventory to a conveyor system generated during a breakdown event. Research limitations/implications – More case studies are required demonstrating the operational and strategic benefits that can be gained by using simulation to assess technology in organisations. Practical implications – A practical outcome of the study was the implementation of a policy for the manual re-introduction of inventory on a conveyor line after a breakdown event had occurred. Originality/value – The paper presents a novel example of the use of simulation to estimate the re-introduction rate of inventory after a breakdown event on a conveyor line. The paper highlights how by addressing this operational issue, ahead of implementation, the likelihood of the success of the strategic decision to acquire the technology can be improved.
Resumo:
This paper presents a case study of the use of business-process simulation within the context of a business-process-reengineering approach to change. The process-based change methodology provides context to the simulation technique in that it connects the aims of a business-process simulation (BPS) study to the strategic aims of the organisation and incorporates a consideration of human factors in order to achieve successful implementation of redesigned processes. Conversely, the ability of BPS to incorporate system variability, scenario analysis and a visual display to communicate process performance makes it a useful technique to provide a realistic assessment of the need for, and results of, change.
Resumo:
A case study demonstrates the use of a process-based approach to change regarding the implementation of an information system for road traffic accident reporting in a UK police force. The supporting tools of process mapping and business process simulation are used in the change process and assist in communicating the current process design and people's roles in the overall performance of that design. The simulation model is also used to predict the performance of new designs incorporating the use of information technology. The approach is seen to have a number of advantages in the context of a public sector organisation. These include the ability for personnel to move from a traditional grouping of staff in occupational groups with relationships defined by reporting requirements to a view of their role in a process, which delivers a performance to a customer. By running the simulation through time it is also possible to gauge how changes at an operational level can lead to the meeting of strategic targets over time. Also the ability of simulation to proof new designs was seen as particularly important in a government agency were past failures of information technology investments had contributed to a more risk averse approach to their implementation. © 2004 Elsevier Ltd. All rights reserved.
Resumo:
In this paper, a co-operative distributed process mining system (CDPMS) is developed to streamline the workflow along the supply chain in order to offer shorter delivery times, more flexibility and higher customer satisfaction with learning ability. The proposed system is equipped with the ‘distributed process mining’ feature which is used to discover the hidden relationships among each working decision in distributed manner. This method incorporates the concept of data mining and knowledge refinement into decision making process for ensuring ‘doing the right things’ within the workflow. An example of implementation is given, based on the case of slider manufacturer.