888 resultados para Historic buildings -- Maryland -- Annapolis
Resumo:
Fil: Zecchin de Fasano, Graciela Cristina. Universidad Nacional de La Plata. Facultad de Humanidades y Ciencias de la Educación; Argentina.
Resumo:
Fil: Errecalde, Alejandro Martín. Universidad Nacional de La Plata. Facultad de Humanidades y Ciencias de la Educación; Argentina.
Resumo:
Paleogene calcareous nannofossils from split spoon cores recovered from five wells along the Coastal Plain of New Jersey and Maryland have been analyzed in order to provide onshore information complementary to that derived from the offshore DSDP Site 605 (upper continental rise off New Jersey). Hiatuses are more numerous and of greater extent in the onshore sections, but the major ones correlate well with those noted in the offshore section. At one site at least (Leggett Well), sedimentation may well have been continuous across the Cretaceous/Tertiary boundary, as it is believed to have been at DSDP Site 605. These various correlations are discussed elsewhere in a companion paper (Olsson and Wise, this volume). Important differences in nannofossil assemblages are noted between the onshore (shelf paleoenvironment) and offshore (slope-rise paleoenvironment) sections. Lithostromation simplex, not present offshore, is consistently present onshore and seems to be confined to the Eocene shelf sediments of this region. The same relationship holds for the zonal marker, Rhabdosphaera gladius Locker. The Rhomboaster-Tribrachiatus plexus is more diverse and better preserved in the onshore sections, where the lowermost Eocene Zone CP9 is well represented. Differential preservation is postulated to account for two morphotypes of Tribrachiatus bramlettei (Brönnimann and Stradner). Type A is represented at DSDP Site 605 by individuals with short, stubby arms, but these forms are not present in the equivalent onshore sections. There they are replaced by the Type B morphotypes, which exhibit a similar basic construction but possess much longer, more delicate arms.
Resumo:
Parameters in the photosynthesis-irradiance (P-E) relationship of phytoplankton were used to calculate daily production at weekly to bi-weekly intervals for 20 years at 6 stations on the Rhode River, Maryland (USA). The objectives of this work were to determine the patterns and controls on the P-E parameters and primary production of phytoplankton in a shallow eutrophic estuary. Additional measurements that are components of calculated daily rates of primary productivity are given: the light-saturation irradiance, photoperiod, maximal noon incident irradiance, optical depth, dimensionless depth integrals, and a correction for spectral selectivity of light absorption. P-E parameters and chlorophyll a concentrations were given in a related dataset, Gallegos (2012, doi:10.1594/PANGAEA.816494).
Resumo:
Parameters in the photosynthesis-irradiance (P-E) relationship of phytoplankton were measured at weekly to bi-weekly intervals for 20 yr at 6 stations on the Rhode River, Maryland (USA). Variability in the light-saturated photosynthetic rate, PBmax, was partitioned into interannual, seasonal, and spatial components. The seasonal component of the variance was greatest, followed by interannual and then spatial. Physiological models of PBmax based on balanced growth or photoacclimation predicted the overall mean and most of the range, but not individual observations, and failed to capture important features of the seasonal and interannual variability. PBmax correlated most strongly with temperature and the concentration of dissolved inorganic carbon (IC), with lesser correlations with chlorophyll a, diffuse attenuation coefficient, and a principal component of the species composition. In statistical models, temperature and IC correlated best with the seasonal pattern, but temperature peaked in late July, out of phase with PBmax, which peaked in September, coincident with the maximum in monthly averaged IC concentration. In contrast with the seasonal pattern, temperature did not contribute to interannual variation, which instead was governed by IC and the additional lesser correlates. Spatial variation was relatively weak and uncorrelated with ancillary measurements. The results demonstrate that both the overall distribution of PBmax and its relationship with environmental correlates may vary from year to year. Coefficients in empirical statistical models became stable after including 7 to 10 yr of data. The main correlates of PBmax are amenable to automated monitoring, so that future estimates of primary production might be made without labor-intensive incubations.
Resumo:
The traditional architecture of the centre of the city of Arequipa has been analyzed by comparing floor-plans of houses from the eighteenth and nineteenth centuries in order to explain the reasons behind the arrangement of their constructional elements and the evolution of said elements and floor-plans. The historic centre of Arequipa, a city located in the South of Perú, South America (Latitude 16°23' South, Longitude 71 °31' West), is based on a ground plan from 1540 that was set during the city's Spanish foundation. It was declared Patrimony of the Humanity by UNESCO. The manorial architecture is widely known for its decorated fronts and one-of-a-kind designs, but its differences with respect to the popular architecture are not based exclusively on decorative aspects. Peru's colonial period finished around 1825, but the barrel-vault, construction style continued in Arequipa through 1868, when an earthquake destroyed the city. Thereafter, the vaults were replaced by roofs made of rails, with cinders made out of the lava stone. The stately houses belonged to the founding families who settled around the main square on forty nine blocks that formed a square-grid, street layout. Also belonging to this category are the houses of landlords and traders from post-colonial times.
Resumo:
The threat of impact or explosive loads is regrettably a scenario to be taken into account in the design of lifeline or critical civilian buildings. These are often made of concrete and not specifically designed for military threats. Numerical simulation of such cases may be undertaken with the aid of state of the art explicit dynamic codes, however several difficult challenges are inherent to such models: the material modeling for the concrete anisotropic failure, consideration of reinforcement bars and important structural details, adequate modeling of pressure waves from explosions in complex geometries, and efficient solution to models of complete buildings which can realistically assess failure modes. In this work we employ LS-Dyna for calculation, with Lagrangian finite elements and explicit time integration. Reinforced concrete may be represented in a fairly accurate fashion with recent models such as CSCM model [1] and segregated rebars constrained within the continuum mesh. However, such models cannot be realistically employed for complete models of large buildings, due to limitations of time and computer resources. The use of structural beam and shell elements for this purpose would be the obvious solution, with much lower computational cost. However, this modeling requires careful calibration in order to reproduce adequately the highly nonlinear response of structural concrete members, including bending with and without compression, cracking or plastic crushing, plastic deformation of reinforcement, erosion of vanished elements etc. The main objective of this work is to provide a strategy for modeling such scenarios based on structural elements, using available material models for structural elements [2] and techniques to include the reinforcement in a realistic way. These models are calibrated against fully three-dimensional models and shown to be accurate enough. At the same time they provide the basis for realistic simulation of impact and explosion on full-scale buildings
Resumo:
The improvement of energy efficiency in existing buildings is always a challenge due to their particular, and sometimes protected, constructive solutions. New constructive regulations in Spain leave a big undefined gap when a restoration is considered because they were developed for new buildings. However, rehabilitation is considered as an opportunity for many properties because it allows owners to obtain benefits from the use of the buildings. The current financial and housing crisis has turned society point of view to existing buildings and making them more efficient is one of the Spanish government’s aims. The economic viability of a rehabilitation action should take all factors into account: both construction costs and the future operative costs of the building must be considered. Nevertheless, the application of these regulations in Spain is left to the designer’s opinion and always under a subjective point of view. With the research work described in this paper and with the help of some case-studies, the cost of adapting an existing building to the new constructive regulations will be studied and Energetic Efficiency will be evaluated depending on how the investment is recovered. The interest of the research is based on showing how new constructive solutions can achieve higher levels of efficiency in terms of energy, construction and economy and it will demonstrate that Life Cycle Costing analysis can be a mechanism to find the advantages and disadvantages of using these new constructive solutions. Therefore, this paper has the following objectives: analysing constructive solutions in existing buildings - to establish a process for assessing total life cycle costs (LCC) during the planning stages with consideration of future operating costs - to select the most advantageous operating system – To determine the return on investment in terms of construction costs based on new techniques, the achieved energy savings and investment payback periods.
Resumo:
The problem is general: modern architects and engineers are trying to understand historic structures using the wrong theoretical frame, the classic (elastic) thery of structures developed in the 19th Century for iron and stell, and in the 20th century for reinforced concrete, disguised with "modern" computer packages, mainly FEM, but also others. Masonry is an essentially different material, and the structural equations must be adapted accordingly. It is not a matter of "taste" or "opinion", and the consequences are before us. Since, say 1920s, historic monuments have suffered the aggression of generations of archietcts and engineers, trying to transform masonry in reinfored concrete or steel. The damage to the monuments and the expense has been, and is, enormous. However, as we have an adequate theory (modern limit analysis of masonry structures, Heyman 1966) which encompasses the "old theory" used successfully by the 18th and 19th Century practical engineers (from Perronet to Sejourné), it is a matter of "Ethics" not to use the wrong approach. It is also "contra natura" to modify the material masonry with indiscriminate injections, stitchings, etc. It is insane to consider, suddenly, that buildings which are Centuries or milennia old, are suddenly in danger of collapse. Maintenance is necessary but not the actual destruction of the constructive essence of the monument. A cocktail of "ignorance, fear and greed" is acting under the best of intentions.
Resumo:
In Brazil, a low-latitude country characterized by its high availability and uniformity of solar radiation, the use of PV solar energy integrated in buildings is still incipient. However, at the moment there are several initiatives which give some hints that lead to think that there will be a change shortly. In countries where this technology is already a daily reality, such as Germany, Japan or Spain, the recommendations and basic criteria to avoid losses due to orientation and tilt are widespread. Extrapolating those measures used in high latitudes to all regions, without a previous deeper analysis, is standard practice. They do not always correspond to reality, what frequently leads to false assumptions and may become an obstacle in a country which is taking the first step in this area. In this paper, the solar potential yield for different surfaces in Brazilian cities (located at latitudes between 0° and 30°S) are analyzed with the aim of providing the necessary tools to evaluate the suitability of the buildings’ envelopes for photovoltaic use
Resumo:
E.1027, Maison en bord de mer is a small villa in Roquebrune Cap-Martin, built by architects Eileen Gray and Jean Badovici between 1926 and 1929. It was hailed as a landmark of modern architecture, and then forgotten. Over the years many transformations have been carried out, and these changes have altered the spatial qualities of the original project. Time and neglect have taken their toll, and until 2008 the villa was abandoned, a shadow of its former self. In order to state an appropriate restoration, a description of the house and its historic evolution has been made, comparing plans of its different transformations. After compiling the most common pathologies and restoration procedures in buildings of the Modern Movement in general, the particular pathologies of E.1027 are presented, concluding with a restoration proposal for E.1027 that considers aesthetical as well as technical aspects. This study involves an attempt to establish guidelines for the theoretical and technical aspects for restoration of architecture of the Modern Movement, using the Maison en bord de mer as an example.
Resumo:
In the year 1999 approves the Law of Construction Building (LOE, in Spanish) to regulate a sector such as construction, which contained some shortcomings from the legal point of view. Currently, the LOE has been in force 12 years, changing the spanish world of the construction, due to influenced by internationalization. Within the LOE, there regulating the different actors involved in the construction building, as the Projects design, the Director of Construction, the developer, The builder, Director of execution of the construction (actor only in Spain, similar as construcion engineer and abroad in), control entities and the users, but lacks figure Project manager will assume the delegation of the promoter helping and you organize, direct and management the process. This figure assumes that the market and contracts are not legally regulated in Spain, then should define and establish its regulation in the LOE. (Spain Construction Law) The translation in spanish of the words "Project Manager is owed to Professor Rafael de Heredia in his book Integrated Project Management, as agent acting on behalf of the organization and promoter assuming control of the project, ie Integraded Project Management . Already exist in Spain, AEDIP (Spanish Association Integrated of Project Construction management) which comprises the major companies in “Project Management” in Spain, and MeDIP (Master in Integrated Construction Project) the largest and most advanced studies at the Polytechnic University of Madrid, in "Construction Project Management" they teach which is also in Argentina. The Integrated Project ("Project Management") applied to the construction process is a methodological technique that helps to organize, control and manage the resources of the promoters in the building process. When resources are limited (which is usually most situations) to manage them efficiently becomes very important. Well, we find that in this situation, the resources are not only limited, but it is limited, so a comprehensive control and monitoring of them becomes not only important if not crucial. The alternative of starting from scratch with a team that specializes in developing these follow directly intervening to ensure that scarce resources are used in the best possible way requires the use of a specific methodology (Manual DIP, Matrix Foreign EDR breakdown structure EDP Project, Risk Management and Control, Design Management, et ..), that is the methodology used by "Projects managers" to ensure that the initial objectives of the promoters or investors are met and all actors in process, from design to construction company have the mind aim of the project will do, trying to get their interests do not prevail over the interests of the project. Among the agents listed in the building process, "Project Management" or DIPE (Director Comprehensive building process, a proposed name for possible incorporation into the LOE, ) currently not listed as such in the LOE (Act on Construction Planning ), one of the agents that exist within the building process is not regulated from the legal point of view, no obligations, ie, as is required by law to have a project, a builder, a construction management, etc. DIPE only one who wants to hire you as have been advanced knowledge of their services by the clients they have been hiring these agents, there being no legal obligation as mentioned above, then the market is dictating its ruling on this new figure, as if it were necessary, he was not hired and eventually disappeared from the building process. As the aim of this article is regular the process and implement the name of DIPE in the Spanish Law of buildings construction (LOE)
Resumo:
The need of the Bourbon monarchy to build a Naval Base in the Bay of Cartagena (Spain) during the eighteenth century, implied performing various actions on the environment which allowed the construction of the new dock. One of the priority actions was the transformation of the watershed of the streams that flowed into Mandaraches´s sea. For this reason, a dike was designed and constructed in the northern part of the city. The design of this great work, which was designed as a fortification of the city, was subject to considerable uncertainties. Its proximity to the city involved the demolition of several buildings in the San Roque´s neighborhood. The greater or lesser number of affected buildings and the value of the just indemnification for the expropriation of them, become decisive factors to determine if the work was viable for the Royal Estate or not.
Resumo:
Nearly 3000 slaughterhouses (74% of them public facilities) were built in Spain during the last decades of the nineteenth century and the first half of the twentieth century. The need to comply with new technical requirements and regulations on the hygiene of the meat passed in the 70s and the gradual replacement of public facilities by larger and more modern private slaughterhouses have subsequently led to the closure and abandonment of many of these buildings. Public slaughterhouses generally consisted of several single-storey and open-plan buildings located around a courtyard. Although originally they were preferably located on the outskirts of the towns, many slaughterhouses are now placed inside the built up areas, due to the urban development. The present work aims to contribute to a better understanding of these agro-industrial buildings and to provide ideas for their conservation and reuse. A review on the historical evolution and the architectural features of the public slaughterhouses in Spain is presented and different examples of old vacant slaughterhouses reused to accommodate libraries, offices, community centres, exhibition halls or sports centres, among others, are shown in the paper.
Resumo:
A number of short-to-mid height RC buildings with wide beams have been constructed in moderate-seismicity areas of Spain. The seismic behavior in the direction of the wide beams appears to be deficient because of low lateral strength, low ductility of the wide beams, big strut compressive forces inside the column-beam connections, and unreliable contribution of the spandrel zones of the wide beams. In the orthogonal direction, the behavior is worse since only the joists and the façade beams contribute to the lateral resistance. The objective is to assess the seismic capability of these structures; further research will involve proposing retrofit strategies. The research approach consists of selecting a number of representative buildings and evaluating their vulnerability by code-type, push-over and dynamic analyses. The cooperation of the masonry infill walls is accounted for. The main conclusion is that the seismic behavior of these buildings is inadequate in most of the situations.