784 resultados para Ginseng industry -- Australia
Resumo:
Technology is continually changing, and evolving, throughout the entire construction industry; and particularly in the design process. One of the principal manifestations of this is a move away from team working in a shared work space to team working in a virtual space, using increasingly sophisticated electronic media. Due to the significant operating differences when working in shared and virtual spaces adjustments to generic skills utilised by members is a necessity when moving between the two conditions. This paper reports an aspect of a CRC-CI research project based on research of ‘generic skills’ used by individuals and teams when engaging with high bandwidth information and communication technologies (ICT). It aligns with the project’s other two aspects of collaboration in virtual environments: ‘processes’ and ‘models’. The entire project focuses on the early stages of a project (i.e. design) in which models for the project are being developed and revised. The paper summarises the first stage of the research project which reviews literature to identify factors of virtual teaming which may affect team member skills. It concludes that design team participants require ‘appropriate skills’ to function efficiently and effectively, and that the introduction of high band-width technologies reinforces the need for skills mapping and measurement.
Resumo:
This report draws upon the latest research to examine giving trends by affluent individuals in Australia and how these compare with overseas counterparts. It is driven by several factors. Giving by individuals matters enormously to the nonprofit sector, far exceeding business donations. Whether the richest of the population gives commensurate with their wealth is a question worth asking.
Resumo:
The Australian construction industry is moving towards the implementation of a voluntary code of practice (VCP) for occupational health and safety (OHS). The evidence suggests that highly-visible clients and project management firms, in addition to their subcontractors, will embrace such a code, while smaller firms not operating in high-profile contracting regimes may prove reticent. This paper incorporates qualitative data from a research project commissioned by Engineers Australia and supported by the Australian Contractors’ Association, Property Council of Australia, Royal Australian Institute of Architects, Association of Consulting Engineers Australia, Australian Procurement and Construction Council, Master Builders Australia and the Australian CRC for Construction Innovation. The paper aims to understand the factors that facilitate or prevent the uptake of the proposed VCP by smaller firms, together with pathways to adoption.
Resumo:
The majority of Australian construction firms are small businesses, with 97% of general construction businesses employing less than 20 employees and 85% employing less than five employees (Lin and Mills, 2001; Lingard and Holmes, 2001). The Australian Bureau of Statistics’ definition of a small to medium enterprise was used for the purpose of this study (McLennan, 2000). This included small business employing less than twenty people and medium business employing less than 200 people. Although small to medium enterprises (SME) make up the major share of construction organisations in Australia, there is a paucity of published research in relation to occupational health and safety (OHS) issues for this group. Typically, SME organisations “are frequently undercapitalized and depend on continuous cash flow for their continued business” (Cole, 2003; 12). Research by Lin and Mills (2001) indicates that these factors influence the smaller operators’ ability and motivation to achieve high levels of OHS compared to larger firms which tend to integrate OHS into their management systems. According to Lin and Mills (2001; 137) small firms “do not feel the need to focus on OHS in their management systems, instead they often believe that the control of risk is the responsibility of employees”. This report documents findings from a qualitative research study that examined SME organisations’ views of a newly developed voluntary code of practice (VCOP), and ways in which they might implement the code in their businesses. The research also explored respondents’ awareness of current safety issues in industry in the context of their personal experiences.
Resumo:
In Australia, an average 49 building and construction workers have been killed at work each year since 1997-98. Building/construction workers are more than twice as likely to be killed at work, than the average worker in all Australian industries. The ‘Safer Construction’ project, funded by the CRC-Construction Innovation and led by a task force comprising representatives of construction clients, designers and constructors, developed a Guide to Best Practice for Safer Construction. The Guide, which was informed by research undertaken at RMIT University, Queensland University of Technology and Curtin University, establishes broad principles for the improvement of safety in the industry and provides a ‘roadmap’ for improvement based upon lifecycle stages of a building/construction project. Within each project stage, best practices for the management of safety are identified. Each best practice is defined in terms of the recommended action, its key benefits, desirable outcomes, performance measures and leadership. ‘Safer Construction’ practices are identified from the planning to commissioning stages of a project. The ‘Safer Construction’ project represents the first time that key stakeholder groups in the Australian building/construction industry have worked together to articulate best practice and establish an appropriate basis for allocating (and sharing) responsibility for project safety performance.
Resumo:
Capital works procurement and its regulatory policy environment within a country can be complex entities. For example, by virtue of Australia’s governmental division between the Commonwealth, states and local jurisdictions and the associated procurement networks and responsibilities at each level, the tendering process is often convoluted. There are four inter-related key themes identified in the literature in relation to procurement disharmony, including decentralisation, risk & risk mitigation, free trade & competition, and tendering costs. This paper defines and discusses these key areas of conflict that adversely impact upon the business environments of industry through a literature review, policy analysis and consultation with capital works procurement stakeholders. The aim of this national study is to identify policy differences between jurisdictions in Australia, and ascertain whether those differences are a barrier to productivity and innovation. This research forms an element of a broader investigation with an aim of developing efficient, effective and nationally harmonised procurement systems. Keywords: capital works, procurement policy reform Acknowledgement: The research described in this paper carried out by the Australian Cooperative Research Centre for Construction Innovation.
Resumo:
As regulators, governments are often criticised for over‐regulating industries. This research project seeks to examine the regulation affecting the construction industry in a federal system of government. It uses a case study of the Australian system of government to focus on the question of the implications of regulation in the construction industry. Having established the extent of the regulatory environment, the research project considers the costs associated with this environment. Consequently, ways in which the regulatory burden on industry can be reduced are evaluated. The Construction Industry Business Environment project is working with industry and government agencies to improve regulatory harmonisation in Australia, and thereby reduce the regulatory burden on industry. It is found that while taxation and compliance costs are not likely to be reduced in the short term, costs arising from having to adapt to variation between regulatory regimes in a federal system of government, seem the most promising way of reducing regulatory costs. Identifying and reducing adaptive costs across jurisdictional are argued to present a novel approach to regulatory reform.
Resumo:
Construction sector policy makers have the opportunity to create improvements and develop economic, social and environmental sustainability through supply chain economics. The idea of the supply chain concept to improve firm behaviour and industry performance is not new. However there has been limited application and little or no measurement to monitor successful implementation. Often purchasing policies have been developed with sound strategic procurement principles but even these have had limited penetration in to the processes and practices of infrastructure agencies. The research reported in this paper documents an action research study currently being undertaken in the Australian construction sector which aims to explore supply chain economic policy implementation for sectoral change by two government agencies. The theory which informs this study is the emerging area of construction supply chain economics. There are five stages to the project including; demand analysis, chain analysis, government agency organizational audit, supplier strategy and strategic alignment. The overall objective is towards the development of a Supplier Group Strategy Map for two public sector agencies. Two construction subsectors are examined in detail; construction and demolition waste and precast concrete. Both of these subsectors are critical to the economic and environmental sustainability performance of the construction sector and the community as a whole in the particular jurisdictions. The local and state government agencies who are at the core of the case studies rely individually on the performance of these sectors. The study is set within the context of a sound state purchasing policy that has however, had limited application by the two agencies. Partial results of the study are presented and early findings indicate that the standard risk versus expenditure procurement model does not capture the complexities of project, owner and government risk considerations. A new model is proposed in this paper, which incorporates the added dimension of time. The research results have numerous stakeholders; they will hold particular value for those interested in regional construction sector economics, government agencies who develop and implement policy and who have a large construction purchasing imprint and the players involved in the two subsectors. Even though this is a study in Australia it has widespread applicability as previous research indicates that procurement reform is of international significance and policy implementation is problematic.
Resumo:
The commercialisation of therapeutic products containing regenerative human tissue is regulated by the common law, statute and ethical guidelines in Australia and England, Wales and Northern Ireland. This article examines the regulatory regimes in these jurisdictions and considers whether reform is required to both support scientific research and ensure conformity with modern social views on medical research and the use of human tissue. The authors consider the crucial role of informed consent in striking the balance between the interests of researchers and the interests of the public.
Resumo:
This paper presents a secure communication protocol which can be used as the framework for an e-tendering scheme. This protocol is focused on securing the integrity of tendering documents and ensuring that a secure record of document generation is kept. Our protocol provides a mechanism to manage e-tendering contract evidence as a legal record in a unique and effective manner. It is the starting point of reliable record keeping. To a certain extent, it also addresses existing security problems in the traditional tendering processes.
Resumo:
This paper summarises findings from a survey of user behaviors and intentions towards digital media and information in Australia. It was undertaken in the first quarter of 2009 by the Queensland University of Technology Creative Industries Faculty and was funded by the Smart Services Cooperative Research Centre. The survey targeted users of 2 news and information sites that are available online only. Findings highlighted differences between the 18-24 year age segment and older users. Social networks (specifically friends and family) were rated as the least reliable, relevant and accurate sources of news. Other findings indicate online news sources that are associated with an established newspaper are highly valued as reliable, relevant and accurate news sources by most people. While most people prefer to use online news sources, there is a great deal of variation in the ways in which people actually use online news. From a total of 524 respondents to the survey it was possible to identify three main types of online news consumers: convenience, loyal and customising users.
Resumo:
The road and transport industry in Australia and overseas has come a long way to understanding the impact of road traffic noise on the urban environment. Most road authorities now have guidelines to help assess and manage the impact of road traffic noise on noise-sensitive areas and development. While several economic studies across Australia and overseas have tried to value the impact of noise on property prices, decision-makers investing in road traffic noise management strategies have relatively limited historic data and case studies to go on. The perceived success of a noise management strategy currently relies largely on community expectations at a given time, and is not necessarily based on the analysis of the costs and benefits, or the long-term viability and value to the community of the proposed treatment options. With changing trends in urban design, it is essential that the 'whole-of-life' costs and benefits of noise ameliorative treatment options and strategies be identified and made available for decisionmakers in future investment considerations. For this reason, CRC for Construction Innovation Australia funded a research project, Noise Management in Urban Environments to help decision-makers with future road traffic noise management investment decisions. RMIT University and the Queensland Department of Main Roads (QDMR) have conducted the research work, in collaboration with the Queensland Department of Public Works, ARUP Pty Ltd, and the Queensland University of Technology. The research has formed the basis for the development of a decision-support software tool, and helped collate technical and costing data for known noise amelioration treatment options. We intend that the decision support software tool (DST) should help an investment decision-maker to be better informed of suitable noise ameliorative treatment options on a project-by-project basis and identify likely costs and benefits associated with each of those options. This handbook has been prepared as a procedural guide for conducting a comparative assessment of noise ameliorative options. The handbook outlines the methodology and assumptions adopted in the decision-support framework for the investment decision-maker and user of the DST. The DST has been developed to provide an integrated user-friendly interface between road traffic noise modelling software, the relevant assessment criteria and the options analysis process. A user guide for the DST is incorporated in this handbook.
Resumo:
Many factors have the potential to influence human health. These factors need to be monitored to maintain health. As is the case with human health, construction projects have a number of critical factors that can facilitate a broad evaluation of project health. In order to use these factors as an indication of health, they need to be assessed. This assessment can help to achieve desired outcomes for the project. This paper discusses the approach of assessing Critical Success Factors (CSFs) using Key Performance Indicators (KPIs) to ascertain the immediate health of a construction project. This approach is applicable to all phases of construction projects and many construction procurement methods. KPIs have been benchmarked on the basis of industry standards and historical data. The robustness of the KPIs to assess the immediate health of a project has been validated using Australian and international case studies.
Resumo:
The literature and anecdotal evidence suggests that that there is more to tenancy selection (firm location) than the profit maximisation drive that traditional neo-classical economic location theory suggests. In the first instance these models assume property markets are rational and perfectly competitive; the CBD office market is clearly neither rational nor perfectly competitive. This fact alone relegates such models to the margins of usefulness for an industry that seeks to satisfy tenant demand in order to optimise returns on capital invested. Acknowledgment of property market imperfections are universally accepted to the extent that all contemporary texts discuss the lack of a coherent centralised market place and incomplete and poorly disseminated information processes as fundamental inadequacies which characterise the property market inefficiencies. Less well researched are the facets of the market which allow the observer to determine market activity to be significantly irrational. One such facet is that of ‘decision maker preferences’. The decision to locate a business operation at one location as opposed to another seems ostensibly a routine choice based on short, medium and long term business objectives. These objectives are derived from a process of strategic planning by one or more individuals whose goal is held to be to optimise outcomes which benefit the business (and presumably those employed within it). However the decision making processes appear bounded by how firms function, the institutional context in which they operate, as well as by opportunistic behaviour by individual decision makers who allow personal preferences to infiltrate and ‘corrupt’ the process. In this way, history, culture, geography, as well as institutions all become significant to the extent that these influence and shape individual behaviour which in turn determine the morphology of individual preferences, as well as providing a conduit for them to take effect. This paper exams historical and current literature on the impact of individual behaviour in the decision making process within organisations as a precursor to an investigation of the tenancy decision making process within the CBD office market. Literature on the topic falls within a number of research disciplines, philosophy, psychology and economics to name a few.