764 resultados para ERP BPR EnterpriseMobility BPMN ChangeManagement


Relevância:

10.00% 10.00%

Publicador:

Resumo:

Pós-graduação em Engenharia Mecânica - FEG

Relevância:

10.00% 10.00%

Publicador:

Resumo:

BACKGROUND: The relevance of left ventricular (LV) geometric pattern after myocardial infarction is not known. OBJECTIVES: To analyze the presence of different LV geometric patterns and teir impact as a predictor of remodeling in patients with myocardial infarction. METHODS: Patients with anterior acute myocardial infarction (n = 80) were divided according to the geometric pattern: normal (normal left ventricular mass index [LVMI] and normal relative wall thickness [RWT]), concentric remodeling (normal LVMI and increased RWT), concentric hypertrophy (increased LVMI and RWT) and eccentric hypertrophy (increased LVMI and normal RWT). After six months, echocardiographic assessment was repeated. RESULTS: Four patients died. Of the survivors, 41 showed remodeling (R +), whereas 39 did not (R-). Considering the geometric pattern, the cases were distributed as follows: 24 patients with normal pattern, 13 with concentric remodeling, 29 with concentric hypertrophy and 14 with eccentric hypertrophy. Patients who showed remodeling had larger infarction sizes analyzed by peak CPK (R + = 4,610 (1,688-7,970), R- = 1,442 (775-4247), p <0.001) and CK-MB (R + = 441 (246 - 666), R- = 183 (101-465), p <0.001), trend towards higher prevalence of concentric remodeling (R+ = 10, R- = 3, p = 0.08) and lower prevalence of eccentric hypertrophy (R + = 2 R- = 12, p = 0.006). In the multivariate regression analysis, infarction size was a predictor (OR = 1.01, p = 0.020) and eccentric hypertrophy was a protective factor (OR = 0.189, p = 0.046) of ventricular remodeling after coronary occlusion. CONCLUSION: The LV geometric pattern of can have an impact on the remodeling process in patients with myocardial infarction.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Accuracy in physical inventory process is essential to develop anefficient inventorycontrol. This ensures the availability of products and ensure that the information contained in the information systems areinaccordancewith the reality of inventories. The inventory management policies of the company aim ofthis study established that all the materials in their inventory must becounted, which is proving a challenge. Therefore, the aim of thiswork is to identify the critical inventories and analyze them, seeking flaws and possible improvements in the inventory count process. For this, we used the tools of quality management, such as Pareto and Cause and Effect Diagrams in an action research. The results show that the stocks of finished products are critical in volume and can be hampered by a lack of training and personnel trained in performing the process, as well as limitations in ERP used. With the actions taken against these problems, we could notice an improvement in the process, because the data collection and processing of data has become easier, besides the occurrence of errors decreased. In addition, there was an acceleration in meeting targets compared to the previous period

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This work is an action research conducted in an industry of consumer goods, presenting a new model of inventory management in the company's processors. This replacement of the inventory management of the company stemmed from the need to reduce the large number of deviations in the product write off in stock, thereby generating a low accuracy and reliability of data on inventories of processors shown by the company's ERP system. Spending on inventory adjustments could thus be reduced with the implementation of the new model, thus generating a cost savings for the company and thus increasing their competitive potential in the market. In the old system adopted by the company, write off raw material inventory was done automatically by the system for customized transactions by the company. However, since the implementation of ERP in the company, the automatic write off based on historical consumption of each product were made in many cases at random, generating a lot of mistakes. The new management system has replaced the automatic system by manual at the time of the return of the processed product in the company, thus creating a control which lots and quantities were consumed in the processing and making the stock shown by the ERP reliable and accurate

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Over the last decades changes have occurred in communication within and between enterprises, made easier by technologies suchas E-commerce, Internet, ERP systems and remote meetings and there was a rapid progress in network technology, which has changed the way business is done. A standardized way to offer services over the internet is using web services. Web services are a kind of remote procedure call and are generally used to integrate systems, independent of language, both client and server. It is common to use several web services run in sequence to perform a business process. To this type of process, gives the name of workflow. Thus, Web services are the primary components of workflows. A tool that provides a way of visualizing the behavior of a workflow can assist the administrator and is required. The present work presents the development of a tool that allows the administrator to classify visually services components and evaluate their importance in the final performance of a workflow. As proof of concept we used several virtual servers and computers where each computer has received a set of web services. A proxy was added between each call of workflows collecting relevant information and storing them in a database for later analysis. The analysis was based on Quality of Service parameters

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Companies that invest in current technologies maintain themselves updated, improve their business rules and anticipate themselves against rivals providing a better service to their customers. This project aims to develop an ERP - Enterprise Resource Planning module for Android which complements an existing manager system and, that attends the needs of a rental equipment business for civil building, i.e., it improves the communication channel company-client and betters the identification and control of products. During the developing of this project, it was necessary to study the company business rules, analyze the requirements and the appropriate technologies. This project was organized in two parts, contemplating e ach of these needs. It were implemented specific modules for generate budgets and pre-orders in the first part and, the use of radiofrequency tags in the second one. Thus, it was possible to assign mobility to company business rules so that a better rental service can be provided and the equipments can be better managed

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The adoption of ERPs systems by small and middle-sized companies may not be possible due to their cost. At the same time, when adapting ERP to the company's particular needs, the user keeps depending on the system's sellers due to the lack of access and knowledge of the respective code. Free and open-source software may promote advantages to the enterprises, however, for its adoption it is necessary the development of techniques and tools in order to facilitate its deployment and code maintenance. This article emphasizes the importance of defining modeling architectures and reference models for the development and maintenance of open-source ERPs, in special the ERP5 project.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The evolution and phenotypic expression of mucosal lesions of the gastric stump were investigated in male rats submitted to gastric resection with reconstruction by the Billroth II technique (BII with biliopancreatic reflux, BPR) or by the Roux-en-Y procedure (without BPR). Animals were studied at 24, 36, 54 and 64 weeks after surgery and the phenotypic expression of lesions analysed using routine hematoxylin and eosin staining, immunohistochemical staining for pepsinogen isoenzyme 1 and histochemical procedures for mucins (paradoxical concanavalin A, galactose oxidase Schiff (GOS) and sialidase GOS reactions). BPR was found to be responsible for the formation of adenomatous hyperplasia (AH), increasing in incidence and size with time, since the Roux-en-Y procedure failed to induce the gastric stump lesions observed after BII reconstruction. AHs always occurred in the transition of the gastrojejunal junction, a site offering special conditions for BPR influence, and were classified as gastric (G), intestinal (I) and G+I types according to their phenotypic expression. No pure I type AH was diagnosed at any time point. The G and G+I types developed at approximately equal incidences (i.e., G type 7/17, G+I type 10/17 at the 64th week). It was suggested that both gastric and intestinal mucosal elements were stimulated to proliferate by BPR, with the gastric mucosa tending to demonstrate AH. Intestinal type components of AH were found adjacent to the jejunum and not at the stomach margin, indicating an origin from intestinal mucosa. No metaplasia of the gastric mucosa was observed in any animal after partial gastric resection. In 101 rats submitted to the BII procedure, 5 mucinous adenocarcinomas were eventually diagnosed, mostly located in the subserosa of the gastrojejunal junction. All carcinomas expressed the phenotype of cells of the small intestine. Evidence of malignant transformation within the gastric components of AH was not observed even at the 64th week. In conclusion, all lesions induced by BPR in the rat remnant stomach are benign, and the few true cancers that arise in association are derived from the small intestine.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Innovation in the field of Information Technology (IT) have made companies evaluate their processes and activity of its supply chain to conform to this new reality. In the supply chain management, one of the tools that revolutionized the activities was the use of management information systems such as ERP tool. This system allows greater integration of data from multiple areas of the enterprise and beyond, giving more activities to processes and activities. This work aims to analyze the results and impacts of the restructuring of an equipment leasing process in a Brazilian media company and verify that the gains and improvements that were targeted in the initial design of this restructuring have been achieved. Also the risks identified with this change will be studied, the reactions of those involved in this process and the performance of the chain as a whole. To carry out this work was carried out a single case study with data collection in the assessed company and literature related to supply chain and information systems

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Innovation in the field of Information Technology (IT) have made companies evaluate their processes and activity of its supply chain to conform to this new reality. In the supply chain management, one of the tools that revolutionized the activities was the use of management information systems such as ERP tool. This system allows greater integration of data from multiple areas of the enterprise and beyond, giving more activities to processes and activities. This work aims to analyze the results and impacts of the restructuring of an equipment leasing process in a Brazilian media company and verify that the gains and improvements that were targeted in the initial design of this restructuring have been achieved. Also the risks identified with this change will be studied, the reactions of those involved in this process and the performance of the chain as a whole. To carry out this work was carried out a single case study with data collection in the assessed company and literature related to supply chain and information systems

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The exceptional advance of information technology and computer application to the mineral sector has allowed the automation of several processes of the mineral value chain. ERP systems (Enterprise Resource Planning) provided the platform for the efficient integration of all support activities of the mineral value chain. Despite all advances gathered with the application of computers, it was not possible to date, to effectively integrate the primary activities of the mineral value chain. The main reason for that are the uncertainties present in the productive process, which are intrinsic to the business, and the difficulty to quantify and qualify the benefits obtained with this integration due to the lack of a clear definition of the key performance indicators (KPIs). This work presents an analysis of the ERP systems application in Brazilian mining, identifies the KPIs of some of the most important Brazilian mining companies, and discusses the importance of mapping and measuring these indicators for the effective. management of the mining business.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Companies are currently choosing to integrate logics and systems to achieve better solutions. These combinations also include companies striving to join the logic of material requirement planning (MRP) system with the systems of lean production. The purpose of this article was to design an MRP as part of the implementation of an enterprise resource planning (ERP) in a company that produces agricultural implements, which has used the lean production system since 1998. This proposal is based on the innovation theory, theory networks, lean production systems, ERP systems and the hybrid production systems, which use both components and MRP systems, as concepts of lean production systems. The analytical approach of innovation networks enables verification of the links and relationships among the companies and departments of the same corporation. The analysis begins with the MRP implementation project carried out in a Brazilian metallurgical company and follows through the operationalisation of the MRP project, until its production stabilisation. The main point is that the MRP system should help the company's operations with regard to its effective agility to respond in time to demand fluctuations, facilitating the creation process and controlling the branch offices in other countries that use components produced in the matrix, hence ensuring more accurate estimates of stockpiles. Consequently, it presents the enterprise knowledge development organisational modelling methodology in order to represent further models (goals, actors and resources, business rules, business process and concepts) that should be included in this MRP implementation process for the new configuration of the production system.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Introdução: vários fatores estão associados à lesão de isquemia fria (IF) e referfusão quente (RQ) no transplante hepático (TxH), tais como infiltrado de neutrófilos e linfo-plasmocitário, liberação de citoquinas inflamatórias e apoptose. Porém, pouco se conhece sobre o papel da IF/RQ em enxertos esteatóticos. Objetivo: avaliar o papel da lesão de IF/RQ no TxH em humanos comparando enxertos esteatóticos e não esteatóticos. Métodos: entre maio/02 e março/07 foram realizadas 84 biópsias pós reperfusão (2hs após RQ) e 18 pré reperfusão, totalizando-se 84 TxH em 82 pacientes. As biópsias foram agrupadas em 5 grupos, de acordo com o grau de macro e microesteatose: GEL – leve (<30%), GEM – moderada (30-59%), GEG - grave (≥60%), GEA - sem esteatose, GPR-pré-reperfusão. Nas 102 biópsias foram analisadas: porcentagens de macro e microesteatose, graus de exudato de neutrófilos (0-3) e infiltrado linfo-plasmocitário portal (0-3), índices de apoptose (métodos de Túnel e Caspase- 3) e de ICAM-1. As esteatoses macro (n=49) e microvesicular (n=74) foram individualmente analisadas e classificadas em graus leve (G1), moderado (G2) e grave (G3) e ausente (G4). Resultados: o índice de apoptose (TUNEL) foi: GEL=0.262±0.111, GEM=0.278±0.113, GEG=0.244±0.117, GEA=0,275±0.094 e GPR=0.181±0.123, p-0.07. No grupo macroesteatose índice de apoptose (TUNEL) foi: G1=0.284± 0.106, G2+3=0.160±0.109, G4=0,275±0.094, p-0.05; e no grupo microesteatose, G1=0.222±0.123, G2+3=0.293±0.108, G4=0.275±0.094, p-0.049. O GEG expressou o ICAM-1 em 83% dos casos de forma difusa. Não existiu diferença estatística entre os grupos ao analisarmos os índices de apoptose (caspase-3) e ICAM-1. Conclusão: o GEG e o grupo macroesteatose (moderado e grave) apresentaram significante redução no índice de apoptose, enquanto o grupo microesteatose (moderado e grave), significante aumento. E o GEG apresentou expressão de ICAM-1 difusamente, podendo ser estes marcadores envolvidos na lesão de I/R hepática dos enxertos esteatóticos.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In electronic commerce, systems development is based on two fundamental types of models, business models and process models. A business model is concerned with value exchanges among business partners, while a process model focuses on operational and procedural aspects of business communication. Thus, a business model defines the what in an e-commerce system, while a process model defines the how. Business process design can be facilitated and improved by a method for systematically moving from a business model to a process model. Such a method would provide support for traceability, evaluation of design alternatives, and seamless transition from analysis to realization. This work proposes a unified framework that can be used as a basis to analyze, to interpret and to understand different concepts associated at different stages in e-Commerce system development. In this thesis, we illustrate how UN/CEFACT’s recommended metamodels for business and process design can be analyzed, extended and then integrated for the final solutions based on the proposed unified framework. Also, as an application of the framework, we demonstrate how process-modeling tasks can be facilitated in e-Commerce system design. The proposed methodology, called BP3 stands for Business Process Patterns Perspective. The BP3 methodology uses a question-answer interface to capture different business requirements from the designers. It is based on pre-defined process patterns, and the final solution is generated by applying the captured business requirements by means of a set of production rules to complete the inter-process communication among these patterns.