878 resultados para Comparative risk assessment
Resumo:
There are several studies on managing risks in information technology (IT) projects. Most of the studies identify and prioritise risks through empirical research in order to suggest mitigating measures. Although they are important to clients for future projects, these studies fail to provide any framework for risk management from IT developers' perspective. Although a few studies introduced a framework of risk management in IT projects, most of them are presented from clients' perspectives and very little effort has been made to integrate this with the project management cycle. As IT developers absorb a considerable amount of risk, an integrated framework for managing risks in IT projects from developers' perspective is needed in order to ensure success in IT projects. The main objective of the paper is to develop a risk management framework for IT projects from the developers' perspective. This study uses a combined qualitative and quantitative technique with the active involvement of stakeholders in order to identify, analyse and respond to risks. The entire methodology has been explained using a case study on an information technology project in a public sector organisation in Barbados.
Resumo:
Construction projects are risky. A build-operate-transfer (BOT) project is recognised as one of the most risky project schemes. This scheme has been employed rather frequently in the past few decades, in both developed and developing countries. However, because of its risky nature, there have been failures as well as successes. Risk analysis in an appropriate way is desirable in implementing BOT projects. There are various tools and techniques applicable to risk analysis. The application of these risk analysis tools and techniques (RATTs) to BOT projects depends on an understanding of the contents and contexts of BOT projects, together with a thorough understanding of RATTs. This paper studies key points in their applications through reviews of relevant literatures and discusses the application of RATTs to BOT projects. The application to BOT projects is considered from the viewpoints of the major project participants, i.e. government, lenders and project companies. Discussion is also made with regard to political risks, which are very important in BOT projects. A flow chart has been introduced to select an appropriate tool for risk management in BOT projects. This study contributes to the establishment of a framework for systematic risk management in BOT projects.
Resumo:
Conventional project management techniques are not always sufficient to ensure time, cost and quality achievement of large-scale construction projects due to complexity in planning, design and implementation processes. The main reasons for project non-achievement are changes in scope and design, changes in government policies and regulations, unforeseen inflation, underestimation and improper estimation. Projects that are exposed to such an uncertain environment can be effectively managed with the application of risk management throughout the project's life cycle. However, the effectiveness of risk management depends on the technique through which the effects of risk factors are analysed/quantified. This study proposes the Analytic Hierarchy Process (AHP), a multiple attribute decision making technique, as a tool for risk analysis because it can handle subjective as well as objective factors in a decision model that are conflicting in nature. This provides a decision support system (DSS) to project management for making the right decision at the right time for ensuring project success in line with organisation policy, project objectives and a competitive business environment. The whole methodology is explained through a case application of a cross-country petroleum pipeline project in India and its effectiveness in project management is demonstrated.
Resumo:
Background: Research into mental-health risks has tended to focus on epidemiological approaches and to consider pieces of evidence in isolation. Less is known about the particular factors and their patterns of occurrence that influence clinicians’ risk judgements in practice. Aims: To identify the cues used by clinicians to make risk judgements and to explore how these combine within clinicians’ psychological representations of suicide, self-harm, self-neglect, and harm to others. Method: Content analysis was applied to semi-structured interviews conducted with 46 practitioners from various mental-health disciplines, using mind maps to represent the hierarchical relationships of data and concepts. Results: Strong consensus between experts meant their knowledge could be integrated into a single hierarchical structure for each risk. This revealed contrasting emphases between data and concepts underpinning risks, including: reflection and forethought for suicide; motivation for self-harm; situation and context for harm to others; and current presentation for self-neglect. Conclusions: Analysis of experts’ risk-assessment knowledge identified influential cues and their relationships to risks. It can inform development of valid risk-screening decision support systems that combine actuarial evidence with clinical expertise.
Resumo:
Strategic sourcing has increased in importance in recent years, and now plays an important role in companies’ planning. The current volatility in supply markets means companies face multiple challenges involving lock-in situations, supplier bankruptcies or supply security issues. In addition, their exposure can increase due to natural disasters, as witnessed recently in the form of bird flu, volcanic ash and tsunamis. Therefore, the primary focus of this study is risk management in the context of strategic sourcing. The study presents a literature review on sourcing based on the 15 years from 1998–2012, and considers 131 academic articles. The literature describes strategic sourcing as a strategic, holistic process in managing supplier relationships, with a long-term focus on adding value to the company and realising competitive advantage. Few studies discovered the real risk impact and status of risk management in strategic sourcing, and evaluation across countries and industries was limited, with the construction sector particularly under-researched. This methodology is founded on a qualitative study of twenty cases across Ger-many and the United Kingdom from the construction sector and electronics manufacturing industries. While considering risk management in the context of strategic sourcing, the thesis takes into account six dimensions that cover trends in strategic sourcing, theoretical and practical sourcing models, risk management, supply and demand management, critical success factors and the strategic supplier evaluation. The study contributes in several ways. First, recent trends are traced and future needs identified across the research dimensions of countries, industries and companies. Second, it evaluates critical success factors in contemporary strategic sourcing. Third, it explores the application of theoretical and practical sourcing models in terms of effectiveness and sustainability. Fourth, based on the case study findings, a risk-oriented strategic sourcing framework and a model for strategic sourcing are developed. These are based on the validation of contemporary requirements and a critical evaluation of the existing situation. It contemplates the empirical findings and leads to a structured process to manage risk in strategic sourcing. The risk-oriented framework considers areas such as trends, corporate and sourcing strategy, critical success factors, strategic supplier selection criteria, risk assessment, reporting, strategy alignment and reporting. The proposed model highlights the essential dimensions in strategic sourcing and guides us to a new definition of strategic sourcing supported by this empirical study.
Resumo:
Definitions and perceptions of the role and styles of risk management, and performance management/strategic control systems have evolved over time, but it can be argued that risk management is primarily concerned with ensuring the achievement of strategic objectives. This paper shows the extent of overlap between a broad-based view of risk management, namely Enterprise Risk Management (ERM), and the balanced scorecard, which is a widely used strategic control system. A case study of one of the UK's largest retailers, Tesco plc, is used to show how ERM can be introduced as part of an existing strategic control system. The case demonstrates that, despite some differences in lines of communications, the strategic controls and risk controls can be used to achieve a common objective. Adoption of such an integrated approach, however, has implications for the profile of risk and the overall risk culture within an organisation.
Developing a probabilistic graphical structure from a model of mental-health clinical risk expertise
Resumo:
This paper explores the process of developing a principled approach for translating a model of mental-health risk expertise into a probabilistic graphical structure. The Galatean Risk Screening Tool [1] is a psychological model for mental health risk assessment based on fuzzy sets. This paper details how the knowledge encapsulated in the psychological model was used to develop the structure of the probability graph by exploiting the semantics of the clinical expertise. These semantics are formalised by a detailed specification for an XML structure used to represent the expertise. The component parts were then mapped to equivalent probabilistic graphical structures such as Bayesian Belief Nets and Markov Random Fields to produce a composite chain graph that provides a probabilistic classification of risk expertise to complement the expert clinical judgements. © Springer-Verlag 2010.
Resumo:
In the field of mental health risk assessment, there is no standardisation between the data used in different systems. As a first step towards the possible interchange of data between assessment tools, an ontology has been constructed for a particular one, GRiST (Galatean Risk Screening Tool). We briefly introduce GRiST and its data structures, then describe the ontology and the benefits that have already been realised from the construction process. For example, the ontology has been used to check the consistency of the various trees used in the model. We then consider potential uses in integration of data from other sources. © 2009 IEEE.
Resumo:
Risk management in healthcare represents a group of various complex actions, implemented to improve the quality of healthcare services and guarantee the patients safety. Risks cannot be eliminated, but it can be controlled with different risk assessment methods derived from industrial applications and among these the Failure Mode Effect and Criticality Analysis (FMECA) is a largely used methodology. The main purpose of this work is the analysis of failure modes of the Home Care (HC) service provided by local healthcare unit of Naples (ASL NA1) to focus attention on human and non human factors according to the organization framework selected by WHO. © Springer International Publishing Switzerland 2014.
Resumo:
The aim of the case study is to express the delayed repair time impact on the revenues and profit in numbers with the example of the outage of power plant units. Main steps of risk assessment: • creating project plan suitable for risk assessment • identification of the risk factors for each project activities • scenario-analysis based evaluation of risk factors • selection of the critical risk factors based on the results of quantitative risk analysis • formulating risk response actions for the critical risks • running Monte-Carlo simulation [1] using the results of scenario-analysis • building up a macro which creates the connection among the results of the risk assessment, the production plan and the business plan.
Resumo:
The present study identified and compared Coronary Heart Disease (CHD) risk factors quantified as “CHD risk point standards” (CHDRPS) among tri-ethnic (White non-Hispanic [WNH], Hispanic [H], and Black non-Hispanic [BNH]) college students. All 300 tri-ethnic subjects completed the Cardiovascular Risk Assessment Instruments and had blood pressure readings recorded on three occasions. The Bioelectrical Impedance Analysis (BIA) was used to measure body composition. Students' knowledge of CHD risk factors was also measured. In addition, a 15 ml fasting blood sample was collected from 180 subjects and blood lipids and Homocysteine (tHcy) levels were measured. Data were analyzed by gender and ethnicity using one-way Analysis of Variance (ANOVA) with Bonferroni's pairwise mean comparison procedure, Pearson correlation, and Chi-square test with follow-up Bonferroni's Chi-square tests. ^ The mean score of CHDRPS for all subjects was 19.15 ± 6.79. Assigned to the CHD risk category, college students were below-average risk of developing CHD. Males scored significantly (p < 0.013) higher for CHD risk than females, and BNHs scored significantly (p < 0.033) higher than WNHs. High consumption of dietary fat saturated fat and cholesterol resulted in a high CHDRPS among H males and females and WNH females. High alcohol consumption resulted in a high CHDRPS among all subjects. Mean tHcy ± SD of all subjects was 6.33 ± 3. 15 μmol/L. Males had significantly (p < 0.001) higher tHcy than females. Black non-Hispanic females and H females had significantly (p < 0.003) lower tHcy than WNH females. Positive associations were found between tHcy levels and CHDRPS among females (p < 0.001), Hs (p < 0.001), H males (p < 0.049), H females (p < 0.009), and BNH females (p < 0.005). Significant positive correlations were found between BMI levels and CHDRPS in males (p < 0.001), females (p < 0.001), WNHs (p < 0.008), Hs (p < 0.001), WNH males (p < 0.024), H males (p < 0.004) and H females (p < 0.001). The mean knowledge of CHD questions of all subjects was 71.70 ± 7.92 out of 100. The mean knowledge of CHD was significantly higher for WNH males (p < 0.039) than BNH males. A significant inverse correlation (r = 0.392, p < 0.032) was found between the CHD knowledge and CHDRPS in WNH females. The researcher's findings indicate strong gender and ethnic differences in CHD risk factors among the college-age population. ^
Resumo:
A major consequence of contamination at the local level’s population as it relates to environmental health and environmental engineering is childhood lead poisoning. Environmental contamination is one of the pressing environmental concerns facing the world today. Current approaches often focus on large contaminated industrial size sites that are designated by regulatory agencies for site remediation. Prior to this study, there were no known published studies conducted at the local and smaller scale, such as neighborhoods, where often much of the contamination is present to remediate. An environmental health study of local lead-poisoning data in Liberty City, Little Haiti and eastern Little Havana in Miami-Dade County, Florida accounted for a disproportionately high number of the county’s reported childhood lead poisoning cases. An engineering system was developed and designed for a comprehensive risk management methodology that is distinctively applicable to the geographical and environmental conditions of Miami-Dade County, Florida. Furthermore, a scientific approach for interpreting environmental health concerns, while involving detailed environmental engineering control measures and methods for site remediation in contained media was developed for implementation. Test samples were obtained from residents and sites in those specific communities in Miami-Dade County, Florida (Gasana and Chamorro 2002). Currently lead does not have an Oral Assessment, Inhalation Assessment, and Oral Slope Factor; variables that are required to run a quantitative risk assessment. However, various institutional controls from federal agencies’ standards and regulation for contaminated lead in media yield adequate maximum concentration limits (MCLs). For this study an MCL of .0015 (mg/L) was used. A risk management approach concerning contaminated media involving lead demonstrates that the linkage of environmental health and environmental engineering can yield a feasible solution.
Resumo:
Subtitle D of the Resource Conservation and Recovery Act (RCRA) requires a post closure period of 30 years for non hazardous wastes in landfills. Post closure care (PCC) activities under Subtitle D include leachate collection and treatment, groundwater monitoring, inspection and maintenance of the final cover, and monitoring to ensure that landfill gas does not migrate off site or into on site buildings. The decision to reduce PCC duration requires exploration of a performance based methodology to Florida landfills. PCC should be based on whether the landfill is a threat to human health or the environment. Historically no risk based procedure has been available to establish an early end to PCC. Landfill stability depends on a number of factors that include variables that relate to operations both before and after the closure of a landfill cell. Therefore, PCC decisions should be based on location specific factors, operational factors, design factors, post closure performance, end use, and risk analysis. The question of appropriate PCC period for Florida’s landfills requires in depth case studies focusing on the analysis of the performance data from closed landfills in Florida. Based on data availability, Davie Landfill was identified as case study site for a case by case analysis of landfill stability. The performance based PCC decision system developed by Geosyntec Consultants was used for the assessment of site conditions to project PCC needs. The available data for leachate and gas quantity and quality, ground water quality, and cap conditions were evaluated. The quality and quantity data for leachate and gas were analyzed to project the levels of pollutants in leachate and groundwater in reference to maximum contaminant level (MCL). In addition, the projected amount of gas quantity was estimated. A set of contaminants (including metals and organics) were identified as contaminants detected in groundwater for health risk assessment. These contaminants were selected based on their detection frequency and levels in leachate and ground water; and their historical and projected trends. During the evaluations a range of discrepancies and problems that related to the collection and documentation were encountered and possible solutions made. Based on the results of PCC performance integrated with risk assessment, projection of future PCC monitoring needs and sustainable waste management options were identified. According to these results, landfill gas monitoring can be terminated, leachate and groundwater monitoring for parameters above MCL and surveying of the cap integrity should be continued. The parameters which cause longer monitoring periods can be eliminated for the future sustainable landfills. As a conclusion, 30 year PCC period can be reduced for some of the landfill components based on their potential impacts to human health and environment (HH&E).
Resumo:
Subtitle D of the Resource Conservation and Recovery Act (RCRA) requires a post closure period of 30 years for non hazardous wastes in landfills. Post closure care (PCC) activities under Subtitle D include leachate collection and treatment, groundwater monitoring, inspection and maintenance of the final cover, and monitoring to ensure that landfill gas does not migrate off site or into on site buildings. The decision to reduce PCC duration requires exploration of a performance based methodology to Florida landfills. PCC should be based on whether the landfill is a threat to human health or the environment. Historically no risk based procedure has been available to establish an early end to PCC. Landfill stability depends on a number of factors that include variables that relate to operations both before and after the closure of a landfill cell. Therefore, PCC decisions should be based on location specific factors, operational factors, design factors, post closure performance, end use, and risk analysis. The question of appropriate PCC period for Florida’s landfills requires in depth case studies focusing on the analysis of the performance data from closed landfills in Florida. Based on data availability, Davie Landfill was identified as case study site for a case by case analysis of landfill stability. The performance based PCC decision system developed by Geosyntec Consultants was used for the assessment of site conditions to project PCC needs. The available data for leachate and gas quantity and quality, ground water quality, and cap conditions were evaluated. The quality and quantity data for leachate and gas were analyzed to project the levels of pollutants in leachate and groundwater in reference to maximum contaminant level (MCL). In addition, the projected amount of gas quantity was estimated. A set of contaminants (including metals and organics) were identified as contaminants detected in groundwater for health risk assessment. These contaminants were selected based on their detection frequency and levels in leachate and ground water; and their historical and projected trends. During the evaluations a range of discrepancies and problems that related to the collection and documentation were encountered and possible solutions made. Based on the results of PCC performance integrated with risk assessment, projection of future PCC monitoring needs and sustainable waste management options were identified. According to these results, landfill gas monitoring can be terminated, leachate and groundwater monitoring for parameters above MCL and surveying of the cap integrity should be continued. The parameters which cause longer monitoring periods can be eliminated for the future sustainable landfills. As a conclusion, 30 year PCC period can be reduced for some of the landfill components based on their potential impacts to human health and environment (HH&E).
Resumo:
Family health history (FHH) in the context of risk assessment has been shown to positively impact risk perception and behavior change. The added value of genetic risk testing is less certain. The aim of this study was to determine the impact of Type 2 Diabetes (T2D) FHH and genetic risk counseling on behavior and its cognitive precursors. Subjects were non-diabetic patients randomized to counseling that included FHH +/- T2D genetic testing. Measurements included weight, BMI, fasting glucose at baseline and 12 months and behavioral and cognitive precursor (T2D risk perception and control over disease development) surveys at baseline, 3, and 12 months. 391 subjects enrolled of which 312 completed the study. Behavioral and clinical outcomes did not differ across FHH or genetic risk but cognitive precursors did. Higher FHH risk was associated with a stronger perceived T2D risk (pKendall < 0.001) and with a perception of "serious" risk (pKendall < 0.001). Genetic risk did not influence risk perception, but was correlated with an increase in perception of "serious" risk for moderate (pKendall = 0.04) and average FHH risk subjects (pKendall = 0.01), though not for the high FHH risk group. Perceived control over T2D risk was high and not affected by FHH or genetic risk. FHH appears to have a strong impact on cognitive precursors of behavior change, suggesting it could be leveraged to enhance risk counseling, particularly when lifestyle change is desirable. Genetic risk was able to alter perceptions about the seriousness of T2D risk in those with moderate and average FHH risk, suggesting that FHH could be used to selectively identify individuals who may benefit from genetic risk testing.