948 resultados para Cantilever bridges Testing
Resumo:
Many state, county, and local agencies are faced with deteriorating bridge infrastructure composed of a large percentage of relatively short to medium span bridges. In many cases, these older structures are rolled or welded longitudinal steel stringers acting compositely with a reinforced concrete deck. Most of these bridges, although still in service, need some level of strengthening due to increases in legal live loads or loss of capacity due to deterioration. Although these bridges are overstressed in most instances, they do not warrant replacement; thus, structurally efficient but cost-effective means of strengthening needs to be employed. In the past, the use of bolted steel cover plates or angles was a common retrofit option for strengthening such bridges. However, the time and labor involved to attach such a strengthening system can sometimes be prohibitive. This project was funded through the Federal Highway Administration’s Innovative Bridge Research and Construction program. The goal is to retrofit an existing structurally deficient, three-span continuous steel stringer bridge using an innovative technique that involves the application of post-tensioning forces; the post-tensioning forces were applied using fiber reinforced polymer post-tensioning bars. When compared to other strengthening methods, the use of carbon fiber reinforced polymer composite materials is very appealing in that they are highly resistant to corrosion, have a low weight, and have a high tensile strength. Before the post-tensioning system was installed, a diagnostic load test was conducted on the subject bridge to establish a baseline behavior of the unstrengthened bridge. During the process of installing the post-tensioning hardware and stressing the system, both the bridge and the post-tensioning system were monitored. The installation of the hardware was followed by a follow-up diagnostic load test to assess the effectiveness of the post-tensioning strengthening system. Additional load tests were performed over a period of two years to identify any changes in the strengthening system with time. Laboratory testing of several typical carbon fiber reinforced polymer bar specimens was also conducted to more thoroughly understand their behavior. This report documents the design, installation, and field testing of the strengthening system and bridge.
Resumo:
This report contains an estimate of the cost of highway resurfacing necessitated by damage from studded tires. The total is $95,620,000 for the twenty-five years from 1971 to 1996. This total includes $51,937,000 to resurface pavements and bridges on Interstate routes and $43,683,000 for other Primary highways. The estimate for Interstate routes includes those sections now open to traffic and those planned for completion by November 1974. The estimate for other Primary routes includes rural and municipal sections open to traffic as of November 1970. The estimate was prepared by computing the cost of expected pavement and bridge resurfacing costs for the twenty-five year period assuming continued use of studded tires, then subtracting from this the expected resurfacing ) cost for the same period assuming that the use of' studded tires is prohibited. The total figure, $95,620,000, should be regarded as a conservative estimate of the cost which may be avoided by prohibiting the use of studded tires in Iowa. The conservative nature of the estimate may be demonstrated by the following examples of the guidelines used iri its preparation. 1. Only mainline pavements were included in the cost estimate for the Interstate routes. The connecting loops, exit ramps and entrance ramps at Interstate interchanges contain many additional miles of pavement subject to wear by studded tires. This pavement was omitted from the estimate because reliable ' information about the rate of pavement wear at such locations is not available. As a result, the Interstate resurfacing costs are underestimated. 2. Several other costs were also omitted from the estimate because of a lack of sufficient information. These include the cost of repairing damage caused by studded tires to city streets other than those designated as Primary routes, the damage to pavements and bridges on the more-heavily travelled Secondary roads, and the damage to pavement traffic markings on all highway systems. Experience indicates that portland cement concrete pavements in Iowa have a normal service life of twenty-five years before resurfacing becomes necessary. The service life for asphalt pavements is thirteen years. In making this cost estimate, the need for resurfacing was attributed to wear from studded tires only when the normal service life of the pavement was shortened by that wear. Consequently, this cost estimate does not account for the reduced safety and convenience to Iowa motorists during the time when pavement wear caused by studded tires is significant but less than the critical amount.
Resumo:
Joint Publications from Iowa Engineering Experiment Station - Bulletin No. 188 and Iowa Highway Research Board - Bulletin No. 17. In the design of highway bridges, the 'static live load is multiplied by a factor to compensate for the dynamic effect of moving vehicles. This factor, commonly referred to as an impact factor, is intended to provide for the dynamic response of the bridge to moving loads and suddenly applied forces. Many investigators have published research which contradicts the current impact formula 1,4,17. Some investigators feel that the problem of impact deals not only with the increase in over-all static live load but that it is an integral part of a dynamic load distribution problem. The current expanded highway program with the large number of bridge structures required emphasizes the need for investigating some of the dynamic behavior problems which have been generally ignored by highway engineers. These problems generally result from the inability of a designer to predict the dynamic response of a bridge structure. Many different investigations have been made of particular portions of the overall dynamic problem. The results of these varied investigations are inevitably followed by a number of unanswered questions. Ironically, many of the unanswered questions are those which are of immediate concern in the design of highway bridges, and this emphasizes the need for additional research on the problem of impact.
Resumo:
This report addresses the field testing and analysis of those results to establish the behavior of the original Clive Road Bridge that carried highway traffic over Interstate 80 (I-80) in the northwest region of Des Moines, Iowa. The bridge was load tested in 1959, shortly after its construction and in 1993, just prior to its demolition. This report presents some of the results from both field tests, finite element predictions of the behavior of aluminum bridge girders, and load distribution studies.
Resumo:
We examine the power of different exact tests of differentiation for diploid populations. Since there is not necessarily random mating within populations, the appropriate hypothesis to construct exact tests is that of independent sampling of genotypes. There are two categories of tests, FST-estimator tests and goodness of fit tests. In this latter category, we distinguish "allelic statistics", which account for the nature of alleles within genotypes, from "genotypic statistics" that do not. We show that the power of FST-estimator tests and of allelic goodness of fit tests are similar when sampling is balanced, and higher than the power of genotypic goodness of fit tests. When sampling is unbalanced, the most powerful tests are shown to belong to the allelic goodness of fit group.
Resumo:
Wiss, Janney, Elstner Associates, Inc. (WJE) evaluated potential nondestructive evaluation (NDE) methodologies that may be effective in 1) identifying internal defects within slip formed concrete barriers and 2) assessing the corrosion condition of barrier dowel bars. The evaluation was requested by the Bridge Maintenance and Inspection Unit of the Iowa Department of Transportation (IaDOT) and the Bureau of Bridges and Structures of the Illinois Department of Transportation (IDOT). The need arose due to instances in each Department’s existing inventory of bridge barriers where internal voids and other defects associated with slip forming construction methods were attributed to poor barrier performance after completion of construction and where, in other barrier walls, unintentional exposure of the dowel bars revealed extensive corrosion-related section loss at previously uninspectable locations, reducing the capacity of the barriers to resist traffic impact loads. WJE trial tested potential NDE techniques on laboratory mock-up samples built with known defects, trial sections of cast-in-place barriers at in-service bridges in Iowa, and slip formed and cast-in-place barrier walls at in-service bridges in Illinois. The work included review of available studies performed by others, field trial testing to assess candidate test methods, verification of the test methods in identifying internal anomalies and dowel bar corrosion, and preparation of this report and nondestructive evaluation guidelines.
Resumo:
The Iowa Department of Transportation used a high molecular weight methacrylate (HMWM) resin to seal a 3,340 ft. x 64 ft. bridge deck in October 1986. The sealing was necessary to prevent deicing salt brine from entering a substantial number of transverse cracks that coincided with the epoxy coated top steel and unprotected bottom steel. HMWM resin is a three component product composed of a monomer, a curnene hydroperoxide initiator and a cobalt naphthenate promoter. The HMWM was applied with a dual spray bar system and flat-fan nozzles. Initiated monomer delivered through one spray bar was mixed in the air with promoted monomer from the other spray bar. The application rate averaged 0.956 gallons per 100 square feet for the tined textured driving lanes. Dry sand was broadcast on the surface at an average coverage of 0.58 lbs. per square yard to maintain friction. Coring showed that the H.MWM resin penetrated the cracks more than two inches deep. Testing of the treated deck yielded Friction Numbers averaging 33 with a treaded tire compared to 36 prior to treatment. An inspection soon after treatment found five leaky cracks in one of the 15 spans. One inspection during a steady rain showed no leakage, but leakage from numerous cracks occurred during a subsequent rain. A second HMWM application was made on two spans to determine if a double application would prevent leakage. This evaluation has not been completed.
Resumo:
Use of bridge deck overlays is important in maximizing bridge service life. Overlays can replace the deteriorated part of the deck, thus extending the bridge life. Even though overlay construction avoids the construction of a whole new bridge deck, construction still takes significant time in re-opening the bridge to traffic. Current processes and practices are time-consuming and multiple opportunities may exist to reduce overall construction time by modifying construction requirements and/or materials utilized. Reducing the construction time could have an effect on reducing the socioeconomic costs associated with bridge deck rehabilitation and the inconvenience caused to travelers. This work included three major tasks with literature review, field investigation, and laboratory testing. Overlay concrete mix used for present construction takes long curing hours and therefore an investigation was carried out to find fast-curing concrete mixes that could reduce construction time. Several fast-cuing concrete mixes were found and suggested for further evaluation. An on-going overlay construction project was observed and documented. Through these observations, several opportunities were suggested where small modifications in the process could lead to significant time savings. With current standards of the removal depth of substrate concrete in Iowa, it takes long hours for the removal process. Four different laboratory tests were performed with different loading conditions to determine the necessary substrate concrete removal depth for a proper bond between the substrate concrete and the new overlay concrete. Several parameters, such as failure load, bond stress, and stiffness, were compared for four different concrete removal depths. Through the results and observations of this investigation several conclusions were made which could reduce bridge deck overlay construction time.
Resumo:
The primary objective of this project is to develop a design manual that would aid the county or municipal engineer in making structurally sound bridge strengthening or replacement decisions. The contents of this progress report are related only to Phase I of the study and deal primarily with defining the extent of the bridge problem in Iowa. In addition, the types of bridges to which the manual should be directed have been defined.
Resumo:
As a result of the construction of the Saylorville Dam and Reservoir on the Des Moines River, six highway bridges crossing the river were scheduled for removal. Two of these were incorporated into a comprehensive test program to study the behavior of old pin-connected high-truss single-lane bridges. The test program consisted of ultimate load tests, service load tests and a supplementary test program. The results reported in this report cover the service load tests on the two bridges as well as the supplementary tests, both static and fatigue, of eyebar members removed from the two bridges. The field test results of the service loading are compared with theoretical results of the truss analysis.
Resumo:
Individuals who are unaware of their HIV infection constitute a fragile and a critical population both from a personal and from a community-based point of view: if the infection is diagnosed too late, the outcome can be complicated by AIDS-defining diseases, whose prognosis may remain unfavourable even after the initiation of a potent antiretroviral therapy. These patients contribute to the virus spreading into the community, owing to a high viral load. It is now necessary to recognise the limits of a risk behaviour and disease-driven HIV screening policy. Since 2006, the American guidelines recommend a routine HIV testing for all patients age 13 to 64 years unless they specifically refuse the test (opt-out). In Switzerland, the recommendations remain so far risk-centred.
Resumo:
In 1957, the Iowa State Highway Commission, with financial assistance from the aluminum industry, constructed a 220-ft (67-m) long, four-span continuous, aluminum girder bridge to carry traffic on Clive Road (86th Street) over Interstate 80 near Des Moines, Iowa. The bridge had four, welded I-shape girders that were fabricated in pairs with welded diaphragms between an exterior and an interior girder. The interior diaphragms between the girder pairs were bolted to girder brackets. A composite, reinforced concrete deck served as the roadway surface. The bridge, which had performed successfully for about 35 years of service, was removed in the fall of 1993 to make way for an interchange at the same location. Prior to the bridge demolition, load tests were conducted to monitor girder and diaphragm bending strains and deflections in the northern end span. Fatigue testing of the aluminum girders that were removed from the end spans were conducted by applying constant-amplitude, cyclic loads. These tests established the fatigue strength of an existing, welded, flange-splice detail and added, welded, flange-cover plates and horizontal web plate attachment details. This part, Part 2, of the final report focuses on the fatigue tests of the aluminum girder sections that were removed from the bridge and on the analysis of the experimental data to establish the fatigue strength of full-size specimens. Seventeen fatigue fractures that were classified as Category E weld details developed in the seven girder test specimens. Linear regression analyses of the fatigue test results established both nominal and experimental stress-range versus load cycle relationships (SN curves) for the fatigue strength of fillet-welded connections. The nominal strength SN curve obtained by this research essentially matched the SN curve for Category E aluminum weldments given in the AASHTO LRFD specifications. All of the Category E fatigue fractures that developed in the girder test specimens satisfied the allowable SN relationship specified by the fatigue provisions of the Aluminum Association. The lower-bound strength line that was set at two standard deviations below the least squares regression line through the fatigue fracture data points related well with the Aluminum Association SN curve. The results from the experimental tests of this research have provided additional information regarding behavioral characteristics of full-size, aluminum members and have confirmed that aluminum has the strength properties needed for highway bridge girders.
Resumo:
BACKGROUND: Gastric banding (GB) is one of the most popular bariatric procedures for morbid obesity. Apart from causing weight loss by alimentary restriction, it can interfere with functions of the esophagus and upper stomach. The aim of this study was to evaluate if the results of extensive preoperative upper GI testing were correlated with long-term outcome and complications after GB. METHODS: Using a prospectively maintained computerized database including all the patients undergoing bariatric operations in both our hospitals, we performed a retrospective analysis of the patients who underwent complete upper gastrointestinal (GI) testing (endoscopy, pH monitoring, and manometry) before GB. RESULTS: One hundred thirty-four patients underwent complete testing before GB. Abnormal pH monitoring (increased total reflux time, increased diurnal reflux time, increased number of reflux episodes) predicted the development of complications and especially pouch dilatation and food intolerance. The mean De Meester score was higher among patients who developed complications than in the remaining ones (25.4 vs 17.7, P=0.03). High lower esophageal sphincter pressure also predicted progressive long-term food intolerance. Endoscopic findings were not predictive of the long-term outcome. CONCLUSIONS: There is some association between the function of the upper digestive tract and long-term complications after gastric banding. Abnormal pH monitoring predicts overall long-term complications, especially food intolerance with or without reflux, and pouch dilatation, and a high lower esophageal sphincter pressure predicts long-term food intolerance. Extended upper gastrointestinal testing with endoscopy, 24-h pH monitoring, and esophageal manometry is probably worthwhile in selecting patients for gastric banding.
Resumo:
The objective of this work was to obtain organic compounds similar to the ones found in the organic matter of anthropogenic dark earth of Amazonia (ADE) using a chemical functionalization procedure on activated charcoal, as well as to determine their ecotoxicity. Based on the study of the organic matter from ADE, an organic model was proposed and an attempt to reproduce it was described. Activated charcoal was oxidized with the use of sodium hypochlorite at different concentrations. Nuclear magnetic resonance was performed to verify if the spectra of the obtained products were similar to the ones of humic acids from ADE. The similarity between spectra indicated that the obtained products were polycondensed aromatic structures with carboxyl groups: a soil amendment that can contribute to soil fertility and to its sustainable use. An ecotoxicological test with Daphnia similis was performed on the more soluble fraction (fulvic acids) of the produced soil amendment. Aryl chloride was formed during the synthesis of the organic compounds from activated charcoal functionalization and partially removed through a purification process. However, it is probable that some aryl chloride remained in the final product, since the ecotoxicological test indicated that the chemical functionalized soil amendment is moderately toxic.