560 resultados para pedestrian
Resumo:
This route planner, funded by the Palm Beach Metropolitan Planning Organization (MPO), is a joint effort by Florida International University GIS Center and University of Florida Geomatics Program at Fort Lauderdale Research and Education Center. It is designed as a planning tool for bicyclists. Assistance was received from the Palm Beach County Bicycle, Greenways, Pedestrian Advisory Committee.
Resumo:
This route planner, funded by the Miami-Dade Metropolitan Planning Organization(MPO), is a joint effort by Florida International University GIS Center and University of Florida Geomatics Program at Fort Lauderdale Research and Education Center. It is designed as a planning tool for bicyclists. Assistance was received from the Miami-Dade County Bicycle/Pedestrian Advisory Committee and various cyclists and transportation professionals.
Resumo:
This route planner, funded by the Broward Metropolitan Planning Organization (MPO), is a joint effort by Florida International University GIS Center and University of Florida Geomatics Program at Fort Lauderdale Research and Education Center. It is designed as a planning tool for bicyclists. Assistance was received from the Broward County Bicycle/Pedestrian Advisory Committee and various cyclists and transportation professionals.
Resumo:
Demands for mechanisms to pay for adaptation to climate risks have multiplied rapidly as concern has shifted from greenhouse gas mitigation alone to also coping with the now-inevitable impacts. A number of viable approaches to how to pay for those adjustments to roads, drainage systems, lifeline utilities and other basic infrastructure are emerging, though untested at the scale required across the nation, which already has a trillion-dollar deferred maintenance and replacement problem. There are growing efforts to find new ways to harness private financial resources via new market arrangements to meet needs that clearly outstrip public resources alone, as well as to utilize and combine public resources more effectively. To date, mechanisms are often seen through a specific lens of scale, time, and method, for example national versus local and public versus market-based means. The purpose here is to integrate a number of those perspectives and also to highlight the following in particular. Current experience with seemingly more pedestrian needs like stormwater management funding is in fact a learning step towards new approaches for broader adaptation needs, using re-purposed but existing fiscal tools. The resources raised from new large-scale market approaches for using catastrophe- and resiliency-bond-derived funds will have their use embodied and operationalized in many separate local and state projects. The invention and packaging of innovative projects—the pre-development phase—will be pivotal to better using fiscal resources of many types. Those efforts can be greatly aided or hindered by larger national and especially state government policy, regulatory and capital market arrangements. Understanding the path to integration of effort across these scales deserves much more attention. Examples are given of how federal, state and local roles are each dimensions of that frontier, how existing tools can apply in new ways and how smart project creation plays a role.
Resumo:
Purpose: An increase in the number of pedelecs on Swedish roads is according to studies soon reality. This creates a need to adapt the bmp-grid (bike-, moped- and pedestrian-grid) to pedelecs for them to experience good security, accessibility and comfort while using it. The guidelines Swedish municipalities follow are VGU(Design of Roads and Streets) and the GCM-manual(Bike-, moped-, and pedestrian-manual) which currently do not take society’s future increase of pedelecs into account. VGU and the GCM-manual are tools that are commonly used during planning and design of roads and streets. The aim of the thesis is to use current advice and recommendations on how to adapt the bmp-grid to the pedelec and with this complete current guidelines for bmp-infrastructure. Method: The document-analysis is made on current federal documents that have an impact on bmp-design. Scetch-suggestions were then developed from the author’s personal improvement suggestions and from advice and recommendations gathered during the document-analysis and the theoretical framework. Findings: It was discovered that if the bmp-grid’s design allow bikes traveling up to 30km/h and has a good standard for bicycles according to VGU, then the infrastructure generally fulfil the needs of the pedelec. Altough there are still areas in VGU that needs complements. This need to be done on the design-guidelines so they can aid the adaption of the infrastructure to the pedelec during the planning- and design process. Necessary steps according to the result is to give clearer notifications on bmp-design, issue guidelines for choosing DTS, motivate minimal widths on roads, categories bikers and pedestrians into separate groups, give out more detailed descriptions of when separation of bikers and pedestrians should be done and also to specify different types of bike-users. When taking needs and claim of the pedelec into consideration the result shows that: adaption of the whole bmp-grid to the pedelec is not possible, to simplify priorities the bmp-grid needs to be divided into different sections, space should be taken from the car-traffic, solutions with mixed-traffic and bike-fields for pedelecs can be used in low-speed areas, larger opportunities to connect towns to increase commuting with bicycles appeared with the pedelec. Implications: After examining current guidelines regarding the design of the bmp-grid and gathering opinions on this from interviews the conclusion is that several areas in VGU needs completion. The following are recommendations on how to take the pedelec into consideration during the design-process:• Connect towns and urban-areas with bmp-grids to make use of pedelecs capacity.• Where there is not enough space for both cars and separated pedelec- and bike lanes the speed for car-traffic can be lowered to 30km/h. This creates opportunities with mixed-traffic or bike-lanes.• The width of existing roads and streets are often greater than what’s described in VGU. They can be made smaller to free space on roads for bicycle-infrastructure.• To prioritize which parts of the bmp-grid that needs design to allow pedelecs the bmp-grid can be divided into main- and local grid. The main grid should be design with consideration to the needs and claim of the pedelecs. Limitations: The limitation of the study lies in that none of the interviews where done with employees in any of the bigger municipalities in Sweden. This gives the study a general application in small- to middle-sized cities but not in bigger cities.Keywords: elcykel, ebike, pedelec, utformning, cykel, infrastruktur, infrastructure, society, planering, utformning, säkerhet, fordonstyp