986 resultados para beam-foil technique


Relevância:

20.00% 20.00%

Publicador:

Resumo:

BACKGROUND: The preservation of globe integrity has always been a major concern during the treatment of retinoblastoma for fear of extraocular or metastatic spread. Intravitreal chemotherapy has been attempted as a desperate salvage therapy only for eyes with refractory retinoblastoma. Published data on the safety and efficacy of this route are, however, limited. METHODS: A modified technique of intravitreal injection in eyes with retinoblastoma is described. All children with retinoblastoma who received one or more intravitreal injections using this technique were retrospectively reviewed concerning ocular complications of the injection procedure as well as clinical or histopathological evidence of tumour spread. RESULTS: 30 eyes of 30 children with retinoblastoma received a total of 135 intravitreal injections, with a median follw-up duration of 13.5 months. No extraocular spread was seen on clinical follow-up in any patients and there was no tumour contamination of the retrieved entry sites histopathologically analysed among the five enucleated eyes. No significant ocular side effects were observed except transient localised vitreous haemorrhage (3/135). CONCLUSION: This technique is potentially safe and effective at a low cost and may play a promising role, especially in the treatment of recurrent and/or resistant vitreous disease in retinoblastoma, as an alternative to enucleation and/or external beam radiotherapy. However, this treatment should not replace the primary standard of care of retinoblastoma and should not be considered in group E eyes. Its application should be approved by an ophthalmological-oncological team and it should be performed by an experienced eye surgeon in a tertiary referral centre after careful selection of a tumour-free injection site.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

AIM: To report the results of whole anterior segment proton beam radiotherapy (PBR) for diffuse iris melanoma. METHODS: Between 2000 and 2011, 12 patients with iris melanoma received PBR to the entire iris and ciliary body. RESULTS: Patients had a mean age of 57 years and a median follow-up of 3.5 years (range 1-11.6 years). Tumour iris involvement was 1-4 h in five patients, 5-8 h in four and 9-12 h in three. Angle involvement was 6-8 h in five patients and 9-12 h in seven. The visual acuity (VA) before treatment was 6/5-6/6 in six patients, 6/8-6/9 in three and 6/18-6/38 in three. No tumour recurrence occurred during the follow-up period. Glaucoma treatment was required in 11 of 12 patients. The visual acuity at the last follow-up was 6/5-6/9 in five patients, 6/18-6/24 in three, 6/60-1/60 in two and no light perception in two. Four patients developed varying non-severe degrees of limbal stem cell deficiency, which was treatable with conservative measures. CONCLUSIONS: Whole anterior segment PBR is a useful alternative to enucleation for diffuse iris melanoma. Most patients will need treatment for glaucoma and some may require treatment for tear-film instability and/or stem cell failure.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

OBJECTIVES: A straightforward original Chimney Graft (CG) protocol has been developed at our institution in selected cases of juxtarenal aortic aneurysm (JRAA). The aim of this study was to present our clinical experience of consecutive series with use of uncovered self-expanding stent (SES) as "Open Chimney" (OCh) in the endovascular repair (EVAR) of JRAA. METHODS: A standard endograft with suprarenal fixation struts is delivered with its proximal covered edge just below the highest RA in JRAA presenting the ostium of the two renal arteries at a different aortic level and the distance between the highest renal artery and the beginning of the aneurysm (improved landing zone) ≥10 mm. The low-lying renal artery is maintained patent by the OCh graft (standard SES) delivered from left brachial access (6 Fr). All clinical, anatomical, and operative data were prospectively collected and retrieved for the study analysis. RESULTS: From July 2010 to November 2012, OCh EVAR was offered to 22 consecutive patients considered unfit for JRAA open repair. All procedures were technically successful with aneurysm exclusion and patent OCh graft. One small perioperative type Ia endoleak spontaneously disappeared at the 3-month CT control. One patient died because of acute decompensated heart failure. One patient presented a left hemispheric stroke. The median follow-up of 18 months (range 7-35) showed aneurysm exclusion in all patients without type I and III endoleaks, SES stenosis, and/or renal impairment. CONCLUSIONS: OCh-EVAR is a straightforward technique that can be employed in selected cases of JRAA, avoiding the more complex and expensive fenestrated EVAR.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The success of anatomic repair of Bankart lesion diminishes in the presence of a capsule stretching and/or attenuation is reported in a variable percentage of patients with a chronic gleno-humeral instability. We introduce a new arthroscopic stitch, the MIBA stitch, designed with a twofold aim: to improve tissue grip to reduce the risk of soft tissue tear, particularly cutting through capsular-labral tissue, to and address capsule-labral detachment and capsular attenuation using a double loaded suture anchor. This stitch is a combination of horizontal mattress stitch passing through the capsular-labral complex in a "south-to-north" direction and an overlapping single vertical suture passing through the capsule and labrum in a "east-to-west" direction. The mattress stitch is tied before the vertical stitch in order to reinforce the simple vertical stitch, improving grip and contact force between capsular-labral tissue and glenoid bone.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Recent reports have indicated that 23.5% of the nation's highway bridges are structurally deficient and 17.7% are functionally obsolete. A significant number of these bridges are on the Iowa secondary road system where over 86% of the rural bridge management responsibilities are assigned to the counties. Some of the bridges can be strengthened or otherwise rehabilitated, but many more are in need of immediate replacement. In a recent investigation (HR-365 "Evaluation of Bridge Replacement Alternatives for the County Bridge System") several types of replacement bridges that are currently being used on low volume roads were identified. It was also determined that a large number of counties (69%) have the ability and are interested in utilizing their own forces to design and construct short span bridges. In reviewing the results from HR-365, the research team developed one "new" bridge replacement concept and a modification of a replacement system currently being used. Both of these bridge replacement alternatives were investigated in this study, the results of which are presented in two volumes. This volume (Volume 1) presents the results of Concept 1 - Steel Beam Precast Units. Concept 2 - Modification of the Beam-in-Slab Bridge is presented in Volume 2. Concept 1, involves the fabrication of precast units (two steel beams connected by a concrete slab) by county work forces. Deck thickness is limited so that the units can be fabricated at one site and then transported to the bridge site where they are connected and the remaining portion of the deck placed. Since Concept 1 bridge is primarily intended for use on low-volume roads, the precast units can be constructed with new or used beams. In the experimental part of the investigation, there were three types of static load tests: small scale connector tests, "handling strength" tests, and service and overload tests of a model bridge. Three finite element models for analyzing the bridge in various states of construction were also developed. Small scale connector tests were completed to determine the best method of connecting the precast double-T (PCDT) units. "Handling strength" tests on an individual PCDT unit were performed to determine the strength and behavior of the precast unit in this configuration. The majority of the testing was completed on the model bridge [L=9,750 mm (32 ft), W=6,400 mm (21 ft)] which was fabricated using the precast units developed. Some of the variables investigated in the model bridge tests were number of connectors required to connect adjacent precast units, contribution of diaphragms to load distribution, influence of position of diaphragms on bridge strength and load distribution, and effect of cast-in-place portion of deck on load distribution. In addition to the service load tests, the bridge was also subjected to overload conditions. Using the finite element models developed, one can predict the behavior and strength of bridges similar to the laboratory model as well as design them. Concept 1 has successfully passed all laboratory testing; the next step is to field test it.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This project continues the research which addresses the numerous bridge problems on the Iowa secondary road system. It is a continuation (Phase 2) of Project HR-382, in which two replacement alternatives (Concept 1: Steel Beam Precast Units and Concept 2: Modification of the Benton County Beam-in-Slab Bridge) were investigated. In previous research for concept 1, a precast unit bridge was developed through laboratory testing. The steel-beam precast unit bridge requires the fabrication of precast double-tee (PCDT) units, each consisting of two steel beams connected by a reinforced concrete deck. The weight of each PCDT unit is minimized by limiting the deck thickness to 4 in., which permits the units to be constructed off-site and then transported to the bridge site. The number of units required is a function of the width of bridge desired. Once the PCDT units are connected, a cast-in-place reinforced concrete deck is cast over the PCDT units and the bridge railing attached. Since the steel beam PCDT unit bridge design is intended primarily for use on low-volume roads, used steel beams can be utilized for a significant cost savings. In previous research for concept 2, an alternate shear connector (ASC) was developed and subjected to static loading. In this investigation, the ASC was subjected to cyclic loading in both pushout specimens and composite beam tests. Based on these tests, the fatigue strength of the ASC was determined to be significantly greater than that required in typical low volume road single span bridges. Based upon the construction and service load testing, the steel-beam precast unit bridge was successfully shown to be a viable low volume road bridge alternative. The construction process utilized standard methods resulting in a simple system that can be completed with a limited staff. Results from the service load tests indicated adequate strength for all legal loads. An inspection of the bridge one year after its construction revealed no change in the bridge's performance. Each of the systems previously described are relatively easy to construct. Use of the ASC rather than the welded studs significantly simplified the work, equipment, and materials required to develop composite action between the steel beams and the concrete deck.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The need to upgrade a large number of understrength and obsolete bridges in the U.S. has been well documented in the literature. Through several Iowa DOT projects, the concept of strengthening simple-span bridges by post-tensioning has been developed. The purpose of the project described in this report was to investigate the use of post-tensioning for strengthening continuous composite bridges. In a previous, successfully completed investigation, the feasibility of strengthening continuous, composite bridges by post-tensioning was demonstrated on a laboratory 1/3-scale-model bridge (3 spans: 41 ft 11 in. x 8 ft 8 in.). This project can thus be considered the implementation phase. The bridge selected for strengthening was in Pocahontas County near Fonda, Iowa, on County Road N28. With finite element analysis, a post-tensioning system was developed that required post-tensioning of the positive moment regions of both the interior and exterior beams. During the summer of 1988, the strengthening system was installed along with instrumentation to determine the bridge's response and behavior. Before and after post-tensioning, the bridge was subjected to truck loading (1 or 2 trucks at various predetermined critical locations) to determine the effectiveness of the strengthening system. The bridge, with the strengthening system in place, was inspected approximately every three months to determine any changes in its appearance or behavior. In 1989, approximately one year after the initial strengthening, the bridge was retested to identify any changes in its behavior. Post-tensioning forces were removed to reveal any losses over the one-year period. Post-tensioning was reapplied to the bridge, and the bridge was tested using the same loading program used in 1988. Except for at a few locations, stresses were reduced in the bridge the desired amount. At a few locations flexural stresses in the steel beams are still above 18 ksi, the allowable inventory stress for A7 steel. Although maximum stresses are above the inventory stress by about 2 ksi, they are about 5 ksi below the allowable operating stress; therefore, the bridge no longer needs to be load-posted.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Phase I research, Iowa Department of Transportation (IDOT) Project HR-214, "Feasibility Study of Strengthening Existing Single Span Steel Beam Concrete Deck Bridges," verified that post-tensioning can be used to provide strengthening of the composite bridges under investigation. Phase II research, reported here, involved the strengthening of two full-scale prototype bridges - one a prototype of the model bridge tested during Phase I and the other larger and skewed. In addition to the field work, Phase II also involved a considerable amount of laboratory work. A literature search revealed that only minimal data existed on the angle-plus-bar shear connectors. Thus, several specimens utilizing angle-plus-bar, as well as channels, studs and high strength bolts as shear connectors were fabricated and tested. To obtain additional shear connector information, the bridge model of Phase I was sawed into four composite concrete slab and steel beam specimens. Two of the resulting specimens were tested with the original shear connection, while the other two specimens had additional shear connectors added before testing. Although orthotropic plate theory was shown in Phase I to predict vertical load distribution in bridge decks and to predict approximate distribution of post-tensioning for right-angle bridges, it was questioned whether the theory could also be used on skewed bridges. Thus, a small plexiglas model was constructed and used in vertical load distribution tests and post-tensioning force distribution tests for verification of the theory. Conclusions of this research are as follows: (1) The capacity of existing shear connectors must be checked as part of a bridge strengthening program. Determination of the concrete deck strength in advance of bridge strengthening is also recommended. (2) The ultimate capacity of angle-plus-bar shear connectors can be computed on the basis of a modified AASHTO channel connector formula and an angle-to-beam weld capacity check. (3) Existing shear connector capacity can be augmented by means of double-nut high strength bolt connectors. (4) Post-tensioning did not significantly affect truck load distribution for right angle or skewed bridges. (5) Approximate post-tensioning and truck load distribution for actual bridges can be predicted by orthotropic plate theory for vertical load; however, the agreement between actual distribution and theoretical distribution is not as close as that measured for the laboratory model in Phase I. (6) The right angle bridge exhibited considerable end restraint at what would be assumed to be simple support. The construction details at bridge abutments seem to be the reason for the restraint. (7) The skewed bridge exhibited more end restraint than the right angle bridge. Both skew effects and construction details at the abutments accounted for the restraint. (8) End restraint in the right angle and skewed bridges reduced tension strains in the steel bridge beams due to truck loading, but also reduced the compression strains caused by post-tensioning.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Benkelman Beam structural test of flexible pavements was replaced in 1976 by dynamic deflection testing with a model 400 Road Rater. The Road Rater is used to determine structural ratings of flexible pavements. New pavement construction in Iowa has decreased with a corresponding increase of restoration and rehabilitation. A method to determine structural ratings of layered systems and rigid pavements is needed to properly design overlay thickness. The objective of this research was to evaluate the feasibility of using the Road Rater to determine support values of layered systems and rigid pavements. This evaluation was accomplished by correlating the Road Rater with the Federal Highway Administration (FHWA) Thumper, a dynamic deflection testing device. Data were obtained with the Road Rater and Thumper at 411 individual test locations on 39 different structural sections ranging from 10" of PCC pavement and 25" of asphalt pavement to a newly graveled unpaved roadway. A high correlation between a 9000 pound Thumper deflection and the 1185 pound Road Rater deflection was obtained. A Road Rater modification has been completed to provide 2000 pound load inputs. The basin, defined by four sensors spaced at 1 foot intervals, resulting from the 2000 pound loading is being used to develop a graph for determining relative subgrade strengths. Road Rater deflections on rigid pavements are sufficient to support the potential for this technique.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

We describe an improved multiple-locus variable-number tandem-repeat (VNTR) analysis (MLVA) scheme for genotyping Staphylococcus aureus. We compare its performance to those of multilocus sequence typing (MLST) and spa typing in a survey of 309 strains. This collection includes 87 epidemic methicillin-resistant S. aureus (MRSA) strains of the Harmony collection, 75 clinical strains representing the major MLST clonal complexes (CCs) (50 methicillin-sensitive S. aureus [MSSA] and 25 MRSA), 135 nasal carriage strains (133 MSSA and 2 MRSA), and 13 published S. aureus genome sequences. The results show excellent concordance between the techniques' results and demonstrate that the discriminatory power of MLVA is higher than those of both MLST and spa typing. Two hundred forty-two genotypes are discriminated with 14 VNTR loci (diversity index, 0.9965; 95% confidence interval, 0.9947 to 0.9984). Using a cutoff value of 45%, 21 clusters are observed, corresponding to the CCs previously defined by MLST. The variability of the different tandem repeats allows epidemiological studies, as well as follow-up of the evolution of CCs and the identification of potential ancestors. The 14 loci can conveniently be analyzed in two steps, based upon a first-line simplified assay comprising a subset of 10 loci (panel 1) and a second subset of 4 loci (panel 2) that provides higher resolution when needed. In conclusion, the MLVA scheme proposed here, in combination with available on-line genotyping databases (including http://mlva.u-psud.fr/), multiplexing, and automatic sizing, can provide a basis for almost-real-time large-scale population monitoring of S. aureus.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A cardiac-triggered, free-breathing, 3D balanced FFE projection renal MR angiography (MRA) technique with a 2D pencil beam aortic labeling pulse for selective aortic spin tagging was developed. For respiratory motion artifact suppression during free breathing, a prospective real-time navigator was implemented for renal MRA. Images obtained with the new approach were compared with standard contrast-enhanced (CE) 3D breath-hold MRA in seven swine. Signal properties and vessel visualization were analyzed. With the presented technique, high-resolution, high-contrast renal projection MRA with superior vessel length visualization (including a greater visible number of distal branches of the renal arteries) compared to standard breath-hold CE-MRA was obtained. The present results warrant clinical studies in patients with renal artery disease.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Recent reports have indicated that 23.5% of the nation's highway bridges are structurally deficient and 17.7% are functionally obsolete. A significant number of these bridges are on the Iowa secondary road system where over 86% of the rural bridge management responsibilities are assigned to the counties. Some of the bridges can be strengthened or otherwise rehabilitated, but many more are in need of immediate replacement. In a recent investigation (HR-365 "Evaluation of Bridge Replacement Alternatives for the County Bridge System") several types of replacement bridges that are currently being used on low volume roads were identified. It was also determined that a large number of counties (69%) have the ability and are interested in utilizing their own forces to design and construct short span bridges. After reviewing the results from HR-365, the research team developed one "new" bridge replacement concept and a modification of a replacement system currently being used. Both of these bridge replacement alternatives were investigated in this study, the results of which are presented in two volumes. This volume (Volume 2) presents the results of Concept 2 - Modification of the Beam-in-Slab Bridge. Concept 1 - Steel Beam Precast Units is presented in Volume 1. Concept 2 involves various laboratory tests of the Beam-in-Slab bridge (BISB) currently being used by Benton County and several other Iowa counties. In this investigation, the behavior and strength of the BISB were determined; a new method of obtaining composite action between the steel beams and concrete was also tested. Since the Concept 2 bridge is primarily intended for use on low-volume roads, the system can be constructed with new or used beams. In the experimental part of the investigation, there were three types of laboratory tests: push-out tests, service and ultimate load tests of models of the BISB, and composite beam tests utilizing the newly developed shear connection. In addition to the laboratory tests, there was a field test in which an existing BISB was service load tested. An equation was developed for predicting the strength of the shear connection investigated; in addition, a finite element model for analyzing the BISB was also developed. Push-out tests were completed to determine the strength of the recently developed shear connector. A total of 36 specimens were tested, with variables such as hole diameter, hole spacing, presence of reinforcement, etc. being investigated. In the model tests of the BISB, two and four beam specimens [L=9,140 mm (30 ft)] were service load tested for behavior and load distribution data. Upon completion of these tests, both specimens were loaded to failure. In the composite beam tests, four beams, one with standard shear studs and three using the shear connection developed, were tested. Upon completion of the service load tests, all four beams were loaded to failure. The strength and behavior of the beams with the new shear connection were found to be essentially the same as that of the specimen with standard shear studs.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This research project investigated the use of image analysis to measure the air void parameters of concrete specimens produced under standard laboratory conditions. The results obtained from the image analysis technique were compared to results obtained from plastic air content tests, Danish air meter tests (also referred to as Air Void Analyzer tests), high-pressure air content tests on hardened concrete, and linear traverse tests (as per ASTM C-457). Hardened concrete specimens were sent to three different laboratories for the linear traverse tests. The samples that were circulated to the three labs consisted of specimens that needed different levels of surface preparation. The first set consisted of approximately 18 specimens that had been sectioned from a 4 in. by 4 in. by 18 in. (10 cm by 10 cm by 46 cm) beam using a saw equipped with a diamond blade. These specimens were subjected to the normal sample preparation techniques that were commonly employed by the three different labs (each lab practiced slightly different specimen preparation techniques). The second set of samples consisted of eight specimens that had been ground and polished at a single laboratory. The companion labs were only supposed to retouch the sample surfaces if they exhibited major flaws. In general, the study indicated that the image analysis test results for entrained air content exhibited good to strong correlation to the average values determined via the linear traverse technique. Specimens ground and polished in a single laboratory and then circulated to the other participating laboratories for the air content determinations exhibited the strongest correlation between the image analysis and linear traverse techniques (coefficient of determination, r-squared = 0.96, for n=8). Specimens ground and polished at each of the individual laboratories exhibited considerably more scatter (coefficient of determination, r-squared = 0.78, for n=16). The image analysis technique tended to produce low estimates of the specific surface of the voids when compared to the results from the linear traverse method. This caused the image analysis spacing factor calculations to produce larger values than those obtained from the linear traverse tests. The image analysis spacing factors were still successful at distinguishing between the frost-prone test specimens and the other (more durable) test specimens that were studied in this research project.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This project continues the research which addresses the numerous bridge problems on the Iowa secondary road system. It is a continuation (Phase 2) of Project HR-382, in which two replacement alternatives (Concept 1: Steel Beam Precast Units and Concept 2: Modification of the Benton County Beam-in-Slab Bridge) were investigated. In previous research for concept 1, a precast unit bridge was developed through laboratory testing. The steel-beam precast unit bridge requires the fabrication of precast double-tee (PCDT) units, each consisting of two steel beams connected by a reinforced concrete deck. The weight of each PCDT unit is minimized by limiting the deck thickness to 4 in., which permits the units to be constructed off-site and then transported to the bridge site. The number of units required is a function of the width of bridge desired. Once the PCDT units are connected, a cast-in-place reinforced concrete deck is cast over the PCDT units and the bridge railing attached. Since the steel beam PCDT unit bridge design is intended primarily for use on low-volume roads, used steel beams can be utilized for a significant cost savings. In previous research for concept 2, an alternate shear connector (ASC) was developed and subjected to static loading. In this investigation, the ASC was subjected to cyclic loading in both pushout specimens and composite beam tests. Based on these tests, the fatigue strength of the ASC was determined to be significantly greater than that required in typical low volume road single span bridges. Based upon the construction and service load testing, the steel-beam precast unit bridge was successfully shown to be a viable low volume road bridge alternative. The construction process utilized standard methods resulting in a simple system that can be completed with a limited staff. Results from the service load tests indicated adequate strength for all legal loads. An inspection of the bridge one year after its construction revealed no change in the bridge's performance. Each of the systems previously described are relatively easy to construct. Use of the ASC rather than the welded studs significantly simplified the work, equipment, and materials required to develop composite action between the steel beams and the concrete deck.