1000 resultados para athlete monitoring


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The measurement of high speed laser beam parameters during processing is a topic that has seen growing attention over the last few years as quality assurance places greater demand on the monitoring of the manufacturing process. The targets for any monitoring system is to be non-intrusive, low cost, simple to operate, high speed and capable of operation in process. A new ISO compliant system is presented based on the integration of an imaging plate and camera located behind a proprietary mirror sampling device. The general layout of the device is presented along with the thermal and optical performance of the sampling optic. Diagnostic performance of the system is compared with industry standard devices, demonstrating the high quality high speed data which has been generated using this system.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Due to changes in land use over the last century, the physical nature of many streams and rivers in the British Isles has probably changed. In some cases this change may be large for example as a result of flood defence schemes and is easily observed, whilst in other cases altered land use, farming, forestry or urbanization may have resulted in more subtle changes to river features. This working guide draws together a way of assessing habitat in any stream or river and determine sites or reaches on the assessed watercourse that may benefit from habitat improvement schemes. It will determine a method of measuring existing habitat in a broad sense, whilst referring to R and D studies currently being undertaken in this area. A method of prioritising any proposed habitat restoration work will be suggested. The limitations of fisheries improvement schemes in terms of cross functional acceptance (flood defence and conservation) will be examined along with suggested proposals for some example watercourses. The need for pre and post enhancement monitoring will be discussed as will the requirement for maintenance programs on schemes. Finally methods for determining the cost benefits of small schemes will be examined, compared to other currently used enhancement strategies. This will allow small scale revenue schemes to be used to back up pre project cost benefit analysis as required in future capital submissions.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This is a report on monitoring carried out in 2001 specifically in relation to effects of flows and abstractions on fisheries in the River Wharfe. The monitoring is a continuation of that started in relation to the Time Limited Abstraction Licences in 1996 and required by the new licences granted in 1999. It gives information regarding fish populations at a range of sites in the River Wharfe and also two tributary sites. It also gives recommendations for future investigations in relation to both Time Limited Licences and general broader issues.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Fish population studies in the River Ure have continued for their sixth successive year in order to examine and evaluate the effects of low flows and drought conditions particularly in relation to the Time Limited Licence abstraction at Kilgram Bridge, currently granted to Yorkshire Water Services. This monitoring report looks at the different fish populations and growth rates in the main river and tributaries, comparing the results to previous years. The report also looks at the general findings from angling, the medium term drought impacts, the abstraction impacts, and recommendations for investigations for 2002.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Drought Monitoring workshop of October 1996, held at the Jarvis Leyland Hotel in Preston, England, established 4 priority issues for dealing with the question: How do we monitor the environment to pick up unexpected change ? 1. Review existing data, and review related study areas throughout the country. 2. Modelling and analysis of data 3. Monitoring / new data / sentinel species' 4. Public relations / Promotion. A group was set up to review issue 1 and feedback to the main group. This report establishes this feedback to the group and refers to existing data / monitoring, other Regional and national work, external Organisations and Recommendations. Appendix 1, is a summary of work completed at the workshop.