1000 resultados para Wieder gelesen final


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Twelve Mile Creek Lake is a 660 acre, Significant Publicly Owned Lake with a watershed of 14,820 acres for a ratio of 21:3. The watershed is predominately privately owned agricultural land that originates in Adair County and drains into the lake which serves as the primary source water for the City of Creston, Union County and the seven counties served by the Southern Iowa Rural Water Association. In recent years, frequent algae blooms and recurrent spikes in suspended solid concentrations have been inflating water treatment expenses for the Creston Municipal Utilities (CMU). Declining trends in water quality spurred CMU to enlist the Union Soil and Water Conservation District (SWCD) to assist in evaluating watershed conditions for potential upland improvements. Significant gully erosion issues that had been previously underestimated were discovered during this watershed assessment process. Newly acquired LiDAR elevation data readily revealed this concern which was previously obscured from view by the dense tree canopy. A Watershed Development and Planning Assistance Grant Application was approved and funded by the Iowa Department of Ag and Land Stewardship- Division of Soil Conservation. Throughout the planning process, project partners innovatively evaluated and prioritized a number of resource concerns throughout the watershed. The implementation plan presented will thwart these threats which left unaided will continue to diminish the overall health of the system, reduce the appeal of the lake to recreational users, and contribute to higher water treatment costs.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Little Bear Creek is a 21.79 mile Class A1 and B (WW2) warm water stream that encompasses approximately 29,202 acres in northern Poweshiek County. The lower 8.4 mile segment is listed as biologically impaired on both the IDNR 2008 303(d) list and 2010 303(d) draft list. A RASCAL assessment and landowner survey was completed through a development grant in 2011, and these assessments indicate that erosion and sediment delivery from cropland, lack of adequate buffers along the stream channel, and streambank conditions contribute significant sediment delivery to the stream, likely resulting in the impairment. An estimated 36,544 tons of sediment are delivered to the stream annually. A total of 11,075 acres (38%) of the watershed are high priority areas or land with sediment delivery rates greater than one. Our goal over 15 years is to install Best Management Practices (BMPs) and increase public education in order to reduce sediment and phosphorus delivery by 25% and decrease priority areas by 15%. More specific objectives for this WIRB project are to 1) Reduce annual sediment delivery by roughly 16.3% or 1,058 tons and associated phosphorus delivery by 1,375 pounds and 2) Develop an information and education program aimed at producers and residents within the headwaters of Grant and Chester townships, which account for 18% of the watershed's priority areas. The SWCD proposes to utilize 50% EQIP funds and 25% WIRB funds toward rural BMPs, and 75% WIRB funds toward urban BMPs received through this application.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The children's mental health and well-being work group was formed in response to legislative direction to facilitate a study and make recommendations regarding children's mental health and the systems that assist children and families in Iowa.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Waterloo Creek Watershed is a 30,610 acre area that straddles the Iowa and Minnesota border. The lower 43% of the watershed is in Iowa. Bee and Duck Creeks in Minnesota flow into Waterloo Creek in Iowa. Designated as a primary contact recreational stream as well as a high-quality, cold water stream in Iowa, Waterloo Creek is a popular destination for anglers and other nature enthusiasts. The stream was on the Iowa DNR’s “Impaired Waters List” in 2008 and 2010 for Escherichia coli (E. coli) bacteria. Samples collected in 2010 and 2011 showed higher levels of E. coli. at sites with cattle in close proximity to the stream and were generally greater after high rainfall events. Other factors affecting water quality are high turbidity levels and frequent flooding. There is a deficiency in upland land treatment and an abundance of conventional tillage which increases the amount of erosion and potential for surface runoff to carry sediment to the stream. A comprehensive watershed assessment and management plan have been completed for the watershed which identify the causes of and solutions to water quality impairments. The goals of this project are to 1) develop a formal working relationship between technical staff in Iowa and Minnesota, 2) identify specific locations for Best Management Practice (BMP) implementation, 3) reduce sediment loading to Waterloo Creek to improve aquatic habitat and decrease bacteria delivery, and 4) reduce flooding potential in the watershed. The following BMPs will be implemented to reach these goals: terraces, grade stabilization structures, pasture management, stream buffers, stream bank stabilization, and agricultural waste structures.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Brief Project Summary (no greater than this space allows): Leisure Lake is a 20 acre water body located in northwest Jackson County with a 2,581 acre drainage area. This portion of the Maquoketa Watershed including the lake is a tributary to Lytle Creek which drains into the North Fork Maquoketa River and into the Maquoketa Watershed. Portions of the Lytle Creek and North Fork Maquoketa River are on the 303(d) impaired waterbodies list. The project area includes a community of 370 residential properties and one business that currently has no central waste water collection and treatment system. The County Sanitarian estimates at least 225 of these properties do not have properly operating septic systems and ultimately drain their wastewater into the lake. The purpose of this project is to construct a wastewater collection and treatment facility to improve water quality in the creek and river. The project will eliminate the non-permitted septic systems and construct a new wastewater system to properly treat wastewater prior to its discharge into the waterways.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This report proposes, that for certain types of highway construction projects undertaken by the Iowa Department of Transportation, a scheduling technique commonly referred to as linear scheduling may be more effective than the Critical Path Method scheduling technique that is currently being used. The types of projects that appear to be good candidates for the technique are those projects that have a strong linear orientation. Like a bar chart, this technique shows when an activity is scheduled to occur and like a CPM schedule it shows the sequence in which activities are expected to occur. During the 1992 construction season, the authors worked with an inlay project on Interstate 29 to demonstrate the linear scheduling technique to the Construction Office. The as-planned schedule was developed from the CPM schedule that the contractor had developed for the project. Therefore, this schedule represents what a linear representation of a CPM schedule would look like, and not necessarily what a true linear schedule would look like if it had been the only scheduling technique applied to the project. There is a need to expand the current repertoire of scheduling techniques to address those projects for which the bar chart and CPM may not be appropriate either because of the lack of control information or due to overly complex process for the actual project characteristics. The scheduling approaches used today on transportation projects have many shortcomings for properly modeling the real world constraints and conditions which are encountered. Linear project's predilection for activities with variable production rates, a concept very difficult to handle with the CPM, is easily handled and visualized with the linear technique. It is recommended that work proceed with the refinement of the method of linear scheduling described above and the development of a microcomputer based system for use by the Iowa Department of Transportation and contractors for its implementation. The system will be designed to provide the information needed to adjust schedules in a rational understandable method for monitoring progress on the projects and alerting Iowa Department of Transportation personnel when the contractor is deviating from the plan.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The state Departments of Transportation (DOTs) of Iowa, Michigan, and Minnesota formed a consortium to define and develop the next generation highway maintenance vehicle. The Center for Transportation Research and Education of Iowa State University provided staff support to the concept highway maintenance vehicle project, which focused on winter maintenance activities. Phase I of the three-phase project focused on describing the desirable functions of a concept maintenance vehicle. Phase II will include the development, operation, and evaluation of prototype winter maintenance vehicles. Phase III is envisioned to be a comprehensive fleet evaluation of prototype winter maintenance vehicles. This report covers the activities of Phase I. Phase I included conducting a literature review of materials related to winter highway maintenance activities, identifying ideal capabilities of a winter maintenance vehicle, inviting private sector equipment and technology providers to join the project and commit equipment and expertise for Phase II, and determining the specific equipment and technology to be included on the three prototype vehicles for the winter of 1996-1997. Phase I concluded by establishing that assembling the three prototype vehicles would be beneficial to the project and to the three state DOTs.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This report was prepared pursuant to Senate File 505, which tasks the Office of the State Long-Term Care Ombudsman with convening a multiagency workgroup to gather information and provide recommendations for the establishment of a Health Consumer Ombudsman Alliance.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The goal of this research was to recommend specific changes relating to service by intercity buses and third level air carriers to propose an appropriate state role in the implementation of changes. Changes contemplated in this research were to be directed to the increased use of intercity buses and third level air carriers in such manner as to exert a benefit to user as well as the general public. Specific objectives of the project included: (1) to analyze the potential for a system of express intercity bus routes in Iowa; (2) to estimate the demand for third level air carrier services in cities having populations under 50,000; (3) to forecast the relationship between economic costs and benefits from an intercity bus system emphasizing express routes between major population centers and supporting a subsystem of local and intraregional public transportation; (4) to estimate the economic feasibility of expanded third level air carrier service with emphasis upon those routes proposed as worth of further evaluation; and (5) to provide guidance for establishing the need for state and local subsidies to institute a system of express intercity buses and to expand third level air carrier services. In addition to passenger movements, enhancing package freight shipments was also to be considered in the evaluation of proposed improvements.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Iowa Diabetes Prevention and Control Program provides educational opportunities for health care providers via the Iowa Communications Network interactive fiber optic system. The program also certifies diabetes outpatient education programs in Iowa based on minimum criteria for quality programs. In Iowa during the past 20 years, the prevalence rate of diagnosed diabetes increased dramatically among adults: Between 1991 and 2009 the crude diabetes prevalence rate rose by 84%, from 3.8% to 7.0%. Between these years, the age‐adjusted adult diagnosed diabetes prevalence rate increased by 64%, rising from 3.7% to 6.4%. During the 18 years 1991‐93 through 2006‐08, the number of Iowa adults with diagnosed diabetes more than doubled, increasing from 78,000 to 162,000. While the Iowa Behavioral Risk Factor Surveillance System (BRFSS), upon which the numbers cited above are based, provides reliable state‐level self‐reported data on adults with diagnosed diabetes, it is unable to provide estimates of undiagnosed diabetes. National estimates put the prevalence of undiagnosed adult diabetes at about 5%, raising the estimated adult diabetes prevalence rate in Iowa to 12% (280,000 adults) (Cowie,2009). Another 5% of all Iowa adults are estimated to have diagnosed pre‐diabetes, while 25% of all Iowa adults, based on national estimates from the 2005‐06 National Health and Nutrition and Examination Survey (NHANES), likely have undiagnosed pre‐diabetes. (Cowie, 2009)

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Se presenta un TFG (Trabajo de Final de Grado) que se realizó durante el curso académico 2011-12 en el Grado de Farmacia de la UB. Su objetivo fue describir los conocimientos y opiniones de los estudiantes del Grado de Farmacia-UB, respecto a la prevención de enfermedades de transmisión sexual y embarazos no deseados.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Iowa Diabetes Prevention and Control Program provides educational opportunities for health care providers via the Iowa Communications Network interactive fiber optic system. The program also certifies diabetes outpatient education programs in Iowa.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In 1957, the Iowa State Highway Commission, with financial assistance from the aluminum industry, constructed a 220-ft (67-m) long, four-span continuous, aluminum girder bridge to carry traffic on Clive Road (86th Street) over Interstate 80 near Des Moines, Iowa. The bridge had four, welded I-shape girders that were fabricated in pairs with welded diaphragms between an exterior and an interior girder. The interior diaphragms between the girder pairs were bolted to girder brackets. A composite, reinforced concrete deck served as the roadway surface. The bridge, which had performed successfully for about 35 years of service, was removed in the fall of 1993 to make way for an interchange at the same location. Prior to the bridge demolition, load tests were conducted to monitor girder and diaphragm bending strains and deflections in the northern end span. Fatigue testing of the aluminum girders that were removed from the end spans were conducted by applying constant-amplitude, cyclic loads. These tests established the fatigue strength of an existing, welded, flange-splice detail and added, welded, flange-cover plates and horizontal web plate attachment details. This part, Part 2, of the final report focuses on the fatigue tests of the aluminum girder sections that were removed from the bridge and on the analysis of the experimental data to establish the fatigue strength of full-size specimens. Seventeen fatigue fractures that were classified as Category E weld details developed in the seven girder test specimens. Linear regression analyses of the fatigue test results established both nominal and experimental stress-range versus load cycle relationships (SN curves) for the fatigue strength of fillet-welded connections. The nominal strength SN curve obtained by this research essentially matched the SN curve for Category E aluminum weldments given in the AASHTO LRFD specifications. All of the Category E fatigue fractures that developed in the girder test specimens satisfied the allowable SN relationship specified by the fatigue provisions of the Aluminum Association. The lower-bound strength line that was set at two standard deviations below the least squares regression line through the fatigue fracture data points related well with the Aluminum Association SN curve. The results from the experimental tests of this research have provided additional information regarding behavioral characteristics of full-size, aluminum members and have confirmed that aluminum has the strength properties needed for highway bridge girders.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this report, the authors present the data accumulated from a one-year study of runoff quantity and quality from two sections of Interstate Highway 35 near Ames with an interpretation of the significance of the data. The report will discuss the site setup, operational aspects of data collection, and problems encountered. In addition, recommendations are included to optimize information gained from the study.