882 resultados para SCHEDULING


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The study of the user scheduling problem in a Low Earth Orbit (LEO) Multi-User MIMO system is the objective of this thesis. With the application of cutting-edge digital beamforming algorithms, a LEO satellite with an antenna array and a large number of antenna elements can provide service to many user terminals (UTs) in full frequency reuse (FFR) schemes. Since the number of UTs on-ground are many more than the transmit antennas on the satellite, user scheduling is necessary. Scheduling can be accomplished by grouping users into different clusters: users within the same cluster are multiplexed and served together via Space Division Multiple Access (SDMA), i.e., digital beamforming or Multi-User MIMO techniques; the different clusters of users are then served on different time slots via Time Division Multiple Access (TDMA). The design of an optimal user grouping strategy is known to be an NP-complete problem which can be solved only through exhaustive search. In this thesis, we provide a graph-based user scheduling and feed space beamforming architecture for the downlink with the aim of reducing user inter-beam interference. The main idea is based on clustering users whose pairwise great-circle distance is as large as possible. First, we create a graph where the users represent the vertices, whereas an edge in the graph between 2 users exists if their great-circle distance is above a certain threshold. In the second step, we develop a low complex greedy user clustering technique and we iteratively search for the maximum clique in the graph, i.e., the largest fully connected subgraph in the graph. Finally, by using the 3 aforementioned power normalization techniques, a Minimum Mean Square Error (MMSE) beamforming matrix is deployed on a cluster basis. The suggested scheduling system is compared with a position-based scheduler, which generates a beam lattice on the ground and randomly selects one user per beam to form a cluster.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Daytime fatigue and lack of sleep seem to increase throughout adolescent years. Several environmental, psychological, and biological factors have been associated with the development of sleep across adolescence. The aim of the present article is to summarize these factors and to give examples of various outcomes in sleep patterns among adolescents studied in different cultural settings. It is obvious from earlier work that many adolescents have displaced circadian rhythms and lack of adaptation to school hours due to an early school start or additional burdens for work. Several interventions have aimed to help the adaptation process by supporting sleep processes and changing scheduling, in this way promoting classroom alertness. In summary, adolescents worldwide shorten their sleep due to schoolwork hours and additional work, especially by disturbing their sleep due to circadian misalignment

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This paper deals with the traditional permutation flow shop scheduling problem with the objective of minimizing mean flowtime, therefore reducing in-process inventory. A new heuristic method is proposed for the scheduling problem solution. The proposed heuristic is compared with the best one considered in the literature. Experimental results show that the new heuristic provides better solutions regarding both the solution quality and computational effort.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In this paper, we address the problem of scheduling jobs in a no-wait flowshop with the objective of minimising the total completion time. This problem is well-known for being nondeterministic polynomial-time hard, and therefore, most contributions to the topic focus on developing algorithms able to obtain good approximate solutions for the problem in a short CPU time. More specifically, there are various constructive heuristics available for the problem [such as the ones by Rajendran and Chaudhuri (Nav Res Logist 37: 695-705, 1990); Bertolissi (J Mater Process Technol 107: 459-465, 2000), Aldowaisan and Allahverdi (Omega 32: 345-352, 2004) and the Chins heuristic by Fink and Voa (Eur J Operat Res 151: 400-414, 2003)], as well as a successful local search procedure (Pilot-1-Chins). We propose a new constructive heuristic based on an analogy with the two-machine problem in order to select the candidate to be appended in the partial schedule. The myopic behaviour of the heuristic is tempered by exploring the neighbourhood of the so-obtained partial schedules. The computational results indicate that the proposed heuristic outperforms existing ones in terms of quality of the solution obtained and equals the performance of the time-consuming Pilot-1-Chins.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Scheduling parallel and distributed applications efficiently onto grid environments is a difficult task and a great variety of scheduling heuristics has been developed aiming to address this issue. A successful grid resource allocation depends, among other things, on the quality of the available information about software artifacts and grid resources. In this article, we propose a semantic approach to integrate selection of equivalent resources and selection of equivalent software artifacts to improve the scheduling of resources suitable for a given set of application execution requirements. We also describe a prototype implementation of our approach based on the Integrade grid middleware and experimental results that illustrate its benefits. Copyright (C) 2009 John Wiley & Sons, Ltd.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Vessel dynamic positioning (DP) systems are based on conventional PID-type controllers and an extended Kalman filter. However, they present a difficult tuning procedure, and the closed-loop performance varies with environmental or loading conditions since the dynamics of the vessel are eminently nonlinear. Gain scheduling is normally used to address the nonlinearity of the system. To overcome these problems, a sliding mode control was evaluated. This controller is robust to variations in environmental and loading conditions, it maintains performance and stability for a large range of conditions, and presents an easy tuning methodology. The performance of the controller was evaluated numerically and experimentally in order to address its effectiveness. The results are compared with those obtained from conventional PID controller. (c) 2010 Elsevier Ltd. All rights reserved.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This work presents a method for predicting resource availability in opportunistic grids by means of use pattern analysis (UPA), a technique based on non-supervised learning methods. This prediction method is based on the assumption of the existence of several classes of computational resource use patterns, which can be used to predict the resource availability. Trace-driven simulations validate this basic assumptions, which also provide the parameter settings for the accurate learning of resource use patterns. Experiments made with an implementation of the UPA method show the feasibility of its use in the scheduling of grid tasks with very little overhead. The experiments also demonstrate the method`s superiority over other predictive and non-predictive methods. An adaptative prediction method is suggested to deal with the lack of training data at initialization. Further adaptative behaviour is motivated by experiments which show that, in some special environments, reliable resource use patterns may not always be detected. Copyright (C) 2009 John Wiley & Sons, Ltd.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The flowshop scheduling problem with blocking in-process is addressed in this paper. In this environment, there are no buffers between successive machines: therefore intermediate queues of jobs waiting in the system for their next operations are not allowed. Heuristic approaches are proposed to minimize the total tardiness criterion. A constructive heuristic that explores specific characteristics of the problem is presented. Moreover, a GRASP-based heuristic is proposed and Coupled with a path relinking strategy to search for better outcomes. Computational tests are presented and the comparisons made with an adaptation of the NEH algorithm and with a branch-and-bound algorithm indicate that the new approaches are promising. (c) 2007 Elsevier Ltd. All rights reserved.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Leaf wetness duration (LWD) is related to plant disease occurrence and is therefore a key parameter in agrometeorology. As LWD is seldom measured at standard weather stations, it must be estimated in order to ensure the effectiveness of warning systems and the scheduling of chemical disease control. Among the models used to estimate LWD, those that use physical principles of dew formation and dew and/or rain evaporation have shown good portability and sufficiently accurate results for operational use. However, the requirement of net radiation (Rn) is a disadvantage foroperational physical models, since this variable is usually not measured over crops or even at standard weather stations. With the objective of proposing a solution for this problem, this study has evaluated the ability of four models to estimate hourly Rn and their impact on LWD estimates using a Penman-Monteith approach. A field experiment was carried out in Elora, Ontario, Canada, with measurements of LWD, Rn and other meteorological variables over mowed turfgrass for a 58 day period during the growing season of 2003. Four models for estimating hourly Rn based on different combinations of incoming solar radiation (Rg), airtemperature (T), relative humidity (RH), cloud cover (CC) and cloud height (CH), were evaluated. Measured and estimated hourly Rn values were applied in a Penman-Monteith model to estimate LWD. Correlating measured and estimated Rn, we observed that all models performed well in terms of estimating hourly Rn. However, when cloud data were used the models overestimated positive Rn and underestimated negative Rn. When only Rg and T were used to estimate hourly Rn, the model underestimated positive Rn and no tendency was observed for negative Rn. The best performance was obtained with Model I, which presented, in general, the smallest mean absolute error (MAE) and the highest C-index. When measured LWD was compared to the Penman-Monteith LWD, calculated with measured and estimated Rn, few differences were observed. Both precision and accuracy were high, with the slopes of the relationships ranging from 0.96 to 1.02 and R-2 from 0.85 to 0.92, resulting in C-indices between 0.87 and 0.93. The LWD mean absolute errors associated with Rn estimates were between 1.0 and 1.5h, which is sufficient for use in plant disease management schemes.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Due to the rapid depletion of water resources, water must be used more efficiently in agriculture to maintain current levels of yield in irrigated areas. The efficiency of irrigation systems can be increased by adjusting the amount of water applied to specific conditions of soil and crop, which may vary in a field. Taking into account spatial and temporal variability, it is evident that an equipment capable of providing different irrigation levels is necessary to meet the water requirement of the soil. This work aims to develop and evaluate a flow rate sprinkler to be used in center pivots or linear moving irrigation systems, with potential for utilization in irrigation scheduling. A prototype was developed by duplicating its calibrations, and discharge coefficient adjustment was carried out in the laboratory. To predict the flow rate, a successful model that represented the operation of the flow rate sprinkler was established. The calibration of the flow rate sprinkler prototype showed satisfactory statistical and technical results. Automation of the prototype was achieved by driving a step motor using communication from the parallel port of a microcomputer, which was controlled by a software developed for this purpose. The results were satisfactory and technically feasible.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The present study examined the effects of work control and job demands on employee adjustment and work performance using a multidimensional measure of work control (assessing levels of task control, decision control and work scheduling control). It was proposed that the negative effects of job demands and employee adjustment would be moderated by high levels of task control. It was also proposed that there would be evidence of main effects of both job demands and work control (particularly task-related levels of control) on employee adjustment. To test these predictions, a study of 135 university employees holding administrative positions was undertaken. Methodological improvements over previous research included the use of both self-reported adjustment measures and supervisor ratings of work performance as outcome variables, and the assessment of the predictor and outcome measures at different points in time (self-reported adjustment was assessed at both Times 1 and 2). The results revealed some support for the proposal that the effects of job demands would be buffered by high levels of task control, but not more peripheral aspects of work control. There were also significant main effects of task control on job satisfaction.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This paper seeks to understand how software systems and organisations co-evolve in practice and how order emerges in the overall environment. Using a metaphor of timetable as a commons, we analyse the introduction of a novel academic scheduling system to demonstrate how Complex Adaptive Systems theory provides insight into the adaptive behaviour of the various actors and how their action is both a response to and a driver of co-evolution within the engagement.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Leaf water potential (psi (l)) represents a good indicator of the water status of plants, and continuous monitoring of it can be useful in research and field applications such as scheduling irrigation. Changes in stem diameter (Sd) were used for monitoring psi (l) of pot-grown sorghum [Sorghum bicolor (L.) Moench] plants in a glasshouse. This method requires occasional calibration of S-d values against psi (l). Predicted values of psi (l), based on a single calibration show a good correlation with measured psi (l), values over a period of 13 d before and after the calibration. The correlation can further be improved with shorter time intervals.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

A atenção primária visa garantir cobertura e acesso a cuidados de saúde abrangentes e aceitáveis pela população enfatizando a prevenção e a educação (STARFIELD, 2004). No Brasil a Estratégia Saúde da Família (ESF) é o modelo implantado pelo Ministério da Saúde (MS) com a finalidade de reestruturação da atenção primária e já abrange cerca de 50% da população. Segundo Starfield (2004) a atenção primária pode ser avaliada através de seus atributos essenciais: atenção de primeiro contato (utilização e acessibilidade), longitudinalidade, integralidade e coordenação de cuidados. No contexto da atenção à saúde brasileira, a mortalidade infantil é fato preocupante, principalmente a mortalidade que ocorre nos primeiros dias de vida. Este componente da mortalidade é intimamente relacionado à qualidade da atenção recebida no período gestacional. A atenção pré-natal deve incluir ações organizadas, amplas, integradas e com cobertura abrangente de promoção e prevenção da saúde, além de diagnóstico e tratamento adequado dos problemas que possam vir a ocorrer nesse período. O objetivo do presente estudo foi analisar o pré-natal de um grupo de puérperas quanto aos atributos da atenção primária acessibilidade e longitudinalidade. Para alcançar este objetivo foram realizadas 80 entrevistas com mulheres que realizaram pré-natal na atenção primária e 19 mulheres que realizaram pré-natal no Hospital Universitário Cassiano Antônio de Moraes (HUCAM). Utilizou-se parcialmente o questionário de avaliação da atenção primária PCATool. As puérperas também foram questionadas quanto à percepção da adequação do pré-natal realizado. A acessibilidade foi baixa para a maioria das entrevistadas. Nas puérperas que realizaram o pré-natal na Atenção primária a acessibilidade foi estatisticamente maior naquelas que realizaram pré-natal na ESF e naquelas que utilizaram as unidades de saúde do município de Vitória (ES). A longitudinalidade se relacionou ao tipo de unidade de saúde do pré-natal, ao número de consultas realizadas e ao índice de Ápgar no primeiro minuto. A percepção de um pré-natal adequado se relacionou com a utilização da ESF como serviço de pré-natal e à realização de seis ou mais consultas. Apesar de as puérperas do grupo que realizou o pré-natal no HUCAM perceberem o atendimento pré-natal como adequado, algumas questões revelaram fragilidades na assistência, principalmente quanto ao acesso ao serviço. A impossibilidade de receber atendimento pela equipe fora dos horários de funcionamento do ambulatório, a falta de um número de telefone no qual possam sanar dúvidas ou falar com o médico responsável pelo pré-natal, a percepção de dificuldade na marcação de consultas e a espera prolongada no dia do atendimento são pontos que devem ser melhorados nessa assistência.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The exponential increase of home-bound persons who live alone and are in need of continuous monitoring requires new solutions to current problems. Most of these cases present illnesses such as motor or psychological disabilities that deprive of a normal living. Common events such as forgetfulness or falls are quite common and have to be prevented or dealt with. This paper introduces a platform to guide and assist these persons (mostly elderly people) by providing multisensory monitoring and intelligent assistance. The platform operates at three levels. The lower level, denominated ‘‘Data acquisition and processing’’performs the usual tasks of a monitoring system, collecting and processing data from the sensors for the purpose of detecting and tracking humans. The aim is to identify their activities in an intermediate level called ‘‘activity detection’’. The upper level, ‘‘Scheduling and decision-making’’, consists of a scheduler which provides warnings, schedules events in an intelligent manner and serves as an interface to the rest of the platform. The idea is to use mobile and static sensors performing constant monitoring of the user and his/her environment, providing a safe environment and an immediate response to severe problems. A case study on elderly fall detection in a nursery home bedroom demonstrates the usefulness of the proposal.