993 resultados para SANITATION SERVICES


Relevância:

20.00% 20.00%

Publicador:

Resumo:

RFID, in its different forms, but especially following EPCglobal standards, has become a key enabling technology for many applications. An essential component to develop track and trace applications in a complex multi-vendor scenario are the Discovery Services. Although they are already envisaged as part of the EPCglobal network architecture, the functional definition and standardization of the Discovery Service is still at a very early stage. Within the scope of the BRIDGE project, a specification for the interfaces of Discovery Services has been developed, together with a prototype to validate the design and different models to enhance supply-chain control through track and trace applications. © 2008 IEEE.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

There is growing interest in Discovery Services for locating RFID and supply chain data between companies globally, to obtain product lifecycle information for individual objects. Discovery Services are heralded as a means to find serial-level data from previously unknown parties, however more realistically they provide a means to reduce the communications load on the information services, the network and the requesting client application. Attempts to design a standardised Discovery Service will not succeed unless security is considered in every aspect of the design. In this paper we clearly show that security cannot be bolted-on in the form of access control, although this is also required. The basic communication model of the Discovery Service critically affects who shares what data with whom, and what level of trust is required between the interacting parties. © 2009 IEEE.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The objective of the study was to assess the economic value of ecosystem services in the Bay of Bengal.The manin aim was to support the development of a Strategic Action Plan (SAP). Findings included: economic consequences of ecosystem change; potential economic instruments to strengthen sustainable management; and recommendations on next steps in using economic valuation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The results reported on were from a monitoring survey No. 10 undertaken between 23 rd and 29th April 2012 during construction period of the Bujagali Hydropower Project (BHPP). Two pre-construction, baseline surveys in April 2000 and April 2006 were conducted and so far, during construction phase of the project, nine monitoring surveys have been undertaken i.e. in September 2007, April 2008, April 2009, October 2009, April 2010, September 2010, April 2011, September 2011and the present one, in April 2012. Since 2009 biannual monitoring surveys have been conducted at an upstream and a downstream transect of the BHPP with emphasis on the following aspects: water quality determinants biology and ecology of fishes and food webs fish stock and fish catch including economic aspects of catch and sanitation/vector studies (bilharzias and river blindness) During this survey, baseline assessment of the above mentioned studies was conducted in the reservoir behind the dam, including studies on algae, zooplankton and benthic macroinvertebrates which had been restrained since April 2008. The findings of baseline assessment of the reservoir are also contained in this report and are compared with those obtained from Transect 1(Upstream) and Transect 2 (Downstream).

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This monitoring survey No. 11 undertaken between 4th and 9th September 2012 is the second one to be conducted after completion of construction of Bujagali Hydropower Dam. Two pre-construction baseline surveys in April 2000 and April 2006 were conducted and during construction phase, eight monitoring surveys (September 2007, April 2008, April 2009, October 2009, April 2010, September 2010, April 2011, September 2011) were conducted.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The results reported on were from a monitoring survey No.7 undertaken between 4 th and 7th September 2010 during construction period of the Bujagali Hydropower Project (BHPP). Two pre-construction, baseline surveys in April 2000 and April 2006 were conducted and so far, during construction phase of the project, six monitoring surveys have been undertaken i.e. in September 2007, April 2008, April 2009, October 2009, April 2010 and the present one, in September 2010. Since 2009 biannual monitoring surveys have been conducted at an upstream and a downstream transect of the BHPP with emphasis on the following aspects: I. water quality determinants 2. biology and ecology of fishes and food webs 3. fish stock and fish catch including economic aspects of catch and 4. sanitation/vector studies (bilharzias and river blindness)

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Bujagali hydropower dam construction is now completed and a reservoir behind the dam has been created, extending all the way up to Kalange-Makwanzi, an upstream transects. During the 10th monitoring survey-April 2012, a third transect was established in the mid of the reservoir where it runs up to 30 m deep and sampled similarly as at the two original sampling transects, Kalange-Makwanzi and Buyala-Kikubamutwe for comparative purposes. This monitoring survey No. 12 undertaken between 25th and 30th April 2013 is the third one to be conducted after completion of construction of Bujagali Hydropower Dam. Two pre-construction baseline surveys in April 2000 and April 2006 were conducted and during construction phase, eight monitoring surveys (September 2007, April 2008, April 2009, October 2009, April 2010, September 2010, April 2011, September 2011) were conducted. Since 2009 biannual monitoring surveys have been conducted at an upstream and a downstream transect of the BHPP with emphasis on the following aspects: water quality determinants, biology and ecology of fishes and food webs, fish stock and fish catch including economic aspects of catch and sanitation/vector studies (bilharzias and river blindness). In the post-construction monitoring surveys, the assessments of algae, zooplankton and benthic macro-invertebrates which had been restrained since April 2008 were also included.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Product/service-systems (PSS) are in effect an approach to designing integrated products and services with a focus on both customer and product life cycle activities. A range of service-oriented design strategies can be found in current literature, from product-oriented DfX approaches to more customer-oriented approaches, such as integrated solutions. In this article, design strategies related to different types of services are mapped. Case studies from two industrial companies are used to confront the existing literature in order to improve the understanding of how manufacturing companies may align their product and service development activities with their business strategies. © 2010.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper discusses the sustainability of two different approaches to upgrade water and sanitation infrastructure in Kenya’s largest informal settlement, Kibera. A background to the urbanization of poverty is outlined along with approaches to urban slums. Two case-studies of completed interventions of infrastructure upgrading have been investigated. In one case-study, the upgrading method driven by an NGO uses an integrated livelihoods and partnership technique at community level to create an individual project. in the other case-study, the method is a collaboration between the government and a multi-lateral agency to deliver upgraded services as a part of a country-wide programme. The ‘bottom-up’ (project) and ‘top-down’ (programme) approaches each seek sustainability and aim to achieve this in the same context using different techniques. This paper investigates the sustainability of each approach. The merits and challenges of the approaches are discussed with the projected future of Kibera. The paper highlights the valuable opportunity for the role of appropriate engineering infrastructure for sustainable urban development, as well as the alleviation of poverty in a developing context.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Services based around complex engineering equipment and systems provide substantial challenges in both the long-term management of the equipment and the need for guaranteed delivery of the related service. One of the challenges for an organisation providing these services is the management of the information that is required to design, deliver and subsequently assess the success of the service. To assist in this process this paper develops a model for capturing, organising and assessing information requirements for these Complex Engineering Services in which information required to support key decisions in the life cycle of the service is identified. The model – referred to as The 12-Box Model for Service Information Requirements – is embedded in a three-phase procedure for providing an assessment of information requirements of a service contract which also provides insight into the capabilities of available information systems in supporting the contract. An illustrative example examining service information in an aircraft availability contract is used to demonstrate the use of the 12-Box Model and associated assessment procedure.