988 resultados para London (Watford) Spring-Water Company.
Resumo:
More than 1 billion people lack access to clean water and proper sanitation. As part of efforts to solve this problem, there is a growing shift from public to private water management led by The World Bank and the International Monetary Fund (IMF). This shift has inspired much related research. Researchers have assessed water privatization related perceptions of consumers, government officials, and multinational company agents. This thesis presents results of a study of nongovernmental (NGO) staff perceptions of water privatization. Although NGOs are important actors in sustainable water related development through water provision, we have little understanding of their perceptions of water privatization and how it impacts their activities. My goal was to fill this gap. I sampled international and national development NGOs with water, sanitation, and hygiene (WASH) foci. I conducted 28 interviews between January and June of 2011 with staff in key positions including water policy analysts, program officers, and project coordinators. Their perceptions of water privatization were mixed. I also found that local water privatization in most cases does not influence NGO decisions to conduct projects in a region. I found that development NGO staff base their beliefs about water privatization on a mix of personal experience and media coverage. My findings have important implications for the WASH sector as we work to solve the worsening global water access crisis.
Resumo:
Despite failed attempts at obtaining a potable water system, the village of El Caracol in Southern Honduras remains committed to improving access to water resources. To assist in this endeavor, an investigation of the hydrogeological characteristics of the local watershed was conducted. Daily precipitation was recorded to examine the relationship between precipitation and approximated river and spring discharges. A Thornthwaite Mather Water Balance Model was used to predict monthly discharges for comparison with observed values, and to infer the percentage of topographic watersheds contributing to the respective discharges. As aquifer porosity in this region is thought to be primarily secondary (i.e., fractures), field observed lineaments were compared with those interpreted from remote sensing imagery in an attempt to determine the usefulness of these interpretations in locating potential water sources for a future project.
Resumo:
Water springs are the principal source of water for many localities in Central America, including the municipality of Concepción Chiquirichapa in the Western Highlands of Guatemala. Long-term monitoring records are critical for informed water management as well as resource forecasting, though data are scarce and monitoring in low-resource settings presents special challenges. Spring discharge was monitored monthly in six municipal springs during the author’s Peace Corps assignment, from May 2011 to March 2012, and water level height was monitored in two spring boxes over the same time period using automated water-level loggers. The intention of this approach was to circumvent the need for frequent and time-intensive manual measurement by identifying a fixed relationship between discharge and water level. No such relationship was identified, but the water level record reveals that spring yield increased for four months following Tropical Depression 12E in October 2011. This suggests that the relationship between extreme precipitation events and long-term water spring yields in Concepción should be examined further. These limited discharge data also indicate that aquifer baseflow recession and catchment water balance could be successfully characterized if a long-term discharge record were established. This study also presents technical and social considerations for selecting a methodology for spring discharge measurement and highlights the importance of local interest in conducting successful community-based research in intercultural low-resource settings.
Resumo:
More than eighteen percent of the world’s population lives without reliable access to clean water, forced to walk long distances to get small amounts of contaminated surface water. Carrying heavy loads of water long distances and ingesting contaminated water can lead to long-term health problems and even death. These problems affect the most vulnerable populations, women, children, and the elderly, more than anyone else. Water access is one of the most pressing issues in development today. Boajibu, a small village in Sierra Leone, where the author served in Peace Corps for two years, lacks access to clean water. Construction of a water distribution system was halted when a civil war broke out in 1992 and has not been continued since. The community currently relies on hand-dug and borehole wells that can become dirty during the dry season, which forces people to drink contaminated water or to travel a far distance to collect clean water. This report is intended to provide a design the system as it was meant to be built. The water system design was completed based on the taps present, interviews with local community leaders, local surveying, and points taken with a GPS. The design is a gravity-fed branched water system, supplied by a natural spring on a hill adjacent to Boajibu. The system’s source is a natural spring on a hill above Boajibu, but the flow rate of the spring is unknown. There has to be enough flow from the spring over a 24-hour period to meet the demands of the users on a daily basis, or what is called providing continuous flow. If the spring has less than this amount of flow, the system must provide intermittent flow, flow that is restricted to a few hours a day. A minimum flow rate of 2.1 liters per second was found to be necessary to provide continuous flow to the users of Boajibu. If this flow is not met, intermittent flow can be provided to the users. In order to aid the construction of a distribution system in the absence of someone with formal engineering training, a table was created detailing water storage tank sizing based on possible source flow rates. A builder can interpolate using the source flow rate found to get the tank size from the table. However, any flow rate below 2.1 liters per second cannot be used in the table. In this case, the builder should size the tank such that it can take in the water that will be supplied overnight, as all the water will be drained during the day because the users will demand more than the spring can supply through the night. In the developing world, there is often a problem collecting enough money to fund large infrastructure projects, such as a water distribution system. Often there is only enough money to add only one or two loops to a water distribution system. It is helpful to know where these one or two loops can be most effectively placed in the system. Various possible loops were designated for the Boajibu water distribution system and the Adaptive Greedy Heuristic Loop Addition Selection Algorithm (AGHLASA) was used to rank the effectiveness of the possible loops to construct. Loop 1 which was furthest upstream was selected because it benefitted the most people for the least cost. While loops which were further downstream were found to be less effective because they would benefit fewer people. Further studies should be conducted on the water use habits of the people of Boajibu to more accurately predict the demands that will be placed on the system. Further population surveying should also be conducted to predict population change over time so that the appropriate capacity can be built into the system to accommodate future growth. The flow at the spring should be measured using a V-notch weir and the system adjusted accordingly. Future studies can be completed adjusting the loop ranking method so that two users who may be using the water system for different lengths of time are not counted the same and vulnerable users are weighted more heavily than more robust users.
Resumo:
The mean transit time (MTT) of water in a catchment gives information about storage, flow paths, sources of water and thus also about retention and release of solutes in a catchment. To our knowledge there are only a few catchment studies on the influence of vegetation cover changes on base flow MTTs. The main changes in vegetation cover in the Swiss Alps are massive shrub encroachment and forest expansion into formerly open habitats. Four small and relatively steep headwater catchments in the Swiss Alps (Ursern Valley) were investigated to relate different vegetation cover to water transit times. Time series of water stable isotopes were used to calculate MTTs. The high temporal variation of the stable isotope signals in precipitation was strongly dampened in stream base flow samples. MTTs of the four catchments were 70 to 102 weeks. The strong dampening of the stable isotope input signal as well as stream water geochemistry points to deeper flow paths and mixing of waters of different ages at the catchments' outlets. MTTs were neither related to topographic indices nor vegetation cover. The major part of the quickly infiltrating precipitation likely percolates through fractured and partially karstified deeper rock zones, which increases the control of bedrock flow paths on MTT. Snow accumulation and the timing of its melt play an important role for stable isotope dynamics during spring and early summer. We conclude that, in mountainous headwater catchments with relatively shallow soil layers, the hydrogeological and geochemical patterns (i.e. geochemistry, porosity and hydraulic conductivity of rocks) and snow dynamics influence storage, mixing and release of water in a stronger way than vegetation cover or topography do.
Resumo:
This study evaluated the use of electroshock as in alternative to traditional techniques for immobilizing and euthanizing hatchery fish. We used a commercially available electroanesthesia unit at the U.S. Fish and Wildlife Service's Carson National Fish Hatchery (Carson, Washington) to euthanize adult spring Chinook salmon Oncorhynchus tshawytscha and to son and collect gametes of fish at maturation. During euthanization by electroshock, the response of each fish was observed, Muscular and vertebral hemorrhaging wits quantified, and electrical settings were optimized accordingly. During gamete collection, fish were either electroshocked or exposed to tricaine methanesulfortate (MS-222); hemorrhaging, egg viability. egg size and quantity, and resultant fry quality were examined for each treatment group. Electroshocked fish had a higher likelihood Of injury during gamete collection than did fish exposed to MS-222. On average, each electroshocked fish had less than two hemorrhages oil both fillets examined. The size of each hemorrhage was less than 0.10% of the fillet surface. Fecundity and egg and fry quality were not affected by either immobilization method. Electroshock was a viable and efficient means of euthanizing adult spring Chinook salmon or sorting the fish and collecting their gametes. However, equipment settings must be optimized based on site-specific (e.g., water conductivity) and species-specific (e.g., fish size and seasonal state of maturation) factors.