933 resultados para L71 - Mining, Extraction, and Refining:
Resumo:
Mode of access: Internet.
Resumo:
Fiscal year coverage, 1971-1975; calendar year coverage, 1976-1980.
Resumo:
Mode of access: Internet.
Resumo:
Includes bibliographical references (p. 456-482) and index.
Resumo:
Mode of access: Internet.
Resumo:
No. 1 (Preliminary report on organization and method of investigation) published without series title or number.
Resumo:
"List of patents granted by the United States, for improvement in distillation, on stills, and refining of liquors": p. 329-335.
Resumo:
Mode of access: Internet.
Resumo:
Mode of access: Internet.
Resumo:
Includes bibliographical references.
Resumo:
Mode of access: Internet.
Resumo:
In this paper, mining dynamics is defined as the relationship between the mining rate and movement of mining operations conducted on the benches of a surface mine. This relationship describes the intensity of the pit development in space, in order to meet ore demand at the mill over time. Meeting the mill ore demand is a key factor in optimizing production scheduling in surface mines. Displacement velocity of mining operations within cutbacks, or independent pit units, is introduced in the context of long-term mine planning. Displacement velocity allows the place and time of transition of the mining operations from one independent pit unit to another to be determined as the condition for meeting the mill ore demand. An application using data from Mt Keith Nickel Operations in Western Australia is used to elaborate on the methods presented.
Resumo:
Achieving more sustainable land and water use depends on high-quality information and its improved use. In other words, better linkages are needed between science and management. Since many stakeholders with different relationships to the natural resources are inevitably involved, we suggest that collaborative learning environments and improved information management are prerequisites for integrating science and management. Case studies that deal with resource management issues are presented that illustrate the creation of collaborative learning environments through systems analyses with communities, and an integration of scientific and experiential knowledge of components of the system. This new knowledge needs to be captured and made accessible through innovative information management systems designed collaboratively with users, in forms which fit the users' 'mental models' of how their systems work. A model for linking science and resource management more effectively is suggested. This model entails systems thinking in a collaborative learning environment, and processes to help convergence of views and value systems, and make scientists and different kinds of managers aware of their interdependence. Adaptive management provides a mechanism for applying and refining scientists' and managers' knowledge. Copyright (C) 2003 John Wiley Sons, Ltd.
Resumo:
Longwall shearers usually suffer from excessive pick and pickholder consumptions and severe wear of the backplate of the clearance ring section of shearer drums. In practice, most of the drums were seen to be withdrawn from the face due to the abovementioned problems, while vane picks and their holders were intact due to the improper lacing design of the clearance ring picks. However, few underground investigations and their results on the effect of lacing arrangement of clearance picks on the service life of shearer drums have been published. Nevertheless, the pick consumption characteristics of shearer drums were not investigated in detail, since these are fewer pick consumptions with shearers when compared to roadheaders. This paper is concerned with the comprehensive in situ trials on the effect of lacing of clearance ring picks on the lifespan of shearer drums, and the pick consumption characteristics of longwall shearers at Cayirhan Coal Mine in Turkey. The lifespan of shearer drums employed with shearers in this mine increased 70 per cent, while the consumption rate of clearance ring picks decreased three fold through using an alternative lacing for clearance picks, indicating the significance of utilizing proper design techniques for clearance ring picks for the service life of shearer drums. Statistical analyses carried out, using the raw pick consumption data, implied that the clearance ring picks experienced much higher loads than vane picks, revealing that special attention must be paid to designing clearance ring picks. An average maximum consumption value of 41 was determined for clearance ring picks, with corner-cutting picks having the most replacements, while it was 35 for vane picks, on three-day based pick replacements.