842 resultados para Integrated Management
Resumo:
In asset intensive industries such as mining, oil & gas, utilities etc. most of the capital expenditure happens on acquiring engineering assets. Process of acquiring assets is called as “Procurement” or “Acquisition”. An asset procurement decision should be taken in consideration with the installation, commissioning, operational, maintenance and disposal needs of an asset or spare. However, such cross-functional collaboration and communication does not appear to happen between engineering, maintenance, warehousing and procurement functions in many asset intensive industries. Acquisition planning and execution are two distinct parts of asset acquisition process. Acquisition planning or procurement planning is responsible for determining exactly what is required to be purchased. It is important that an asset acquisition decision is the result of cross-functional decision making process. An acquisition decision leads to a formal purchase order. Most costly asset decisions occur even before they are acquired. Therefore, acquisition decision should be an outcome of an integrated planning & decision making process. Asset intensive organizations both, Government and non Government in Australia spent AUD 102.5 Billion on asset acquisition in year 2008-09. There is widespread evidence of many assets and spare not being used or utilized and in the end are written off. This clearly shows that many organizations end up buying assets or spares which were not required or non-conforming to the needs of user functions. It is due the fact that strategic and software driven procurement process do not consider all the requirements from various functions within the organization which contribute to the operation and maintenance of the asset over its life cycle. There is a lot of research done on how to implement an effective procurement process. There are numerous software solutions available for executing a procurement process. However, not much research is done on how to arrive at a cross functional procurement planning process. It is also important to link procurement planning process to procurement execution process. This research will discuss ““Acquisition Engineering Model” (AEM) framework, which aims at assisting acquisition decision making based on various criteria to satisfy cross-functional organizational requirements. Acquisition Engineering Model (AEM) will consider inputs from corporate asset management strategy, production management, maintenance management, warehousing, finance and HSE. Therefore, it is essential that the multi-criteria driven acquisition planning process is carried out and its output is fed to the asset acquisition (procurement execution) process. An effective procurement decision making framework to perform acquisition planning which considers various functional criteria will be discussed in this paper.
Resumo:
Background Significant ongoing learning needs for nurses have occurred as a direct result of the continuous introduction of technological innovations and research developments in the healthcare environment. Despite an increased worldwide emphasis on the importance of continuing education, there continues to be an absence of empirical evidence of program and session effectiveness. Few studies determine whether continuing education enhances or develops practice and the relative cost benefits of health professionals’ participation in professional development. The implications for future clinical practice and associated educational approaches to meet the needs of an increasingly diverse multigenerational and multicultural workforce are also not well documented. There is minimal research confirming that continuing education programs contribute to improved patient outcomes, nurses’ earlier detection of patient deterioration or that standards of continuing competence are maintained. Crucially, evidence-based practice is demonstrated and international quality and safety benchmarks are adhered to. An integrated clinical learning model was developed to inform ongoing education for acute care nurses. Educational strategies included the use of integrated learning approaches, interactive teaching concepts and learner-centred pedagogies. A Respiratory Skills Update education (ReSKU) program was used as the content for the educational intervention to inform surgical nurses’ clinical practice in the area of respiratory assessment. The aim of the research was to evaluate the effectiveness of implementing the ReSKU program using teaching and learning strategies, in the context of organisational utility, on improving surgical nurses’ practice in the area of respiratory assessment. The education program aimed to facilitate better awareness, knowledge and understanding of respiratory dysfunction in the postoperative clinical environment. This research was guided by the work of Forneris (2004), who developed a theoretical framework to operationalise a critical thinking process incorporating the complexities of the clinical context. The framework used educational strategies that are learner-centred and participatory. These strategies aimed to engage the clinician in dynamic thinking processes in clinical practice situations guided by coaches and educators. Methods A quasi experimental pre test, post test non–equivalent control group design was used to evaluate the impact of the ReSKU program on the clinical practice of surgical nurses. The research tested the hypothesis that participation in the ReSKU program improves the reported beliefs and attitudes of surgical nurses, increases their knowledge and reported use of respiratory assessment skills. The study was conducted in a 400 bed regional referral public hospital, the central hub of three smaller hospitals, in a health district servicing the coastal and hinterland areas north of Brisbane. The sample included 90 nurses working in the three surgical wards eligible for inclusion in the study. The experimental group consisted of 36 surgical nurses who had chosen to attend the ReSKU program and consented to be part of the study intervention group. The comparison group included the 39 surgical nurses who elected not to attend the ReSKU program, but agreed to participate in the study. Findings One of the most notable findings was that nurses choosing not to participate were older, more experienced and less well educated. The data demonstrated that there was a barrier for training which impacted on educational strategies as this mature aged cohort was less likely to take up educational opportunities. The study demonstrated statistically significant differences between groups regarding reported use of respiratory skills, three months after ReSKU program attendance. Between group data analysis indicated that the intervention group’s reported beliefs and attitudes pertaining to subscale descriptors showed statistically significant differences in three of the six subscales following attendance at the ReSKU program. These subscales included influence on nursing care, educational preparation and clinical development. Findings suggest that the use of an integrated educational model underpinned by a robust theoretical framework is a strong factor in some perceptions of the ReSKU program relating to attitudes and behaviour. There were minimal differences in knowledge between groups across time. Conclusions This study was consistent with contemporary educational approaches using multi-modal, interactive teaching strategies and a robust overarching theoretical framework to support study concepts. The construct of critical thinking in the clinical context, combined with clinical reasoning and purposeful and collective reflection, was a powerful educational strategy to enhance competency and capability in clinicians.
Resumo:
Knowledge base is one of the emerging concepts in the Knowledge Management area. As there exists no agreed- upon standard definition of a knowledge base, this paper defines a knowledge base in terms of our research of Enterprise Systems (ES). The knowledge base is defined with reference to Learning Network Theory. Using this theoretical framework, we investigate the roles of management and operational staff in organisations and how their interactions can create a better ES-knowledge base to contribute to ES success. We focus on the post- implementation phase of ES as part of the ES lifecycle. Our findings will facilitate future research directions and contribute to better understandings of how the knowledge base can be integrated and how this integration leads to Enterprise System success.
Resumo:
Motivation is a major driver of project performance. Despite team member ability to deliver successful project outcomes if they are not positively motivated to pursue joint project goals, then performance will be constrained. One approach to improving the motivation of project organizations is by offering a financial reward for the achievement of set performance standards above a minimum required level. However, little investigation has been undertaken into the features of successful incentive systems as a part of an overall delivery strategy. With input from organizational management literature, and drawing on the literature covering psychological and economic theories of motivation, this paper presents an integrated framework that can be used by project organizations to assess the impact of financial reward systems on motivation in construction projects. The integrated framework offers four motivation indicators which reflect key theoretical concepts across both psychological and economic disciplines. The indicators are: (1) Goal Commitment, (2) Distributive Justice, (3) Procedural Justice, and (4) Reciprocity. The paper also interprets the integrated framework against the results of a successful Australian social infrastructure project case study and identifies key learning’s for project organizations to consider when designing financial reward systems. Case study results suggest that motivation directed towards the achievement of incentive goals is influenced not only by the value placed on the financial reward for commercial benefit, but also driven by the strength of the project initiatives that encourage just and fair dealings, supporting the establishment of trust and positive reciprocal behavior across a project team. The strength of the project relationships was found to be influenced by how attractive the achievement of the goal is to the incentive recipient and how likely they were to push for the achievement of the goal. Interestingly, findings also suggested that contractor motivation is also influenced by the fairness of the performance measurement process and their perception of the trustworthiness and transparency of their client. These findings provide the basis for future research on the impact of financial reward systems on motivation in construction projects. It is anticipated that such research will shed new light on this complex topic and further define how reward systems should be designed to promote project team motivation. Due to the unique nature of construction projects with high levels of task complexity and interdependence, results are expected to vary in comparison to previous studies based on individuals or single-entity organizations.
Resumo:
Humankind has been dealing with all kinds of disasters since the dawn of time. The risk and impact of disasters producing mass casualties worldwide is increasing, due partly to global warming as well as to increased population growth, increased density and the aging population. China, as a country with a large population, vast territory, and complex climatic and geographical conditions, has been plagued by all kinds of disasters. Disaster health management has traditionally been a relatively arcane discipline within public health. However, SARS, Avian Influenza, and earthquakes and floods, along with the need to be better prepared for the Olympic Games in China has brought disasters, their management and their potential for large scale health consequences on populations to the attention of the public, the government and the international community alike. As a result significant improvements were made to the disaster management policy framework, as well as changes to systems and structures to incorporate an improved disaster management focus. This involved the upgrade of the Centres for Disease Control and Prevention (CDC) throughout China to monitor and better control the health consequences particularly of infectious disease outbreaks. However, as can be seen in the Southern China Snow Storm and Wenchuan Earthquake in 2008, there remains a lack of integrated disaster management and efficient medical rescue, which has been costly in terms of economics and health for China. In the context of a very large and complex country, there is a need to better understand whether these changes have resulted in effective management of the health impacts of such incidents. To date, the health consequences of disasters, particularly in China, have not been a major focus of study. The main aim of this study is to analyse and evaluate disaster health management policy in China and in particular, its ability to effectively manage the health consequences of disasters. Flood has been selected for this study as it is a common and significant disaster type in China and throughout the world. This information will then be used to guide conceptual understanding of the health consequences of floods. A secondary aim of the study is to compare disaster health management in China and Australia as these countries differ in their length of experience in having a formalised policy response. The final aim of the study is to determine the extent to which Walt and Gilson’s (1994) model of policy explains how disaster management policy in China was developed and implemented after SARS in 2003 to the present day. This study has utilised a case study methodology. A document analysis and literature search of Chinese and English sources was undertaken to analyse and produce a chronology of disaster health management policy in China. Additionally, three detailed case studies of flood health management in China were undertaken along with three case studies in Australia in order to examine the policy response and any health consequences stemming from the floods. A total of 30 key international disaster health management experts were surveyed to identify fundamental elements and principles of a successful policy framework for disaster health management. Key policy ingredients were identified from the literature, the case-studies and the survey of experts. Walt and Gilson (1994)’s policy model that focuses on the actors, content, context and process of policy was found to be a useful model for analysing disaster health management policy development and implementation in China. This thesis is divided into four parts. Part 1 is a brief overview of the issues and context to set the scene. Part 2 examines the conceptual and operational context including the international literature, government documents and the operational environment for disaster health management in China. Part 3 examines primary sources of information to inform the analysis. This involves two key studies: • A comparative analysis of the management of floods in China and Australia • A survey of international experts in the field of disaster management so as to inform the evaluation of the policy framework in existence in China and the criteria upon which the expression of that policy could be evaluated Part 4 describes the key outcomes of this research which include: • A conceptual framework for describing the health consequences of floods • A conceptual framework for disaster health management • An evaluation of the disaster health management policy and its implementation in China. The research outcomes clearly identified that the most significant improvements are to be derived from improvements in the generic management of disasters, rather than the health aspects alone. Thus, the key findings and recommendations tend to focus on generic issues. The key findings of this research include the following: • The health consequences of floods may be described in terms of time as ‘immediate’, ‘medium term’ and ‘long term’ and also in relation to causation as ‘direct’ and ‘indirect’ consequences of the flood. These two aspects form a matrix which in turn guides management responses. • Disaster health management in China requires a more comprehensive response throughout the cycle of prevention, preparedness, response and recovery but it also requires a more concentrated effort on policy implementation to ensure the translation of the policy framework into effective incident management. • The policy framework in China is largely of international standard with a sound legislative base. In addition the development of the Centres for Disease Control and Prevention has provided the basis for a systematic approach to health consequence management. However, the key weaknesses in the current system include: o The lack of a key central structure to provide the infrastructure with vital support for policy development, implementation and evaluation. o The lack of well-prepared local response teams similar to local government based volunteer groups in Australia. • The system lacks structures to coordinate government action at the local level. The result of this is a poorly coordinated local response and lack of clarity regarding the point at which escalation of the response to higher levels of government is advisable. These result in higher levels of risk and negative health impacts. The key recommendations arising from this study are: 1. Disaster health management policy in China should be enhanced by incorporating disaster management considerations into policy development, and by requiring a disaster management risk analysis and disaster management impact statement for development proposals. 2. China should transform existing organizations to establish a central organisation similar to the Federal Emergency Management Agency (FEMA) in the USA or the Emergency Management Australia (EMA) in Australia. This organization would be responsible for leading nationwide preparedness through planning, standards development, education and incident evaluation and to provide operational support to the national and local government bodies in the event of a major incident. 3. China should review national and local plans to reflect consistency in planning, and to emphasize the advantages of the integrated planning process. 4. Enhance community resilience through community education and the development of a local volunteer organization. China should develop a national strategy which sets direction and standards in regard to education and training, and requires system testing through exercises. Other initiatives may include the development of a local volunteer capability with appropriate training to assist professional response agencies such as police and fire services in a major incident. An existing organisation such as the Communist Party may be an appropriate structure to provide this response in a cost effective manner. 5. Continue development of professional emergency services, particularly ambulance, to ensure an effective infrastructure is in place to support the emergency response in disasters. 6. Funding for disaster health management should be enhanced, not only from government, but also from other sources such as donations and insurance. It is necessary to provide a more transparent mechanism to ensure the funding is disseminated according to the needs of the people affected. 7. Emphasis should be placed on prevention and preparedness, especially on effective disaster warnings. 8. China should develop local disaster health management infrastructure utilising existing resources wherever possible. Strategies for enhancing local infrastructure could include the identification of local resources (including military resources) which could be made available to support disaster responses. It should develop operational procedures to access those resources. Implementation of these recommendations should better position China to reduce the significant health consequences experienced each year from major incidents such as floods and to provide an increased level of confidence to the community about the country’s capacity to manage such events.
Resumo:
This paper investigates the use of visual artifacts to represent a complex adaptive system (CAS). The integrated master schedule (IMS) is one of those visuals widely used in complex projects for scheduling, budgeting, and project management. In this paper, we discuss how the IMS outperforms the traditional timelines and acts as a ‘multi-level and poly-temporal boundary object’ that visually represents the CAS. We report the findings of a case study project on the way the IMS mapped interactions, interdependencies, constraints and fractal patterns in a complex project. Finally, we discuss how the IMS was utilised as a complex boundary object by eliciting commitment and development of shared mental models, and facilitating negotiation through the layers of multiple interpretations from stakeholders.
Resumo:
This paper presents some theoretical perspectives that might inform the design and development of information and communications technology (ICT) tools to support integrated (in-session) reflection and deep learning during e-learning. The role of why questioning provides the focus of discussion and is informed by the literature on critical thinking, sense-making, and reflective practice, as well as recent developments in knowledge management, computational linguistics and automated question generation. It is argued that there exists enormous scope for the development of ICT scaffolding targeted at supporting reflective practice during e-learning. The first generations of e-Portfolio tools provide some evidence for the significance of the benefits of integrating reflection into the design of ICT systems; however, following the review of a number of such systems, as well as a range of ICT applications and services designed to support e-learning, it is argued that the scope of implementation is limited.
Resumo:
The increasing stock of aging office buildings will see a significant growth in retrofitting projects in Australian capital cities. Stakeholders of refitting works will also need to take on the sustainability challenge and realize tangible outcomes through project delivery. Traditionally, decision making for aged buildings, when facing the alternatives, is typically economically driven and on ad hoc basis. This leads to the tendency to either delay refitting for as long as possible thus causing building conditions to deteriorate, or simply demolish and rebuild with unjust financial burden. The technologies involved are often limited to typical strip-clean and repartition with dry walls and office cubicles. Changing business operational patterns, the efficiency of office space, and the demand on improved workplace environment, will need more innovative and intelligent approaches to refurbishing office buildings. For example, such projects may need to respond to political, social, environmental and financial implications. There is a need for the total consideration of buildings structural assessment, modeling of operating and maintenance costs, new architectural and engineering designs that maximise the utility of the existing structure and resulting productivity improvement, specific construction management procedures including procurement methods, work flow and scheduling and occupational health and safety. Recycling potential and conformance to codes may be other major issues. This paper introduces examples of Australian research projects which provided a more holistic approach to the decision making of refurbishing office space, using appropriate building technologies and products, assessment of residual service life, floor space optimisation and project procurement in order to bring about sustainable outcomes. The paper also discusses a specific case study on critical factors that influence key building components for these projects and issues for integrated decision support when dealing with the refurbishment, and indeed the “re-life”, of office buildings.
Resumo:
A novel m-ary tree based approach is presented to solve asset management decisions which are combinatorial in nature. The approach introduces a new dynamic constraint based control mechanism which is capable of excluding infeasible solutions from the solution space. The approach also provides a solution to the challenges with ordering of assets decisions.
Resumo:
This paper presents an innovative prognostics model based on health state probability estimation embedded in the closed loop diagnostic and prognostic system. To employ an appropriate classifier for health state probability estimation in the proposed prognostic model, the comparative intelligent diagnostic tests were conducted using five different classifiers applied to the progressive fault levels of three faults in HP-LNG pump. Two sets of impeller-rubbing data were employed for the prediction of pump remnant life based on estimation of discrete health state probability using an outstanding capability of SVM and a feature selection technique. The results obtained were very encouraging and showed that the proposed prognosis system has the potential to be used as an estimation tool for machine remnant life prediction in real life industrial applications.
Resumo:
Performance based planning is a form of planning regulation that is not well understood and the theoretical advantages of this type of planning are rarely achieved in practice. Normatively, this type of regulation relies on performance standards that are quantifiable and technically based which are designed to manage the effects of development, where performance standards provide certainty in respect of the level of performance and the means of achievement is flexible. Few empirical studies have attempted to examine how performance based planning has been conceptualised and implemented in practice. Existing literature is predominately anecdotal and consultant based (Baker et al. 2006) and has not sought to quantitatively examine how land use has been managed or determine how context influences implementation. The Integrated Planning Act 1997 (IPA) operated as Queensland’s principal planning legislation between March 1998 and December 2009. The IPA prevented Local Governments from prohibiting development or use and the term zone was absent from the legislation. While the IPA did not use the term performance based planning, the system is widely considered to be performance based in practice (e.g. Baker et al. 2006; Steele 2009a, 2009b). However, the degree to which the IPA and the planning system in Queensland is performance based is debated (e.g. Yearbury 1998; England 2004). Four research questions guided the research framework using Queensland as the case study. The questions sought to: determine if there is a common understanding of performance based planning; identify how performance based planning was expressed under the IPA; understand how performance based planning was implemented in plans; and explore the experiences of participants in the planning system. The research developed a performance adoption spectrum. The spectrum describes how performance based planning is implemented, ranging between pure and hybrid interpretations. An ex-post evaluation of seventeen IPA plans sought to determine plan performativity within the conceptual spectrum. Land use was examined from the procedural dimension of performance (Assessment Tables) and the substantive dimension of performance (Codes). A documentary analysis and forty one interviews supplemented the research. The analytical framework considered how context influenced performance based planning, including whether: the location of the local government affected land use management techniques; temporal variation in implementation exists; plan-making guidelines affected implementation; different perceptions of the concept exist; this type of planning applies to a range of spatial scales. Outcomes were viewed as the medium for determining the acceptability of development in Queensland, a significant departure from pure approaches found in the United States. Interviews highlighted the absence of plan-making direction in the IPA, which contributed to the confusion about the intended direction of the planning system and the myth that the IPA would guarantee a performance based system. A hybridised form of performance based planning evolved in Queensland which was dependent on prescriptive land use zones and specification of land use type, with some local governments going to extreme lengths to discourage certain activities in a predetermined manner. Context had varying degrees of influence on plan-making methods. Decision-making was found to be inconsistent and the system created a range of unforeseen consequences including difficulties associated with land valuation, increased development speculation, and the role of planners in court was found to be less critical than in the previous planning system.
Resumo:
The management of risks in business processes has been a subject of active research in the past few years. Many benefits can potentially be obtained by integrating the two traditionally-separated fields of risk management and business process management, including the ability to minimize risks in business processes (by design) and to mitigate risks at run time. In the past few years, an increasing amount of research aimed at delivering such an integrated system has been proposed. However, these research efforts vary in terms of their scope, goals, and functionality. Through systematic collection and evaluation of relevant literature, this paper compares and classifies current approaches in the area of risk-aware business process management in order to identify and explain relevant research gaps. The process through which relevant literature is collected, filtered, and evaluated is also detailed.
Resumo:
With the development of enterprise informatisation, Product Lifecycle Management (PLM) systems have been widely deployed and applied in enterprises. This paper analyzes the requirement that conducting version operations on business objects as specified in process models should be compliant with the versioning policies imposed by product lifecycles. This leads to the introduction of the concept of versioning compliance, and the approach of compliance checking that we proposed in our earlier work, which comprises both syntactical compatibility and behavioural compatibility checking. The paper then focuses on the tool implementation for providing automated support to the versioning compliance checking. An empirical evaluation of the tool was also performed with industrial partners using the well-known questionnaire-based method. The evaluation and feedback from practitioners further evidence the practical significance of this research question in the PLM field and demonstrate that the proposed solution with its automated tool support possesses a high application potential.
Resumo:
This study proceeds from a central interest in the importance of systematically evaluating operational large-scale integrated information systems (IS) in organisations. The study is conducted within the IS-Impact Research Track at Queensland University of Technology (QUT). The goal of the IS-Impact Track is, "to develop the most widely employed model for benchmarking information systems in organizations for the joint benefit of both research and practice" (Gable et al, 2009). The track espouses programmatic research having the principles of incrementalism, tenacity, holism and generalisability through replication and extension research strategies. Track efforts have yielded the bicameral IS-Impact measurement model; the ‘impact’ half includes Organisational-Impact and Individual-Impact dimensions; the ‘quality’ half includes System-Quality and Information-Quality dimensions. Akin to Gregor’s (2006) analytic theory, the ISImpact model is conceptualised as a formative, multidimensional index and is defined as "a measure at a point in time, of the stream of net benefits from the IS, to date and anticipated, as perceived by all key-user-groups" (Gable et al., 2008, p: 381). The study adopts the IS-Impact model (Gable, et al., 2008) as its core theory base. Prior work within the IS-Impact track has been consciously constrained to Financial IS for their homogeneity. This study adopts a context-extension strategy (Berthon et al., 2002) with the aim "to further validate and extend the IS-Impact measurement model in a new context - i.e. a different IS - Human Resources (HR)". The overarching research question is: "How can the impacts of large-scale integrated HR applications be effectively and efficiently benchmarked?" This managerial question (Cooper & Emory, 1995) decomposes into two more specific research questions – In the new HR context: (RQ1): "Is the IS-Impact model complete?" (RQ2): "Is the ISImpact model valid as a 1st-order formative, 2nd-order formative multidimensional construct?" The study adhered to the two-phase approach of Gable et al. (2008) to hypothesise and validate a measurement model. The initial ‘exploratory phase’ employed a zero base qualitative approach to re-instantiating the IS-Impact model in the HR context. The subsequent ‘confirmatory phase’ sought to validate the resultant hypothesised measurement model against newly gathered quantitative data. The unit of analysis for the study is the application, ‘ALESCO’, an integrated large-scale HR application implemented at Queensland University of Technology (QUT), a large Australian university (with approximately 40,000 students and 5000 staff). Target respondents of both study phases were ALESCO key-user-groups: strategic users, management users, operational users and technical users, who directly use ALESCO or its outputs. An open-ended, qualitative survey was employed in the exploratory phase, with the objective of exploring the completeness and applicability of the IS-Impact model’s dimensions and measures in the new context, and to conceptualise any resultant model changes to be operationalised in the confirmatory phase. Responses from 134 ALESCO users to the main survey question, "What do you consider have been the impacts of the ALESCO (HR) system in your division/department since its implementation?" were decomposed into 425 ‘impact citations.’ Citation mapping using a deductive (top-down) content analysis approach instantiated all dimensions and measures of the IS-Impact model, evidencing its content validity in the new context. Seeking to probe additional (perhaps negative) impacts; the survey included the additional open question "In your opinion, what can be done better to improve the ALESCO (HR) system?" Responses to this question decomposed into a further 107 citations which in the main did not map to IS-Impact, but rather coalesced around the concept of IS-Support. Deductively drawing from relevant literature, and working inductively from the unmapped citations, the new ‘IS-Support’ construct, including the four formative dimensions (i) training, (ii) documentation, (iii) assistance, and (iv) authorisation (each having reflective measures), was defined as: "a measure at a point in time, of the support, the [HR] information system key-user groups receive to increase their capabilities in utilising the system." Thus, a further goal of the study became validation of the IS-Support construct, suggesting the research question (RQ3): "Is IS-Support valid as a 1st-order reflective, 2nd-order formative multidimensional construct?" With the aim of validating IS-Impact within its nomological net (identification through structural relations), as in prior work, Satisfaction was hypothesised as its immediate consequence. The IS-Support construct having derived from a question intended to probe IS-Impacts, too was hypothesised as antecedent to Satisfaction, thereby suggesting the research question (RQ4): "What is the relative contribution of IS-Impact and IS-Support to Satisfaction?" With the goal of testing the above research questions, IS-Impact, IS-Support and Satisfaction were operationalised in a quantitative survey instrument. Partial least squares (PLS) structural equation modelling employing 221 valid responses largely evidenced the validity of the commencing IS-Impact model in the HR context. ISSupport too was validated as operationalised (including 11 reflective measures of its 4 formative dimensions). IS-Support alone explained 36% of Satisfaction; IS-Impact alone 70%; in combination both explaining 71% with virtually all influence of ISSupport subsumed by IS-Impact. Key study contributions to research include: (1) validation of IS-Impact in the HR context, (2) validation of a newly conceptualised IS-Support construct as important antecedent of Satisfaction, and (3) validation of the redundancy of IS-Support when gauging IS-Impact. The study also makes valuable contributions to practice, the research track and the sponsoring organisation.