945 resultados para Infrastructure Projects
Resumo:
Megaprojects are described as large, complex and expensive construction projects. Recent studies have shown that megaprojects often result in cost overruns, time extensions and undesired outcomes. Regardless, megaprojects are common, particularly in developing countries, as they are a trigger for social and economic development (Li et al., 2010). Since 2007, the Government of Ecuador has begun an unprecedent investment in infrastructure. Through the National Water Secretary, the government has 16 projects in agenda accounting for over $ 3 billion, with 6 projects currently under construction. These projects are considered flagship infrastructure in the endeavour to enhance the country´s productivity.The Bulubulu-Naranjal-Cañar project, a $406 million multi-purpose hydraulic project for irrigation and flood control, consists of over 1,000 activities and was proposed to be completed by 2015. This novel project for Ecuador, presented as a case study, represents a challenge for project management and financing. The purpose of this preliminary study is to provide an insight to megaproject management in Ecuador, and propose improvements to megaproject management through optimization of stochastic project schedules.
Resumo:
This thesis investigates the Value Management processes used by construction project clients that effects project team involvement in VM workshops during the design stage of the projects. It is based on five case studies of the Malaysian international airport construction project packages. The focus of the research is on how issues related to infrastructure design that can improve construction processes on-site are being identified, analysed and resolved through multi-disciplinary team participation. The degrees of interaction, diversity of visualisation aids, certain cultural dimensions and the system thinking approach are found to have significant influence in maximizing participation among project team members during the entire VM workshop process.
Resumo:
Annually, several million tonnes of waste are produced from reworks, demolition, and use of substandard materials. Building Information Modelling (BIM), a digital representation of facilities and their constituent data, is a viable means of addressing some concerns about the impacts of these processes. BIM functionalities can be extended and combined with rich building information from specifications and product libraries, for efficient, streamlined design and construction. This paper conceptualises a framework for BIM-knowledge transfer from advanced economies for adaptation and use in urban development works in developing nations using the Sydney Down Under and Lagos Eko Atlantic projects as reference points. We present a scenario that highlights BIM-based lifecycle planning/specifications as agents of sustainable construction (in terms of cost and time) crucial to the quality of as-built data from early on in city development. We show how, through the use of BIM, city planners in developing nations can avoid high, retrospective (and sometimes wasteful) maintenance costs and leapfrog infrastructure management standards of advanced economies. Finally, this paper illustrates how BIM can address concerns about economic sustainability during city development in developing countries by enriching model objects with specification information sourced from a product library.
Resumo:
It is reasonable to expect that Islamic project financing may be a suitable option of infrastructure financing in Indonesia. This research explored the conditions necessary for the implementation of Islamic project financing for Indonesian infrastructure development. It is important that all infrastructure project stakeholders understand the concept comprehensively. This study identified reforms through which the government could more directly support the implementation of Islamic project financing. This research has led to the realisation that Islamic project financing can be implemented in all sectors, in both public and private sector domains, and across Muslim and non-Muslim communities.
Resumo:
Strategic capability development refers to the renewal of the organisational capabilities which are sources of competitive advantage. The aim of this paper is to examine how strategic capability and competitive advantage build up over time. Recent literature points to the integration of dynamic capability and ambidexterity perspectives in explaining organisational capability development. Literature analysis reveals the role of knowledge integration and product innovation in integrating dynamic capability and ambidexterity. However, little attention has yet been paid to knowledge integration within innovation projects as a context for capability development. Accordingly, this paper aims to develop a conceptual framework for strategic capability development focusing on the role of knowledge integration within product innovation projects. This framework contributes to identifying and emphasising the role of micro processes in capability renewal which in turn enhances our understanding of strategic capability development.
Resumo:
Internationally, the delivery of vocational education and training is being challenged by increasing skills shortages in certain industries and/or rapidly changing skill requirements. To respond to this challenge, rigid and centralised state bureaucracies are increasingly adopting partnerships between schools and industry as a strategy to encourage school-to-work transition programmes to address the local labour market demand. Drawing on experiences in Australia, this paper reports on a case study of government led partnerships between schools and industry. The Queensland Gateway to industry schools initiative currently involves over 120 schools. The study investigated how two commonly used partnership principles were understood by the Gateway to industry partners. Twelve school–industry partnerships from four industry sectors were analysed in terms of the principles of ‘efficiency’ and ‘effectiveness’ derived from the public–private partnership literature. The study found that some evidence of partnership activities associated with efficiency and effectiveness may be assigned to Gateway schools projects. However, little evidence was found that the above underlying principles were addressed systematically. Some of these partnerships were tenuously facilitated by individuals who had limited infrastructure or strategic support. Implications are that industry–school partnership stakeholders would benefit from applying partnership principles regarding implementation and management to ensure the sustainability of partnerships.
Resumo:
Until the 1970s mining leases were issued by state governments subject to conditions that companies build or substantially finance local community infrastructure, including housing, streets, transport, schools, hospitals and recreation facilities. Townships and communities went hand in hand with mining development. However, in the past thirty years mining companies have moved progressively to an expeditionary strategy for natural resources extraction - operating a continuous production cycle of 12 hour shifts - increasingly reliant on non-resident, fly-in, fly-out or drive-in, drive-out (FIFO/DIDO) workers who typically work block rosters, reside in work camps adjacent to existing communities and travel large distances from their homes. This paper presents the key findings of our survey into the social impacts of this kind of mining development in Qld. Based on the results we argue that the social license to develop new mining projects is strong for projects requiring a 25% or less non-resident workforce, diminishes significantly thereafter and is very weak for projects planning to recruit a non-resident workforce in excess of 75%. This finding is significant because there are at least 67 new mining projects undergoing social impact assessment in Queensland, and many it appears are planning to hire significant proportions of non-resident workers. The paper considers the policy implications of this growing social justice issue concluding there is a clear need for national leadership in formulating a national policy framework for guiding socially responsible and sustainable mining development into the next millennium.
Resumo:
Law schools in Australia and the United Kingdom are increasingly adopting clinical legal education (CLE) as an important part of their curriculum. Models of CLE are emerging in those jurisdictions which draw on local experience and the strong tradition of CLE and community lawyering in the United States. The purpose of this article is to examine the pedagogy that underlies CLE and to consider how it can be applied to newly emerging models of CLE. In particular, it will evaluate a community project legal clinic in which students work on social justice projects in partnership with a range of community organisations, not limited to legal centres, with a view to determining whether pedagogical goals are being met in the way that the course is being delivered. This article argues that community project legal clinics can result in positive student learning outcomes in relation to the development of a pro bono ethos and commitment to social justice, lawyering skills including client communication, and the development of a positive professional legal identity. Part II of the article provides a brief overview of the history of CLE in Australia, the United Kingdom and the United States, noting the trend towards the development of community lawyering clinics. Part III examines the benefits of community lawyering clinics focusing on the benefits for student learning and the service-learning pedagogy applied in community lawyering clinics in the United States. Finally, part IV looks at a case study of a new community project clinic in Australia that draws upon the service-learning pedagogy of community lawyering CLE. In the community project clinic, students engage in service-learning through undertaking projects with not-for-profit community organisations. Community partners identify relevant issues and needs, and the students work in interdisciplinary teams to address these. Law students working in these teams are often exposed to a broader social problem or issue than they would experience in a traditional ‘in-person’ legal clinic. Initial evaluation suggests that this model for community clinics in law schools assists students to develop lawyering skills and a positive legal identity including awareness of and support for pro bono legal work and a sense of belonging in the legal profession.
Resumo:
In this research Agency Theory and Stewardship Theory are used to analyse the relative performance of different forms of privitisation of water infrastructure and in doing so enriches understanding of previously underdeveloped aspects of both theories. The prior Agency Theory literature had established assumptions about the behaviour of principals and agents in contracts and these were found not to be correct in the context of contracts between modern government and private organisations. Agency theory was extended to include steward-like behaviour of an agent and Stewardship Theory was developed by the identification of factors within the contractual relationship which promote the sense of responsibility to the principal. The alliance, joint venture and Build Own Operate Transfer (BOOT) forms of privatisation were found to achieve stewardship of the infrastructure.
Resumo:
Developer paid fees or charges are a commonly used mechanism for local governments to pay for new infrastructure. However, property developers claim that these costs are merely passed on to home buyers, with adverse effects to housing affordability. Despite numerous government reports and many years of industry advocacy, there remains no empirical evidence in Australia to confirm or quantify this passing on effect to home buyers. Hence there remains no data from which governments can base policy decision on, and the debate continues. This paper examines the question of the impact of infrastructure charges on housing affordability in Australia. It presents the findings of a hedonic house price model that provides the first empirical evidence that infrastructure charges do increase house prices in Australia. This research is consistent with international findings, that support the proposition that developer paid infrastructure charges are passed on to home buyers and are a significant contributor to increasing house prices and reduced housing affordability.
Resumo:
Based on an investigation of 106 projects involving the use of building information modelling (BIM), this paper examines current BIM practices in China, and assesses how various practices alter their effectiveness. The results reveal that in current practice BIM is principally employed as a visualization tool, and how it is implemented is significantly associated with project characteristics. BIM use in the majority of the surveyed projects is seen to have positive outcomes, with the benefits of improved task effectiveness being more substantial than those related to efficiency improvement. The results also provide evidence that project characteristics significantly influence the success of BIM use; however, more substantial contributing factors to BIM effectiveness are the extent of integrated use and client/owner support. While indicating that current BIM practices involve both technological and organizational problems, the findings also provide insights into how the potential for BIM could be better exploited within the industry.
Resumo:
Office building retrofit is a sector being highlighted in Australia because of the mature office building market characterised by a large proportion of ageing properties. The increasing number of office building retrofit projects strengthens the need for waste management. Retrofit projects possess unique characteristics in comparison to traditional demolition and new builds such as partial operation of buildings, constrained site spaces and limited access to as-build information. Waste management activities in retrofit projects can be influenced by issues that are different from traditional construction and demolition projects. However, previous research on building retrofit projects has not provided an understanding of the critical issues affecting waste management. This research identifies the critical factors which influence the management of waste in office building retrofit projects through a literature study and a questionnaire survey to industry practitioners. Statistical analysis on a range of potential waste issues reveals the critical factors, as agreed upon by survey respondents in consideration of their different professional responsibilities and work natures. The factors are grouped into five dimensions, comprising industry culture, organisational support and incentive, existing building information, design, and project delivery process. The discussions of the dimensions indicate that the waste management factors of office building retrofit projects are further intensified compared to those for general demolition and construction because retrofit projects involve existing buildings which are partially operating with constrained work space and limited building information. Recommendations for improving waste management in office building retrofit projects are generalised such as waste planning, auditing and assessment in the planning and designing stage, collaboration and coordination of various stakeholders and different specialists, optimised building surveying and BIM technologies for waste analysis, and new design strategies for waste prevention.
Resumo:
Our research examined how projects can draw together the fields of human resource management (HRM) and risk management (RM) to consider workforce-related risks on projects; particularly those with a large contingent workforce. It is argued that RM frameworks could be enhanced by a more comprehensive understanding of the specific potential non-technical “people risks” in projects. The study focussed on the Oil and Gas industry and undertook interviews with experts in the field. The findings are considered within the framework of key HRM areas; Management Practices, General Employment Practices, Staffing, HR Development, and Compensation and Benefits, along with Project Completion. Drawing together RM and HRM in a project environment, our research provides a unique opportunity to identify critical workforce-related risks. Such identification is the first step towards a more comprehensive approach to risk assessment and planning for mitigation of such risks in projects.
Resumo:
Contemporary cities no longer offer the same types of permanent environments that we planned for in the latter part of the twentieth century. Our public spaces are increasingly temporary, transient, and ephemeral. The theories, principles and tactics with which we designed these spaces in the past are no longer appropriate. We need a new theory for understanding the creation, use, and reuse of temporary public space. Moe than a theory, we need new architectural tactics or strategies that can be reliably employed to create successful temporary public spaces. This paper will present ongoing research that starts that process through critical review and technical analysis of existing and historic temporary public spaces. Through the analysis of a number of public spaces, that were either designed for temporary use or became temporary through changing social conditions, this research identifies the tactics and heuristics used in such projects. These tactics and heuristics are then analysed to extract some broader principles for the design of temporary public space. The theories of time related building layers, a model of environmental sustainability, and the recycling of social meaning, are all explored. The paper will go on to identify a number of key questions that need to be explored and addressed by a theory for such developments: How can we retain social meaning in the fabric of the city and its public spaces while we disassemble it and recycle it into new purposes? What role will preservation have in the rapidly changing future; will exemplary temporary spaces be preserved and thereby become no longer temporary? Does the environmental advantage of recycling materials, components and spaces outweigh the removal or social loss of temporary public space? This research starts to identify the knowledge gaps and proposes a number of strategies for making public space in the age of temporary, recyclable, and repurposing of our urban infrastructure; a way of creating lighter, cheaper, quicker, and temporary interventions.