754 resultados para Indian Construction Industry


Relevância:

80.00% 80.00%

Publicador:

Resumo:

This paper describes and analyses the procurement processes employed in delivering the Sydney Olympic Stadium – arguably the most significant stadia project in the region today. This current high profile project is discussed in terms of a case study into the procurement processes used. Interviews, personal site visits and questionnaires were used to obtain information on the procurement processes used and comments on their application to the project. The alternative procurement process used on this project—Design and Construction within a Build, Own, Operate and Transfer (BOOT) project—is likely to impact on the construction industry as a whole. Already other projects and sectors are following this lead. Based on a series of on-site interviews and questionnaires, a series of benefits and drawbacks to this procurement strategy are provided.The Olympic Stadium project has also been further analysed during construction through a Degree of Interaction framework to determine anticipated project success. This analysis investigates project interaction and user satisfaction to provide a comparable rating. A series of questionnaires were used to collect data to calculate the Degree of Interaction and User Satisfaction ratings.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This paper discusses a current research project building new understandings and knowledge relevant to R&D funding strategies in Australia. Building on a retrospective analysis of R&D trends and industry outcomes, an industry roadmap will be developed to inform R&D policies more attuned to future industry needs to improve research investment effectiveness. The project will also include analysis of research team formation and management (involving end users from public and private sectors together with research and knowledge institutions), and dissemination of outcomes and uptake in the Australian building and construction industry. The project will build on previous research extending open innovation system theory and network analysis and procurement, focused on R&D. Through the application of dynamic capabilities and strategic foresighting theory, an industry roadmap for future research investment will be developed, providing a stronger foundation for more targeted policy recommendations. This research will contribute to more effective construction processes in the future through more targeted research funding and more effective research partnerships between industry and researchers.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The Acton Peninsula project alliance is the first project alliance in building construction in the world. The project alliance is set out to achieve the best possible outcome for the project with all participants in the alliance sharing both risks and rewards. The construction of the National Museum of Australia and the Australian Institute of Aboriginal and Torres Strait Islander Studies, on Acton Peninsula in Canberra, will be a significant Australian architectural and construction achievement. The design and construction project team is committed to achieve outstanding results in all aspects of the design, construction and delivery of this significant national project. Innovation and creativity are valued, and outstanding performance will be rewarded.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This paper describes the background and methodology developed and employed in undertaking research developing a Knowledge Management Strategy for a key construction focused government agency. This paper reviews this methodology and examines a likely Knowledge Management Strategy. Two central objectives structure this Case Study: 1. Identify categories of important information generated by the Building Division, Queensland Department of Public Works in its service delivery to internal and external stake-holders, and 2. Formulate an appropriate and targeted Knowledge Management Strategy to meet the needs of the Queensland Building Capital Works program. The structure of this paper includes: *Description of the Queensland construction industry setting *Review the relevant literature *Design an appropriate research methodology *Analyse results *Formulate conclusions, contributions and implications of the targeted strategy.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This paper presents an explanation of why the reuse of building components after demolition or deconstruction is critical to the future of the construction industry. An examination of the historical cause and response to climate change sets the scene as to why governance is becoming increasingly focused on the built environment as a mechanism to controlling waste generation associated with the process of demolition, construction and operation. Through an annotated description to the evolving design and construction methodology of a range of timber dwellings (typically 'Queenslanders' during the eras of 1880-1900, 1900-1920 & 1920-1940) the paper offers an evaluation to the variety of materials, which can be used advantageously by those wishing to 'regenerate' a Queenslander. This analysis of 'regeneration' details the constraints when considering relocation and/ or reuse by adaption including deconstruction of building components against the legislative framework requirements of the Queensland Building Act 1975 and the Queensland Sustainable Planning Act 2009, with a specific examination to those of the Building Codes of Australia. The paper concludes with a discussion of these constraints, their impacts on 'regeneration' and the need for further research to seek greater understanding of the practicalities and drivers of relocation, adaptive and building components suitability for reuse after deconstruction.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Quality, as well as project success, in construction projects should be capable of being regarded as the fulfillment of expectation of those contributors and stakeholders involved in such projects. Although a significant amount of quality practices have been introduced within the industry, establishment and attainment of reasonable levels of quality internationally in construction projects continues to be an ongoing problem. To date, some investigation into the introduction and improvement of quality practices and stakeholder management in the construction industry has been accomplished independently, but so far no major studies have been completed that examine comprehensively how quality management practices that particularly concentrate on the stakeholders’ perspective of quality can be used to contribute to final project quality outcomes. This paper aims to examine the process for development of a framework for better involvement of stakeholders in quality planning and practices and subsequently to contribute to higher quality outcomes within construction projects. Through extensive literature review it highlights various perceptions of quality, categorizes quality issues with particular focus on benefits and shortcomings and also examines stakeholders’ viewpoint of project quality in order to promote the improvement of outcomes throughout a project’s lifecycle. It proposes a set of arranged information as a basis for development of prospective framework which ultimately aims to improve project quality outcomes. The subsequent framework that will be developed from this research will provide project managers and owners with the required information and strategic direction to achieve their own and their stakeholders’ targets for implementation of quality practices and achievement of high quality outcomes on their future projects.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Research found that today’s organisations are increasingly aware of the potential barriers and perceived challenges associated with the successful delivery of change — including cultural and sub-cultural indifferences; financial constraints; restricted timelines; insufficient senior management support; fragmented key stakeholder commitment; and inadequate training. The delivery and application of Innovative Change (see glossary) within a construction industry organisation tends to require a certain level of ‘readiness’. This readiness is the combination of an organisation’s ability to part from undertakings that may be old, traditional, or inefficient; and then being able to readily adopt a procedure or initiative which is new, improved, or more efficient. Despite the construction industry’s awareness of the various threats and opportunities associated with the delivery of change, research found little attention is currently given to develop a ‘decision-making framework’ that comprises measurable elements (dynamics) that may assist in more accurately determining an organisation’s level of readiness or ability to deliver innovative change. To resolve this, an initial Background Literature Review in 2004 identified six such dynamics, those of Change, Innovation, Implementation, Culture, Leadership, and Training and Education, which were then hypothesised to be key components of a ‘Conceptual Decision-making Framework’ (CDF) for delivering innovative change within an organisation. To support this hypothesis, a second (more extensive) Literature Review was undertaken from late 2007 to mid 2009. A Delphi study was embarked on in June 2008, inviting fifteen building and construction industry members to form a panel and take part in a Delphi study. The selection criterion required panel members to have senior positions (manager and above) within a recognised field or occupation, and to have experience, understanding and / or knowledge in the process of delivering change within organisations. The final panel comprised nine representatives from private and public industry organisations and tertiary / research and development (R&D) universities. The Delphi study developed, distributed and collated two rounds of survey questionnaires over a four-month period, comprising open-ended and closed questions (referred to as factors). The first round of Delphi survey questionnaires were distributed to the panel in August 2008, asking them to rate the relevancy of the six hypothesised dynamics. In early September 2008, round-one responses were returned, analysed and documented. From this, an additional three dynamics were identified and confirmed by the panel as being highly relevant during the decision-making process when delivering innovative change within an organisation. The additional dynamics (‘Knowledge-sharing and Management’; ‘Business Process Requirements’; and ‘Life-cycle Costs’) were then added to the first six dynamics and used to populate the second (final) Delphi survey questionnaire. This was distributed to the same nine panel members in October 2008, this time asking them to rate the relevancy of all nine dynamics. In November 2008, round-two responses were returned, analysed, summarised and documented. Final results confirmed stability in responses and met Delphi study guidelines. The final contribution is twofold. Firstly, findings confirm all nine dynamics as key components of the proposed CDF for delivering innovative change within an organisation. Secondly, the future development and testing of an ‘Innovative Change Delivery Process’ (ICDP) is proposed, one that is underpinned by an ‘Innovative Change Decision-making Framework’ (ICDF), an ‘Innovative Change Delivery Analysis’ (ICDA) program, and an ‘Innovative Change Delivery Guide’ (ICDG).

Relevância:

80.00% 80.00%

Publicador:

Resumo:

As the sustainability awareness rises globally, the construction industry is under increasing pressure to improve efficiency and project delivery. The implementation of Industrialised Building Systems (IBS), for which utility components are built offsite, has the potential of promoting sustainability deliverables. This can be achieved by better control of production environment, minimising construction waste, using efficient building material energy, and stabilising work conditions. As a unique building technology, IBS has not been effectively implemented in Malaysia. Possible reasons may include limited understanding among stakeholders on the IBS potential and its relevance to sustainability. This warrants studies on the sustainability issues of IBS design, construction, operation and maintenance, A framework is being developed through research to assess performance criteria related to sustainability, which should be considered during IBS design and application in the most consistent and systematic way. This paper discusses how these sustainability performance criteria are examined in a continuing research project and the processes conducive to implementing sustainable IBS in Malaysia. Existing tools, indicators and guidelines are reviewed, analysed and grouped according to characteristics and application. The research also hopes to produce guidelines for stakeholders to incorporate sustainability issues and concepts into IBS applications.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

In Malaysia, Industrialised Building Systems (IBS) are being promoted as a potential to enhance sustainability by the building industry and government. Known elsewhere as prefabricated construction, IBS employs a combination of ready-made components in the construction of buildings that promote quality of production, enhance simplification of construction processes and minimise on-site work. The components are manufactured in a factory either on or off site. They are then positioned and assembled into building structures. The unique characteristic of IBS has the potential to respond well to the sustainability challenge facing the construction industry. Despite the promises however, IBS has yet to be effectively implemented in Malaysia. There are often misconceptions among key stakeholders about IBS applications and some of the rating schemes fail to assess IBS towards sustainability deliverables. A holistic approach to improving IBS implementation is necessary to consider sustainability perceptions on IBS among key stakeholders. As IBS design is one of the most important development phases to incorporate sustainability requirements and expectations, a framework of embedding sustainability factors into IBS design is being developed through research. This paper presents an improved IBS design process focused on sustainability, showing where and how sustainability should be assessed to improve IBS construction. The framework being developed can provide guidance and decision making assistance to not only design consultants but all relevant stakeholders by integrating sustainability concepts into IBS applications. Outcome of the research will also provide a benchmark for developing countries in adopting prefabricated construction systems.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

In this research we examined, by means of case studies, the mechanisms by which relationships can be managed and by which communication and cooperation can be enhanced in developing sustainable supply chains. The research was predicated on the contention that the development of a sustainable supply chain depends, in part, on the transfer of knowledge and capabilities from the larger players in the supply chain. A sustainable supply chain requires proactive relationship management and the development of an appropriate organisational culture, and trust. By legitimising individuals’ expectations of the type of culture which is appropriate to their company and empowering employees to address mismatches that may occur, a situation can be created whereby the collaborating organisations develop their competences symbiotically and so facilitate a sustainable supply chain. Effective supply chain management enhances organisation performance and competitiveness through the management of operations across organisational boundaries. Relational contracting approaches facilitate the exchange of information and knowledge and build capacity in the supply chain, thus enhancing its sustainability. Relationship management also provides the conditions necessary for the development of collaborative and cooperative relationships However, often subcontractors and suppliers are not empowered to attend project meetings or to have direct communication with project based staff. With this being a common phenomenon in the construction industry, one might ask: what are the barriers to implementation of relationship management through the supply chain? In other words, the problem addressed in this research is the engagement of the supply chain through relationship management.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This presentation relates to a paper presenting an explanation of why the reuse of building components after demolition or deconstruction is critical to the future of the construction industry. An examination of the historical cause and response to climate change sets the scene as to why governance is becoming increasingly focused on the built environment as a mechanism to controlling waste generation associated with the process of demolition, construction and operation. Through an annotated description to the evolving design and construction methodology of a range of timber dwellings (typically 'Queenslanders' during the eras of 1880-1900, 1900-1920 & 1920-1940) the paper offers an evaluation to the variety of materials, which can be used advantageously by those wishing to 'regenerate' a Queenslander. This analysis of 'regeneration' details the constraints when considering relocation and/ or reuse by adaption including deconstruction of building components against the legislative framework requirements of the Queensland Building Act 1975 and the Queensland Sustainable Planning Act 2009, with a specific examination to those of the Building Codes of Australia. The paper concludes with a discussion of these constraints, their impacts on 'regeneration' and the need for further research to seek greater understanding of the practicalities and drivers of relocation, adaptive and building components suitability for reuse after deconstruction.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Sustainability concerns every citizen. Housing affordability and sustainable solutions are being highlighted in research and practice in many parts of the world. This paper discusses the development of a Commuter Energy and Building Utilities System (CEBUS) in sustainable housing projects as a means of bridging the gap between current median house pricing and target affordable house pricing for low income earners. Similar scales of sustainable housing development cannot be achieved through independent application of current best practice methods in ecologically sustainable development strategies or transit oriented development master plans. This paper presents the initial stage of research on first capital and ongoing utilities and transport cost savings available from these sustainable design methods. It also outlines further research and development of a CEBUS Dynamic Simulation Model and Conceptual Framework for the Australian property development and construction industry.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

In Australia, it has been increasingly accepted that sustainability needs to be at the top of the agenda when contemplating infrastructure development. In practice however, many companies struggle to find effective ways to embrace sustainable ideas and implement them in real projects beyond minimum compliance. One of the reasons is the lack of underpinning knowledge and evidence to demonstrate and measure the linkage between sustainability implementations and the relevant outcomes. This is compounded by the fact that very often there are no common understandings between the stakeholders on sustainability and there is a big divide between research advancement and real-life applications. Therefore it is both feasible and timely to develop and expand the body of sustainability knowledge on infrastructure development and investigate better ways of communicating with and managing it within the infrastructure sector. Although knowledge management (KM) is a relatively new and emerging discipline, it has shown its value and promise in existing applications in the construction industry. Considering the existing KM mechanisms and tools employed in practice, this research is aimed at establishing a specific KM approach to facilitate sustainability knowledge identification, acquisition, sharing, maintenance and application within the infrastructure sector, and promote integrated decision-making for sustainable infrastructure development. A triangulation of questionnaire survey, semi-structured interviews and case studies was employed in this research to collect required qualitative and quantitative data. The research studied the unique characteristics of the infrastructure sector, the nature of sustainability knowledge, and evaluated and validated the critical elements, key processes, and priority issues of KM for the Australian infrastructure sector. A holistic KM framework was developed to set the overall context for managing sustainability knowledge in the infrastructure sector by outlining (1) the main aims and outcomes of managing sustainability knowledge, (2) the key knowledge activities, (3) effective KM strategies and instruments, and (4) KM enablers. Because of the highly project-oriented nature of the infrastructure sector, knowledge can only add value when it is being used in real projects. Implementation guidelines were developed to help the industry practitioners and project teams to apply sustainability knowledge and implement KM in infrastructure project scenarios. This research provides the Australian infrastructure sector with tools to better understand KM, helps the industry practitioners to prioritize attention on relevant sustainability issues, and recommends effective practices to manage sustainability knowledge, especially in real life implementation of infrastructure projects.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Value Management (VM) initially started in early 1940s in the US manufacturing industry has increasingly becoming popular within the construction industry community internationally. It has been widely accepted as an important tool in the management of projects. The structured, systematic and multi-disciplinary approach in decision making process is a niche for VM in delivering better value for money project to the client investment. It would appear to be gaining some momentum as an essential management tool in the Malaysian construction sector especially in the quantity surveying practice. Quantity surveyors increasing involvement in VM provides an opportunity for the profession to re-model some of its traditional services in a more positive light and develop leading-edge skills and promote the profession. International practice has associated VM to be part of services offered in the quantity surveying practice; especially in UK has proven to be a natural progression of QS profession. The introduction of VM as early 1980’s in Malaysia combined with increasing demand for construction project to facilitate nation progress is shedding a positive light for quantity surveying profession to take lead in developing VM as one of their niche area. Therefore, the quantity surveying profession having the opportunity to take lead of this service which reflect their traditional attributes for providing the best value-for-money advise to the client. This paper shall discuss on the development of VM in Malaysia and the challenges VM face services in QS firm to remain ahead of their competitors.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

PPP is a general term covering all contracted relationships between the public and private sectors to produce a public asset or to deliver a public service. Its major advantage lies in utilising resources from the private sector to alleviate some of the financial burdens of the government. The Asian financial turmoil in the late 1990s has imposed enormous pressure on the budget of the Hong Kong Special Administrative Region (HKSAR) Government. With a continuous outcry for better public services due to the rapid development of Hong Kong, alternative financing models need to be sought to ensure sustainability. Hong Kong has the advantage of being the international gateway to Mainland China, and with this benefit has attracted overseas enterprises to base their offices in Hong Kong for the Asian market. Obviously the private sector has much to contribute. The HKSAR Government has realised the benefits of using PPP in Hong Kong as well as the success achieved overseas. But a more thorough research is needed to develop the most suitable practice of PPP in terms of project nature, project complexity, project type and project scale under which PPP is most appropriate for Hong Kong. This paper provides an initial report of a research project being funded by the Research Grants Council (RGC) of the HKSAR. The project aims to evaluate the benefits and risks of PPP adopted in Australia and the United Kingdom, and from these previous experiences to develop a best practice framework for implementing PPP in Hong Kong. It firstly reports on the status of PPP development trend and the hands-on experiences which have been drawn in these countries. Qualitative and quantitative research methods applied in conducting the research are discussed. The likely impacts of the study are highlighted. It is believed that the construction industry and the government would benefit a lot as a result of this study, and further procurement and project financing options would be opened up for delivering better future public service.