856 resultados para FINANCIAL SERVICES


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Systemic risks and other factors that contributed to the global financial crisis have highlighted the need to reconsider the scope and nature of financial literacy initiatives and programs. In this article, we argue the case for rethinking financial literacy and the need for integrated solutions that explicitly incorporate solutions to behavioural shortcomings exhibited by individuals in their financial decision-making. While recognising the need to consider behavioural biases in individuals’ financial decisions, to date regulatory responses have largely ignored those biases in their proposed education and other strategies designed to address poor financial literacy and improve financial disclosure that, in turn, will improve financial decision-making.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Value Management (VM) has been proven to provide a structured framework, together with supporting tools and techniques that facilitate effective decision-making in many types of projects, thus achieving ‘best value’ for clients. It is identified at International level as a natural career progression for the construction service provider and as an opportunity in developing leading-edge skills. The services offered by contractors and consultants in the construction sector have been expanding. In an increasingly competitive and global marketplace, firms are seeking ways to differentiate their services to ever more knowledgeable and demanding clients. The traditional demarcations have given way, and the old definition of what contractors, designers, engineers and quantity surveyors can, and cannot do in terms of their market offering has changed. Project management, design and cost and safety consultancy services, are being delivered by a diverse range of suppliers. Value management services have been developing in various sectors in industry; from manufacturing to the military and now construction. Given the growing evidence that VM has been successful in delivering value-for-money to the client, VM would appear to be gaining some momentum as an essential management tool in the Malaysian construction sector. The recently issued VM Circular 3/2009 by the Economic Planning Unit Malaysia (EPU) possibly marks a new beginning in public sector client acceptance on the strength of VM in construction. This paper therefore attempts to study the prospects of marketing the benefits of VM by construction service providers, and how it may provide an edge in an increasingly competitive Malaysian construction industry.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Increasingly, software is no longer developed as a single system, but rather as a smart combination of so-called software services. Each of these provides an independent, specific and relatively small piece of functionality, which is typically accessible through the Internet from internal or external service providers. To the best of our knowledge, there are no standards or models that describe the sourcing process of these software based services (SBS). We identify the sourcing requirements for SBS and associate the key characteristics of SBS (with the sourcing requirements introduced). Furthermore, we investigate the sourcing of SBS with the related works in the field of classical procurement, business process outsourcing, and information systems sourcing. Based on the analysis, we conclude that the direct adoption of these approaches for SBS is not feasible and new approaches are required for sourcing SBS.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Increasingly, software is no longer developed as a single system, but rather as a smart combination of so-called software services. Each of these provides an independent, specific and relatively small piece of functionality, which is typically accessible through the Internet from internal or external service providers. There are no standards or models that describe the sourcing process of these software based services (SBS). The authors identify the sourcing requirements for SBS and associate the key characteristics of SBS (with the sourcing requirements introduced). Furthermore, this paper investigates the sourcing of SBS with the related works in the field of classical procurement, business process outsourcing, and information systems sourcing. Based on the analysis, the authors conclude that the direct adoption of these approaches for SBS is not feasible and new approaches are required for sourcing SBS.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A new explicit rate allocation algorithm is proposed for achieving generic weight-proportional max-min (GWPMM) fairness in asynchronous transfer mode (ATM) available bit rate services. This algorithm scales well with a fixed computational complexity of O(1) and can realise GWPMM fair rate allocation in an ATM network accurately.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Tracking/remote monitoring systems using GNSS are a proven method to enhance the safety and security of personnel and vehicles carrying precious or hazardous cargo. While GNSS tracking appears to mitigate some of these threats, if not adequately secured, it can be a double-edged sword allowing adversaries to obtain sensitive shipment and vehicle position data to better coordinate their attacks, and to provide a false sense of security to monitoring centers. Tracking systems must be designed with the ability to perform route-compliance and thwart attacks ranging from low-level attacks such as the cutting of antenna cables to medium and high-level attacks involving radio jamming and signal / data-level simulation, especially where the goods transported have a potentially high value to terrorists. This paper discusses the use of GNSS in critical tracking applications, addressing the mitigation of GNSS security issues, augmentation systems and communication systems in order to provide highly robust and survivable tracking systems.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper describes a secure framework for tracking applications that use the Galileo signal authentication services. First a number of limitations that affect the trust of critical tracking applications, even in presence of authenticated GNSS signals, are detailed. Requirements for secure tracking are then introduced; detailing how the integrity characteristics of the Galileo authentication could enhance the security of active tracking applications. This paper concludes with a discussion of our existing tracking technology using a Siemens TC45 GSM/GPRS module and future development utilizing our previously proposed trusted GNSS receiver.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The paper describes a number of requirements for enhancing the trust of location acquisition from Satellite Navigation Systems, particularly for those applications where the location is monitored through a remote GNSS receiver. We discuss how the trust of a location acquisition could be propagated to an application through the use of a proposed tamper-­resistant GNSS receiver which quantifies the trust of a location solution from the signaling used (ie. P(Y) code, Galileo SOL, PRS, CS) and provides a cryptographic proof of this to a remote application. The tamper­-resistance state of the receiver is also included in this cryptographic proof.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Purpose: To provide recommendations for construction clients who design and implement financial incentive mechanisms (FIMs) on projects. ---------- Methodology: Four large Australian building projects commissioned by government clients under managing contractor contracts and completed between 2001 and 2005 were examined to explore the ‘drivers’ that promoted motivation toward financial incentive goals. The results were triangulated across data sources, projects and stakeholder types. ---------- Findings: FIM design should incorporate: 1. flexibility to modify goals and measurement procedures over time, 2. multiple goals covering different project areas, 3. distribution of rewards across all the key organizations contributing to team performance (e.g. potentially not just the contractor, but the subcontractors and consultants) and a reward amount sufficient to be valued by potential recipients. FIM benefits are maximized through the following complementary procurement initiatives: 4. equitable contract risk allocation, 5. early contractor involvement in design, 6. value-driven tender selection, 7. relationship workshops, and 8. future work opportunities.---------- Research Limitations: This paper provides practical recommendations to industry and hence does not emphasize theoretical aspects.---------- Practical Implications: The uptake of these recommendations is likely to increase the impact of FIMs on motivation and improve project and industry outcomes. Although the study focuses on government clients of building projects, all the recommendations would seem to apply equally to private-sector clients and to non-building projects.---------- Originality: In order to improve motivation and reward high performance, clients are increasingly using FIM in their construction contracts. Despite the rising use of financial incentives, there is a lack of comprehensive construction-specific knowledge available to help clients maximize outcomes. The study addresses this gap in the literature.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Construction industry observers tout the use of financial incentives as promoters of motivation and commitment on projects. Yet, little empirical evidence exists concerning their effectiveness. What are the drivers of motivation on construction projects? The reasons that construction project participants are motivated to pursue voluntary incentive goals are examined through four Australian case studies. The results demonstrate the critical role played by project relationships and equitable contract conditions in promoting the effectiveness of financial incentives. In the context of a construction project, this study finds financial incentives to be less important to motivation and performance than relationship enhancement initiatives. This finding is unexpected and has implications for the design of project procurement strategies. These results suggest if project clients ignore the importance of relationship quality between participants, the impact of any financial incentive will be compromised.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Rural-urban migration continues to grow in many developing countries including Vietnam. The experience of stress and coping associated with this process may vary for people from different circumstances. However, there has been little research on migrants to date. This study adopts a qualitative approach to research on unregistered, male, migrant freelance labourers in urban Vietnam and to explore factors contributing to stress and coping among this population. The study revealed an array of stressors related to migrants' life experiences in urban space, including physical, financial and social factors. Coping was diverse, including problem-focused coping (PFC) and emotion-focused coping (EFC), pro-social and anti-social, active and passive. Less active and anti-social coping appeared common. Together, weak social network and lack of support from formal systems placed coping and adaptation in a cyclic relationship. The results highlight a multi-disciplinary approach to help cope and adapt effectively for these men.