881 resultados para Electric power system stability
Resumo:
Cogeneration may be defined as the simultaneous production of electric power and useful heat from the burning of a single fuel. This technique of combined heat and power production has been applied in both the industrial and tertiary sectors. It has been mainly used because of its overall efficiency, and the guarantee of electricity with a low level of environmental impact. The compact cogeneration systems using internal combustion engine as prime movers are thoroughly applied because of the good relationship among cost and benefit obtained in such devices. The cogeneration system of this study consists of an internal combustion engine using natural gas or biogas as fuel, combined with two heat exchangers and an absorption chiller utilising water-ammonia as working mixture. This work presents an energetic and economic comparison between natural gas and biogas as fuel used for the system proposed. The results are useful to identify the feasible applications for this system, such as residential sector in isolated areas, hotels, universities etc. (C) 2014 Elsevier Ltd. All rights reserved.
Resumo:
This paper considers the congestion effects on emission and consumers' allocated cost. In order to consider some environmental and operational effects of congestion, an environmental constrained active-reactive optimal power flow (AROPF) considering capability curve is presented. On outage conditions, the total cost of the system will increase. On the other hand in power systems, the operating cost and system emission have conflicted objectives, then it may be concluded that the outage in the system may lead to a total emission decrease. In this paper the famous Aumann-Shapley method is used as a pricing methodology. Two case studies such as 14-bus and US-bus IEEE test systems are conducted. Results demonstrate that, although the line outage in power systems leads to increase the total cost, the amount of emission depending on the place where the outage occurs can be more than, less than or equal to the normal conditions' emission. Also results show that although from power sellers' standpoint the well-known Aumann-Shapley method is a precise pricing method to cover the incurred cost with an acceptable error that can show the real effect of congestion on consumers' cost, from consumers' standpoint it is not a good method for cost allocation, because some consumers will face with an increase in cost and the others will face with a decrease on their cost.
Resumo:
Pós-graduação em Engenharia Elétrica - FEIS
Resumo:
Pós-graduação em Engenharia Elétrica - FEIS
Resumo:
Pós-graduação em Engenharia Elétrica - FEIS
Resumo:
Pós-graduação em Engenharia Elétrica - FEIS
Resumo:
Pós-graduação em Engenharia Mecânica - FEB
Resumo:
A new approach called the Modified Barrier Lagrangian Function (MBLF) to solve the Optimal Reactive Power Flow problem is presented. In this approach, the inequality constraints are treated by the Modified Barrier Function (MBF) method, which has a finite convergence property: i.e. the optimal solution in the MBF method can actually be in the bound of the feasible set. Hence, the inequality constraints can be precisely equal to zero. Another property of the MBF method is that the barrier parameter does not need to be driven to zero to attain the solution. Therefore, the conditioning of the involved Hessian matrix is greatly enhanced. In order to show this, a comparative analysis of the numeric conditioning of the Hessian matrix of the MBLF approach, by the decomposition in singular values, is carried out. The feasibility of the proposed approach is also demonstrated with comparative tests to Interior Point Method (IPM) using various IEEE test systems and two networks derived from Brazilian generation/transmission system. The results show that the MBLF method is computationally more attractive than the IPM in terms of speed, number of iterations and numerical conditioning. (C) 2011 Elsevier B.V. All rights reserved.
Resumo:
The installation of induction distributed generators should be preceded by a careful study in order to determine if the point of common coupling is suitable for transmission of the generated power, keeping acceptable power quality and system stability. In this sense, this paper presents a simple analytical formulation that allows a fast and comprehensive evaluation of the maximum power delivered by the induction generator, without losing voltage stability. Moreover, this formulation can be used to identify voltage stability issues that limit the generator output power. All the formulation is developed by using the equivalent circuit of squirrel-cage induction machine. Simulation results are used to validate the method, which enables the approach to be used as a guide to reduce the simulation efforts necessary to assess the maximum output power and voltage stability of induction generators. (C) 2011 Elsevier Ltd. All rights reserved.
Resumo:
The aim of solving the Optimal Power Flow problem is to determine the optimal state of an electric power transmission system, that is, the voltage magnitude and phase angles and the tap ratios of the transformers that optimize the performance of a given system, while satisfying its physical and operating constraints. The Optimal Power Flow problem is modeled as a large-scale mixed-discrete nonlinear programming problem. This paper proposes a method for handling the discrete variables of the Optimal Power Flow problem. A penalty function is presented. Due to the inclusion of the penalty function into the objective function, a sequence of nonlinear programming problems with only continuous variables is obtained and the solutions of these problems converge to a solution of the mixed problem. The obtained nonlinear programming problems are solved by a Primal-Dual Logarithmic-Barrier Method. Numerical tests using the IEEE 14, 30, 118 and 300-Bus test systems indicate that the method is efficient. (C) 2012 Elsevier B.V. All rights reserved.
Resumo:
This thesis is focused on Smart Grid applications in medium voltage distribution networks. For the development of new applications it appears useful the availability of simulation tools able to model dynamic behavior of both the power system and the communication network. Such a co-simulation environment would allow the assessment of the feasibility of using a given network technology to support communication-based Smart Grid control schemes on an existing segment of the electrical grid and to determine the range of control schemes that different communications technologies can support. For this reason, is presented a co-simulation platform that has been built by linking the Electromagnetic Transients Program Simulator (EMTP v3.0) with a Telecommunication Network Simulator (OPNET-Riverbed v18.0). The simulator is used to design and analyze a coordinate use of Distributed Energy Resources (DERs) for the voltage/var control (VVC) in distribution network. This thesis is focused control structure based on the use of phase measurement units (PMUs). In order to limit the required reinforcements of the communication infrastructures currently adopted by Distribution Network Operators (DNOs), the study is focused on leader-less MAS schemes that do not assign special coordinating rules to specific agents. Leader-less MAS are expected to produce more uniform communication traffic than centralized approaches that include a moderator agent. Moreover, leader-less MAS are expected to be less affected by limitations and constraint of some communication links. The developed co-simulator has allowed the definition of specific countermeasures against the limitations of the communication network, with particular reference to the latency and loss and information, for both the case of wired and wireless communication networks. Moreover, the co-simulation platform has bee also coupled with a mobility simulator in order to study specific countermeasures against the negative effects on the medium voltage/current distribution network caused by the concurrent connection of electric vehicles.
Resumo:
Wind power based generation has been rapidly growing world-wide during the recent past. In order to transmit large amounts of wind power over long distances, system planners may often add series compensation to existing transmission lines owing to several benefits such as improved steady-state power transfer limit, improved transient stability, and efficient utilization of transmission infrastructure. Application of series capacitors has posed resonant interaction concerns such as through subsynchronous resonance (SSR) with conventional turbine-generators. Wind turbine-generators may also be susceptible to such resonant interactions. However, not much information is available in literature and even engineering standards are yet to address these issues. The motivation problem for this research is based on an actual system switching event that resulted in undamped oscillations in a 345-kV series-compensated, typical ring-bus power system configuration. Based on time-domain ATP (Alternative Transients Program) modeling, simulations and analysis of system event records, the occurrence of subsynchronous interactions within the existing 345-kV series-compensated power system has been investigated. Effects of various small-signal and large-signal power system disturbances with both identical and non-identical wind turbine parameters (such as with a statistical-spread) has been evaluated. Effect of parameter variations on subsynchronous oscillations has been quantified using 3D-DFT plots and the oscillations have been identified as due to electrical self-excitation effects, rather than torsional interaction. Further, the generator no-load reactance and the rotor-side converter inner-loop controller gains have been identified as bearing maximum sensitivity to either damping or exacerbating the self-excited oscillations. A higher-order spectral analysis method based on modified Prony estimation has been successfully applied to the field records identifying dominant 9.79 Hz subsynchronous oscillations. Recommendations have been made for exploring countermeasures.
Resumo:
This dissertation presents the competitive control methodologies for small-scale power system (SSPS). A SSPS is a collection of sources and loads that shares a common network which can be isolated during terrestrial disturbances. Micro-grids, naval ship electric power systems (NSEPS), aircraft power systems and telecommunication system power systems are typical examples of SSPS. The analysis and development of control systems for small-scale power systems (SSPS) lacks a defined slack bus. In addition, a change of a load or source will influence the real time system parameters of the system. Therefore, the control system should provide the required flexibility, to ensure operation as a single aggregated system. In most of the cases of a SSPS the sources and loads must be equipped with power electronic interfaces which can be modeled as a dynamic controllable quantity. The mathematical formulation of the micro-grid is carried out with the help of game theory, optimal control and fundamental theory of electrical power systems. Then the micro-grid can be viewed as a dynamical multi-objective optimization problem with nonlinear objectives and variables. Basically detailed analysis was done with optimal solutions with regards to start up transient modeling, bus selection modeling and level of communication within the micro-grids. In each approach a detail mathematical model is formed to observe the system response. The differential game theoretic approach was also used for modeling and optimization of startup transients. The startup transient controller was implemented with open loop, PI and feedback control methodologies. Then the hardware implementation was carried out to validate the theoretical results. The proposed game theoretic controller shows higher performances over traditional the PI controller during startup. In addition, the optimal transient surface is necessary while implementing the feedback controller for startup transient. Further, the experimental results are in agreement with the theoretical simulation. The bus selection and team communication was modeled with discrete and continuous game theory models. Although players have multiple choices, this controller is capable of choosing the optimum bus. Next the team communication structures are able to optimize the players’ Nash equilibrium point. All mathematical models are based on the local information of the load or source. As a result, these models are the keys to developing accurate distributed controllers.
Resumo:
The cutoff frequencies of an EMI filter are normally given by the noise attenuation requirements the filter has to fulfill. In order to select the component values of the filter elements, i.e. inductances and capacitances, an additional design criterium is needed. In this paper the effect of the EMI filter input and output impedances are considered. The input impedance influences the filters effect on the system displacement power factor and the output impedance plays a key role in the system stability. The effect of filter element values, the number of filter stages as well as additional damping networks are considered and a design procedure is provided. For this analysis a two-port description of the input filters employing ABCD-parameters is used.
Resumo:
En el presente trabajo se estudia la producción potencial de biomasa procedente de los cultivos de centeno y triticale en las seis comarcas agrarias de la Comunidad de Madrid (CM) y la posibilidad de su aplicación a la producción de bioelectricidad en cada una de ellas. En primer lugar se realiza un estudio bibliográfico de la situación actual de la bioelectricidad. Uno de los principales datos a tener en cuenta es que en el PER 2011- 2020 se estima que el total de potencia eléctrica instalada a partir de biomasa en España en el año 2020 sea de 1.350 MW, unas dos veces y media la existente a finales de 2010. Además, se comenta el estado de la incentivación del uso de biomasa de cultivos energéticos para producción de electricidad, la cual se regula actualmente según el Real Decreto-ley 9/2013, de 12 de Julio, por el que se adoptaron medidas urgentes para garantizar la estabilidad financiera del sistema eléctrico, y se consideran los criterios de sostenibilidad en el uso de biocombustibles sólidos. Se realiza una caracterización de las seis comarcas agrarias que forman la Comunidad Autónoma de Madrid: Área Metropolitana, Campiña, Guadarrama, Lozoya- Somosierra, Sur-Occidental y Vegas, la cual consta de dos partes: una descripción de la climatología y otra de la distribución de la superficie dedicada a barbecho y cultivos herbáceos. Se hace una recopilación bibliográfica de los modelos de simulación más representativos de crecimiento de los cultivos (CERES y Cereal YES), así como de ensayos realizados con los cultivos de centeno y triticale para la producción de biomasa y de estudios efectuados mediante herramientas GIS y técnicas de análisis multicriterio para la ubicación de centrales de bioelectricidad y el estudio de la logística de la biomasa. Se propone un modelo de simulación de la productividad de biomasa de centeno y de triticale para la CM, que resulta de la combinación de un modelo de producción de grano en base a datos climatológicos y a la relación biomasa/grano media de ambos cultivos obtenida en una experiencia previa. Los modelos obtenidos responden a las siguientes ecuaciones (siendo TN = temperatura media normalizada a 9,9 ºC y PN = precipitación acumulada normalizada a 496,7 mm): - Producción biomasa centeno (t m.s./ha) = 2,785 * [1,078 * ln(TN + 2*PN) + 2,3256] - Producción biomasa triticale (t m.s./ha) = 2,595 * [2,4495 * ln(TN + 2*PN) + 2,6103] Posteriormente, aplicando los modelos desarrollados, se cuantifica el potencial de producción de biomasa de centeno y triticale en las distintas comarcas agrarias de la CM en cada uno de los escenarios establecidos, que se consideran según el uso de la superficie de barbecho de secano disponible (25%, 50%, 75% y 100%). Las producciones potenciales de biomasa, que se podrían alcanzar en la CM utilizando el 100% de la superficie de barbecho de secano, en base a los cultivos de centeno y triticale, se estimaron en 169.710,72 - 149.811,59 - 140.217,54 - 101.583,01 - 26.961,88 y 1.886,40 t anuales para las comarcas de Campiña - Vegas, Sur - Occidental - Área Metropolitana - Lozoya-Somosierra y Guadarrama, respectivamente. Se realiza un análisis multicriterio basado en la programación de compromiso para definir las comarcas agrarias con mejores características para la ubicación de centrales de bioelectricidad en base a los criterios de potencial de biomasa, infraestructura eléctrica, red de carreteras, espacios protegidos y superficie de núcleos urbanos. Al efectuar el análisis multicriterio, se obtiene la siguiente ordenación jerárquica en base a los criterios establecidos: Campiña, Sur Occidental, Vegas, Área Metropolitana, Lozoya-Somosierra y Guadarrama. Mediante la utilización de técnicas GIS se estudia la localización más conveniente de una central de bioelectricidad de 2,2 MW en cada una de las comarcas agrarias y según el uso de la superficie de barbecho de secano disponible (25%, 50%, 75% y 100%), siempre que exista potencial suficiente. Para el caso de la biomasa de centeno y de triticale en base seca se considera un PCI de 3500 kcal/kg, por lo que se necesitarán como mínimo 17.298,28 toneladas para satisfacer las necesidades de cada una de las centrales de 2,2 MW. Se analiza el potencial máximo de bioelectricidad en cada una de las comarcas agrarias en base a los cultivos de centeno y triticale como productores de biomasa. Según se considere el 25% o el 100% del barbecho de secano para producción de biomasa, la potencia máxima de bioelectricidad que se podría instalar en cada una de las comarcas agrarias variaría entre 5,4 y 21,58 MW en la comarca Campiña, entre 4,76 y 19,05 MW en la comarca Vegas, entre 4,46 y 17,83 MW en la comarca Sur Occidental, entre 3,23 y 12,92 MW en la comarca Área Metropolitana, entre 0,86 y 3,43 MW en la comarca Lozoya Somosierra y entre 0,06 y 0,24 MW en la comarca Guadarrama. La potencia total que se podría instalar en la CM a partir de la biomasa de centeno y triticale podría variar entre 18,76 y 75,06 MW según que se utilice el 25% o el 100% de las tierras de barbecho de secano para su cultivo. ABSTRACT In this work is studied the potential biomass production from rye and triticale crops in the six Madrid Community (MC) agricultural regions and the possibility of its application to the bioelectricity production in each of them. First is performed a bibliographical study of the current situation of bioelectricity. One of the main elements to be considered is that in the PER 2011-2020 is estimated that the total installed electric power from biomass in Spain in 2020 was 1.350 MW, about two and a half times as at end 2010. Also is discussed the status of enhancing the use of biomass energy crops for electricity production, which is currently regulated according to the Real Decreto-ley 9/2013, of July 12, by which urgent measures were adopted to ensure financial stability of the electrical system, and there are considered the sustainability criteria in the use of solid biofuels. A characterization of the six Madrid Community agricultural regions is carried out: Area Metropolitana, Campiña, Guadarrama, Lozoya-Somosierra, Sur-Occidental and Vegas, which consists of two parts: a description of the climatology and another about the distribution of the area under fallow and arable crops. It makes a bibliographic compilation of the most representative crop growth simulation models (CERES and Cereal YES), as well as trials carried out with rye and triticale crops for biomass production and studies conducted by GIS tools and techniques multicriteria analysis for the location of bioelectricity centrals and the study of the logistics of biomass. Is proposed a biomass productivity simulation model for rye and triticale for MC that results from the combination of grain production model based on climatological data and the average relative biomass/grain of both crops obtained in a prior experience. The models obtained correspond to the following equations (where TN = normalized average temperature and PN = normalized accumulated precipitation): - Production rye biomass (t d.m./ha) = 2.785 * [1.078 * ln (TN + 2*PN) + 2.3256] - Production triticale biomass (t d.m./ha) = 2,595 * [2.4495 * ln (TN + 2*PN) + 2.6103] Subsequently, applying the developed models, the biomass potential of the MC agricultural regions is quantified in each of the scenarios established, which are considered as the use of dry fallow area available (25%, 50%, 75 % and 100%). The potential biomass production that can be achieved within the MC using 100% of the rainfed fallow area based on rye and triticale crops, were estimated at 169.710,72 - 149.811,59 - 140.217,54 - 101.583,01 - 26.961,88 and 1.886,40 t annual for the regions of Campiña, Vegas, Sur Occidental, Area Metropolitana, Lozoya- Somosierra and Guadarrama, respectively. A multicriteria analysis is performed, based on compromise programming to define the agricultural regions with better features for the location of bioelectricity centrals, on the basis of biomass potential, electrical infrastructure, road network, protected areas and urban area criteria. Upon multicriteria analysis, is obtained the following hierarchical order based on criteria: Campiña, Sur Occidental, Vegas, Area Metropolitana, Lozoya-Somosierra and Guadarrama. Likewise, through the use of GIS techniques, the most suitable location for a 2,2 MW bioelectricity plant is studied in each of the agricultural regions and according to the use of dry fallow area available (25%, 50% , 75% and 100%), if there is sufficient potential. In the case of biomass rye and triticale dry basis is considered a PCI of 3500 kcal/kg, so it will take at least 17,298.28 t to satisfy the needs of each plant. Is analyzed the maximum bioelectricity potential on each of the agricultural regions on the basis of the rye and triticale crops as biomass producers. As deemed 25% or 100% dry fallow for biomass, the maximum bioelectricity potential varies between 5,4 and 21,58 MW in the Campiña region, between 4,76 and 19,05 MW in the Vegas region, between 4,46 and 17,83 MW in the Sur Occidental region, between 3,23 and 12,92 MW in the Area Metropolitana region, between 0,86 and 3,43 MW in the Lozoya-Somosierra region and between 0,06 and 0,24 MW in the Guadarrama region. The total power that could be installed in the CM from rye and triticale biomass could vary between 18.76 and 75.06 MW if is used the 25% or 100% of fallow land for rainfed crop.