944 resultados para ES-SAGD. pressure drop. heavy oil. reservoir modeling and simulation
Resumo:
Pós-graduação em Engenharia Elétrica - FEIS
Resumo:
Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)
Resumo:
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)
Resumo:
In the current decade, inter modal transport is widely discussed. In Brazil road transport is used in excess whereas there could be more focus and investment towards water transport. Water transport presents many benefits like being low cost and low maintenance. Sea and river ports today aren't capable of supporting Brazil's transport needs. Therefore, with this obstacle, this paper consists of an attempt of modeling and simulation of the process of unloading grain cargo from trucks, through simulation with ProModel software, to verify the necessity of installing more tumblers at the cargo unloading station in Porto Murtinho, MS
Resumo:
The optimal supply chain management (SCM) is considered by the companies a new frontier in order to gain efficiently competitive advantage. Through the SCM companies must define their competitive strategies by positioning inside the supply chain wich belongs both as suppliers and as consumers. The main objectives of SCM is integrate multiple suppliers to satisfy the market demand and make possible the synergies between the parts of the supply chain in order to better serve the consumer Meanwhile, selection, evaluation and development of suppliers play important roles in establishing an efficient supply chain. Thus, the SCM covers elements such as manufacturing, assembly, raw materials, and distribution to the final consumer. Due to the factors described, the focus of this paper is to present the Analytic Hierarchical Process (AHP) application as an appropriate and structured method for the supplier selection of a strategic line of low voltage transformers of a transformers industry and compare it with the selection process currently used by this industry, showing the advantages of applying a multiple criteria decision making method. In this study, the research methodology used was modeling and simulation
Resumo:
The objective of this study was to develop a model that allows testing in the wind tunnel at high angles of attack and validates its most critical components by analyzing the results of simulations in finite element software. During the project this structure suffered major loads identified during the flight conditions and, from these, we calculated the stresses in critical regions defined as the parts of the model that have higher failure probabilities. All aspects associated with Load methods, mesh refining and stress analysis were taken into account in this approach. The selection of the analysis software was based on project needs, seeking greater ease of modeling and simulation. We opted for the software ANSYS® since the entire project is being developed in CAD platforms enabling a friendly integration between software's modeling and analysis
Resumo:
Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)
Resumo:
Pós-graduação em Engenharia Elétrica - FEB
Resumo:
The Frequency Modulated - Atomic Force Microscope (FM-AFM) is apowerful tool to perform surface investigation with true atomic resolution. The controlsystem of the FM-AFM must keep constant both the frequency and amplitude ofoscillation of the microcantilever during the scanning process of the sample. However,tip and sample interaction forces cause modulations in the microcantilever motion.A Phase-Locked Loop (PLL) is used as a demodulator and to generate feedback signalto the FM-AFM control system. The PLL performance is vital to the FM-AFMperformace since the image information is in the modulated microcantilever motion.Nevertheless, little attention is drawn to PLL performance in the FM-AFM literature.Here, the FM-AFM control system is simulated, comparing the performancefor di erent PLL designs.
Resumo:
Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)
Resumo:
Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)
Resumo:
Pós-graduação em Ciência da Computação - IBILCE
Resumo:
In all segments, the companies are looking for the highest productivity with the lowest possible cost, and in the construction industry, the thinking is the same. Over time, techniques that generate more productivity supplanted previous techniques; an example is the CAD technology that replaced free drawings in projects execution. However, the Computer Aided Design (CAD) technology does not deal with certain factors that permeate the entire project. It is required the use of other techniques to supply this need in traditional projects. For example, a software for schedule management, another for assets management and a person who makes calculations for estimates and budgets. The BIM (Building Information Modeling) technology aims to integrate all this information, facilitating the communication among members of a work team and reducing the time required to carry out the project. This work is a applied research, a descriptive research, carried out through modeling and simulation, processes inherent in the use of BIM, a survey was also used only to contextualization. BIM was used for a soccer stadium roof project, in order to verify the feasibility of such use through the analysis of: BIM tools, difficulties encountered and implications of BIM use, and comparison of traditional methods and the use of BIM. To aid the contextualization, a survey was conducted to verify the use of BIM in medium and small companies
Resumo:
In all segments, the companies are looking for the highest productivity with the lowest possible cost, and in the construction industry, the thinking is the same. Over time, techniques that generate more productivity supplanted previous techniques; an example is the CAD technology that replaced free drawings in projects execution. However, the Computer Aided Design (CAD) technology does not deal with certain factors that permeate the entire project. It is required the use of other techniques to supply this need in traditional projects. For example, a software for schedule management, another for assets management and a person who makes calculations for estimates and budgets. The BIM (Building Information Modeling) technology aims to integrate all this information, facilitating the communication among members of a work team and reducing the time required to carry out the project. This work is a applied research, a descriptive research, carried out through modeling and simulation, processes inherent in the use of BIM, a survey was also used only to contextualization. BIM was used for a soccer stadium roof project, in order to verify the feasibility of such use through the analysis of: BIM tools, difficulties encountered and implications of BIM use, and comparison of traditional methods and the use of BIM. To aid the contextualization, a survey was conducted to verify the use of BIM in medium and small companies
Resumo:
Solar reactors can be attractive in photodegradation processes due to lower electrical energy demand. The performance of a solar reactor for two flow configurations, i.e., plug flow and mixed flow, is compared based on experimental results with a pilot-scale solar reactor. Aqueous solutions of phenol were used as a model for industrial wastewater containing organic contaminants. Batch experiments were carried out under clear sky, resulting in removal rates in the range of 96100?%. The dissolved organic carbon removal rate was simulated by an empirical model based on neural networks, which was adjusted to the experimental data, resulting in a correlation coefficient of 0.9856. This approach enabled to estimate effects of process variables which could not be evaluated from the experiments. Simulations with different reactor configurations indicated relevant aspects for the design of solar reactors.