Distributed generation (DG) resources are commonly used in the electric systems to obtain minimum line losses, as one of the benefits of DG, in radial distribution systems. Studies have shown the importance of appropriate selection of location and size of DGs. This paper proposes an analytical method for solving optimal distributed generation placement (ODGP) problem to minimize line losses in radial distribution systems using loss sensitivity factor (LSF) based on bus-injection to branch-current (BIBC) matrix. The proposed method is formulated and tested on 12 and 34 bus radial distribution systems. The classical grid search algorithm based on successive load flows is employed to validate the results. The main advantages of the proposed method as compared with the other conventional methods are the robustness and no need to calculate and invert large admittance or Jacobian matrices. Therefore, the simulation time and the amount of computer memory, required for processing data especially for the large systems, decreases.
Resumo:
This paper presents a new algorithm based on a Hybrid Particle Swarm Optimization (PSO) and Simulated Annealing (SA) called PSO-SA to estimate harmonic state variables in distribution networks. The proposed algorithm performs estimation for both amplitude and phase of each harmonic currents injection by minimizing the error between the measured values from Phasor Measurement Units (PMUs) and the values computed from the estimated parameters during the estimation process. The proposed algorithm can take into account the uncertainty of the harmonic pseudo measurement and the tolerance in the line impedances of the network as well as uncertainty of the Distributed Generators (DGs) such as Wind Turbines (WT). The main feature of proposed PSO-SA algorithm is to reach quickly around the global optimum by PSO with enabling a mutation function and then to find that optimum by SA searching algorithm. Simulation results on IEEE 34 bus radial and a realistic 70-bus radial test networks are presented to demonstrate the speed and accuracy of proposed Distribution Harmonic State Estimation (DHSE) algorithm is extremely effective and efficient in comparison with the conventional algorithms such as Weight Least Square (WLS), Genetic Algorithm (GA), original PSO and Honey Bees Mating Optimization (HBMO) algorithm.
Resumo:
Large penetration of rooftop PVs has resulted in unacceptable voltage profile in many residential distribution feeders. Limiting real power injection from PVs to alleviate over voltage problem is not feasible due to loss of green power and hence corresponding revenue loss. Reactive capability of the PV inverter can be a solution to address over voltage and voltage dip problems to some extent. This paper proposes an algorithm to utilize reactive capability of PV inverters and investigate their effectiveness for voltage improvement based on R/X ratio of the feeder. The length and loading level of the feeder for a particular R/X ratio to have acceptable voltage profile is also investigated. This can be useful for suburban design and residential distribution planning. Furthermore, coordination among different PVs using residential smart meters via a substation based controller is also proposed.
Resumo:
Rapidly increasing electricity demands and capacity shortage of transmission and distribution facilities are the main driving forces for the growth of Distributed Generation (DG) integration in power grids. One of the reasons for choosing a DG is its ability to support voltage in a distribution system. Selection of effective DG characteristics and DG parameters is a significant concern of distribution system planners to obtain maximum potential benefits from the DG unit. This paper addresses the issue of improving the network voltage profile in distribution systems by installing a DG of the most suitable size, at a suitable location. An analytical approach is developed based on algebraic equations for uniformly distributed loads to determine the optimal operation, size and location of the DG in order to achieve required levels of network voltage. The developed method is simple to use for conceptual design and analysis of distribution system expansion with a DG and suitable for a quick estimation of DG parameters (such as optimal operating angle, size and location of a DG system) in a radial network. A practical network is used to verify the proposed technique and test results are presented.
Resumo:
The Mekong is the most productive river fishery in the world, and such as, the Mekong River Basin (MRB) is very important to very large human populations across the region as a source of revenue (through fishing and marketing of aquatic resources products) and as the major source for local animal protein. Threats to biodiversity in the MRB, either to the fishery sector itself or to other sectors are a major concern, even though currently, fisheries across this region are still very productive. If not managed properly however, fish population declines will cause significant economic impact and affect livelihoods of local people and will have a major impact on food security and nutrition. Biodiversity declines will undoubtedly affect food security, income and socio-economic status of people in the MRB that depend on aquatic resources. This is an indicator of unsustainable development and hence should be avoided. Genetic diversity (biodiversity) that can be measured using techniques based on DNA markers; refers to variation within and among populations within the same species or reproductive units. In a population, new genetic variation is generated by sexual recombination contributed by individuals with mutations in genes and chromosomes. Over time, populations of a species that are not reproducing together will diverge as differential impacts of selection and genetic drift change their genetic attributes. For mud carp (Henicorhynchus spp.), understanding the status of breeding units in the MRB will be important for their long term persistence, sustainability and for implementing effective management strategies. Earlier analysis of stock structure in two economically important mud carp species (Henicorhynchus siamensis and H. lobatus) in the MRB completed with mtDNA markers identified a number of populations of both species where gene flow had apparently been interrupted or reduced but applying these data directly to management unit identification is potentially compromised because information was only available about female dispersal patterns. The current study aimed to address this problem and to fully assess the extent of current gene flow (nDNA) and reproductive exchange among selected wild populations of two species of carp (Henicorhynchus spp.) of high economic importance in the MRB using combined mtDNA and nDNA markers. In combination, the data can be used to define effective management units for each species. In general, nDNA diversity for H. lobatus (with average allelic richness (A) 7.56 and average heterozygosity (Ho) 0.61) was very similar to that identified for H. siamensis (A = 6.81 and Ho = 0.75). Both mud carp species show significant but low FST estimates among populations as a result of lower genetic diversity among sampled populations compared with genetic diversity within populations that may potentially mask any 'real' population structure. Overall, population genetic structure patterns from mtDNA and nDNA in both Henicorhynchus species were largely congruent. Different population structures however, were identified for the two Henicorhynchus species across the same geographical area. Apparent co-similarity in morphology and co-distribution of these two relatively closely related species does not apparently imply parallel evolutionary histories. Differences in each species population structure likely reflect historical drainage rearrangement of the Mekong River. The data indicate that H. siamensis is likely to have occupied the Mekong system for much longer than has H. lobatus in the past. Two divergent stocks were identified for H. lobatus in the MRB below the Khone Falls while a single stock had been evident in the earlier mtDNA study. This suggests that the two Henicorhynchus species may possess different life history traits and that different patterns of gene flow has likely influenced modern genetic structure in these close congeners. In combination, results of the earlier mtDNA and the current study have implications for effective management of both Henicorhynchus species across the MRB. Currently, both species are essentially treated as a single management unit in this region. This strategy may be appropriate for H. lobatus as a single stock was evident in the main stream of the MRB, but may not be appropriate for H. siamensis as more than a single stock was identified across the same range for this species. Management strategies should consider this difference to conserve overall biodiversity (local discrete populations) and this will include maintaining natural habitat and migration pathways, provision of fish sanctuaries (refuges) and may also require close monitoring of any stock declines, a signal that may require effective recovery strategies.
Resumo:
Voltage rise is the main issue which limits the capacity of Low Voltage (LV) network to accommodate more Renewable Energy (RE) sources. In addition, voltage drop at peak load period is a significant power quality concern. This paper proposes a new robust voltage support strategy based on distributed coordination of multiple distribution static synchronous compensators (DSTATCOMs). The study focuses on LV networks with PV as the RE source for customers. The proposed approach applied to a typical LV network and its advantages are shown comparing with other voltage control strategies.
Resumo:
This paper presents a full system demonstration of dynamic sensorbased reconfiguration of a networked robot team. Robots sense obstacles in their environment locally and dynamically adapt their global geometric configuration to conform to an abstract goal shape. We present a novel two-layer planning and control algorithm for team reconfiguration that is decentralised and assumes local (neighbour-to-neighbour) communication only. The approach is designed to be resource-efficient and we show experiments using a team of nine mobile robots with modest computation, communication, and sensing. The robots use acoustic beacons for localisation and can sense obstacles in their local neighbourhood using IR sensors. Our results demonstrate globally-specified reconfiguration from local information in a real robot network, and highlight limitations of standard mesh networks in implementing decentralised algorithms.
Resumo:
Rating systems are used by many websites, which allow customers to rate available items according to their own experience. Subsequently, reputation models are used to aggregate available ratings in order to generate reputation scores for items. A problem with current reputation models is that they provide solutions to enhance accuracy of sparse datasets not thinking of their models performance over dense datasets. In this paper, we propose a novel reputation model to generate more accurate reputation scores for items using any dataset; whether it is dense or sparse. Our proposed model is described as a weighted average method, where the weights are generated using the normal distribution. Experiments show promising results for the proposed model over state-of-the-art ones on sparse and dense datasets.
Resumo:
Background: Seizures and interictal spikes in mesial temporal lobe epilepsy (MTLE) affect a network of brain regions rather than a single epileptic focus. Simultaneous electroencephalography and functional magnetic resonance imaging (EEG-fMRI) studies have demonstrated a functional network in which hemodynamic changes are time-locked to spikes. However, whether this reflects the propagation of neuronal activity from a focus, or conversely the activation of a network linked to spike generation remains unknown. The functional connectivity (FC) changes prior to spikes may provide information about the connectivity changes that lead to the generation of spikes. We used EEG-fMRI to investigate FC changes immediately prior to the appearance of interictal spikes on EEG in patients with MTLE. Methods/principal findings: Fifteen patients with MTLE underwent continuous EEG-fMRI during rest. Spikes were identified on EEG and three 10 s epochs were defined relative to spike onset: spike (0–10 s), pre-spike (−10 to 0 s), and rest (−20 to −10 s, with no previous spikes in the preceding 45s). Significant spike-related activation in the hippocampus ipsilateral to the seizure focus was found compared to the pre-spike and rest epochs. The peak voxel within the hippocampus ipsilateral to the seizure focus was used as a seed region for FC analysis in the three conditions. A significant change in FC patterns was observed before the appearance of electrographic spikes. Specifically, there was significant loss of coherence between both hippocampi during the pre-spike period compared to spike and rest states. Conclusion/significance: In keeping with previous findings of abnormal inter-hemispheric hippocampal connectivity in MTLE, our findings specifically link reduced connectivity to the period immediately before spikes. This brief decoupling is consistent with a deficit in mutual (inter-hemispheric) hippocampal inhibition that may predispose to spike generation.
Resumo:
Integration of rooftop photovoltaics (PVs) in residential networks at moderate penetration levels is becoming a reality in many countries including Australia. Despite the technical challenges in properly accommodating PV units, one of the major benefits is the ability of PV units to extend useful life time of distribution transformers. This effect is not quantified in the existing literature. This paper carries out an analysis into the impacts of rooftop PVs at different penetration levels on the performance of distribution transformers and residential networks. This paper presents a methodology to quantify the benefit of the distribution transformer life extension brought about by customer-owned rooftop PV units. The proposed methodology is applied to a real distribution system with various scenarios, including different penetration levels. The results show the distribution transformer loss-of-life function, as a function of the rooftop PV penetration level, is monotonically decreasing function which saturates after a certain penetration level. The best life improvements occur with transformers that are highly loaded and the presence of a significant PV installation may support the deferral of transformer upgrades.
Resumo:
The World Health Organization identifies road trauma as a major public health issue in every country; most notably among low-to-middle income countries. More than 90% of all road fatalities occur in these countries, although they have only 48% of all registered vehicles [1]. Unprecedented focus has been placed on reducing the global road trauma burden through the United Nations Decade of Action for Road Safety (2011-2020). China is rapidly transitioning from a nation of bicycle riders and pedestrians to one where car ownership and use is increasing. This transition presents important public health, mobility, and safety challenges. Rapid motorisation has resulted in an increased road trauma burden, shouldered disproportionately among the population. Vulnerable road users (bicyclists, pedestrians, and motorcyclists) are of particular concern, representing 70% of all road-related fatalities [1]. Furthermore, those at greatest risk of sustaining a crash-related disability are: male, older, less educated, and earning a lower income [2] and residing in urban areas [3], with higher fatality rates in north-western poorer provinces [3]. Speeding is a key factor in road crashes in China [1, 4] and is one of two risk factors targeted in the Bloomberg Philanthropies-funded Global Road Safety Program operating in two Chinese cities over five year [5] to which the first author has provided expert advice. However, little evidence exists to help understand the factors underpinning speeding behaviour. Previous research conducted by the authors in Beijing and Hangzhou explored personal, social, and legal factors relating to speeding to assist in better understanding the motivations for non-compliance with speed limits. Qualitative and quantitative research findings indicated that speeding is relatively common, including self-reported travel speeds of greater than 30 km/hour above posted speed limits [6], and that the road safety laws and enforcement practices may, in some circumstances, contribute to this [7]. Normative factors were also evident; the role of friends, family members and driving instructors were influential. Additionally, using social networks to attempt to avoid detection and penalty was reported, thereby potentially reinforcing community perceptions that speeding is acceptable [8, 9]. The authors established strong collaborative links with the Chinese Academy of Sciences and Zhejiang Police College to conduct this research. The first author has worked in both institutions for extended time periods and recognises that research must include an understanding of culturally-relevant issues if road safety is to improve in China. Future collaborations to assist in enhancing our understanding of such issues are welcomed. References [1] World Health Organization. (2009). Global status report on road safety: Time for action; Geneva. [2] Chen, H., Du, W., & Li, N. (2013). The socioeconomic inequality in traffic-related disability among Chinese adults: the application of concentration index. Accident Analysis & Prevention, 55(101-106). [3] Wang, S. Y., Li, Y. H., Chi, G. B., Xiao, S. Y., Ozanne-Smith, J., Stevenson, M., & Phillips, M. (2008). Injury-related fatalities in China: an under-recognised public-health problem. The Lancet (British edition), 372(9651), 1765-1773. [4] He, J., King, M. J., Watson, B., Rakotonirainy, A., & Fleiter, J. J. (2013). Speed enforcement in China: National, provincial and city initiatives and their success. Accident Analysis & Prevention, 50, 282-288. [5] Bhalla, K., Li, Q., Duan, L., Wang, Y., Bishai, D., & Hyder, A. A. (2013). The prevalence of speeding and drink driving in two cities in China: a mid project evaluation of ongoing road safety interventions. Injury, 44, 49-56. doi:10.1016/S0020-1383(13)70213-4. [6] Fleiter, J. J., Watson, B., & Lennon, A. (2013). Awareness of risky behaviour among Chinese drivers. Peer-reviewed paper presented at 23rd Canadian Multidisciplinary Road Safety Conference, Montréal, Québec. [7] Fleiter, J. J., Watson, B., Lennon, A., King, M. J., & Shi, K. (2009). Speeding in Australia and China: A comparison of the influence of legal sanctions and enforcement practices on car drivers. Peer-reviewd paper presented at Australasian Road Safety Research Policing Education Conference, Sydney. [8] Fleiter, J. J., Watson, B., Lennon, A., King, M. J., & Shi, K. (2011). Social influences on drivers in China. Journal of the Australasian College of Road Safety, 22(2), 29-36. [9] Fleiter, J. J., Watson, B., Guan, M. Q., Ding, J. Y., & Xu, C. (2013). Characteristics of Chinese Drivers Attending a Mandatory Training Course Following Licence Suspension. Peer-reviewed paper presented at Road Safety on Four Continents, Beijing, China.
Resumo:
Re-supplying loads on outage through cross-connect from adjacent feeders in a distribution system may cause voltage drop and hence require load shedding. However, the surplus PV generated in some of the LV feeders can prevent load shedding, and improve reliability. In order to measure these effects, this paper proposes the application of Direct Load Flow method[1] in reliability evaluation of distribution systems with PV units. As part of this study, seasonal impacts on load consumption together with surplus PV output power injection to higher voltage networks are also considered. New indices are proposed to measure yearly expected energy export, from LV to MV and from MV to higher voltage network.
Resumo:
The Hong Kong construction industry is currently facing ageing problem and labour shortage. There are opportunities for employing ethnic minority construction workers to join this hazardous industry. These ethnic minority workers are prone to accidents due to communication barriers. Safety communication is playing an important role for avoiding the accidents on construction sites. However, the ethnic minority workers are not very fluent in the local language and facing safety communication problems while working with local workers. Social network analysis (SNA), being an effective tool to identify the safety communication flow on the construction site, is used to attain the measures of safety communication like centrality, density and betweenness within the ethnic minorities and local workers, and to generate sociograms that visually represent communication pattern within the effective and ineffective safety networks. The aim of this paper is to present the application of SNA for improving the safety communication of ethnic minorities in the construction industry of Hong Kong. The paper provides the theoretical background of SNA approaches for the data collection and analysis using the software UCINET and NetDraw, to determine the predominant safety communication network structure and pattern of ethnic minorities on site.
Resumo:
A number of online algorithms have been developed that have small additional loss (regret) compared to the best “shifting expert”. In this model, there is a set of experts and the comparator is the best partition of the trial sequence into a small number of segments, where the expert of smallest loss is chosen in each segment. The regret is typically defined for worst-case data / loss sequences. There has been a recent surge of interest in online algorithms that combine good worst-case guarantees with much improved performance on easy data. A practically relevant class of easy data is the case when the loss of each expert is iid and the best and second best experts have a gap between their mean loss. In the full information setting, the FlipFlop algorithm by De Rooij et al. (2014) combines the best of the iid optimal Follow-The-Leader (FL) and the worst-case-safe Hedge algorithms, whereas in the bandit information case SAO by Bubeck and Slivkins (2012) competes with the iid optimal UCB and the worst-case-safe EXP3. We ask the same question for the shifting expert problem. First, we ask what are the simple and efficient algorithms for the shifting experts problem when the loss sequence in each segment is iid with respect to a fixed but unknown distribution. Second, we ask how to efficiently unite the performance of such algorithms on easy data with worst-case robustness. A particular intriguing open problem is the case when the comparator shifts within a small subset of experts from a large set under the assumption that the losses in each segment are iid.
Resumo:
Integration of small-scale electricity generators, known as distributed generation (DG), into the distribution networks has become increasingly popular at the present. This tendency together with the falling price of the synchronous-type generator has potential to give DG a better chance at participating in the voltage regulation process together with other devices already available in the system. The voltage control issue turns out to be a very challenging problem for the distribution engineers since existing control coordination schemes would need to be reconsidered to take into account the DG operation. In this paper, we propose a control coordination technique, which is able to utilize the ability of DG as a voltage regulator and, at the same time, minimize interaction with other active devices, such as an on-load tap changing transformer and a voltage regulator. The technique has been developed based on the concept of control zone, line drop compensation, dead band, as well as the choice of controllers' parameters. Simulations carried out on an Australian system show that the technique is suitable and flexible for any system with multiple regulating devices including DG.