936 resultados para Cycle Cellulaire
Resumo:
The objective of this work was to develop and validate a mathematical model to estimate the duration of cotton (Gossypium hirsutum L. r. latifolium hutch) cycle in the State of Goiás, Brazil, by applying the method of growing degree-days (GD), and considering, simultaneously, its time-space variation. The model was developed as a linear combination of elevation, latitude, longitude, and Fourier series of time variation. The model parameters were adjusted by using multiple-linear regression to the observed GD accumulated with air temperature in the range of 15°C to 40°C. The minimum and maximum temperature records used to calculate the GD were obtained from 21 meteorological stations, considering data varying from 8 to 20 years of observation. The coefficient of determination, resulting from the comparison between the estimated and calculated GD along the year was 0.84. Model validation was done by comparing estimated and measured crop cycle in the period from cotton germination to the stage when 90 percent of bolls were opened in commercial crop fields. Comparative results showed that the model performed very well, as indicated by the Pearson correlation coefficient of 0.90 and Willmott agreement index of 0.94, resulting in a performance index of 0.85.
Resumo:
This study aimed to evaluate the influence of airflow (0.25, 0.50 and 0.75 L.L-1.min-1) and cycle time (10.45 h, 14.25 h and 17.35 h) on a sequencing batch reactor (SBR) performance in promoting nitrification and denitrification of poultry slaughterhouse wastewater. The operational stages included feeding, aerobic and anoxic reactions, sedimentation and discharge. SBR was operated in a laboratory scale with a working volume of 4 L, keeping 25% of biomass retained inside the reactor as inoculum for the next batch. In the anoxic stage, C: N ratio was maintained between 5 and 6 by adding cassava starch wastewater. A factorial design (22) with five repetitions was designed at the central point to evaluate the influence of cycle time and airflow on total inorganic nitrogen removal (N-NH4++N-NO2-+N-NO3-) and in the whole process (nitrification and denitrification). The highest total inorganic nitrogen removal (93.3%) was observed for airflow of 0.25 L.L-1.min‑1 and a cycle time of 14.25 h. At the end of the experiment, the sludge inside the reactor was characterized by fluorescent in situ hybridization (FISH), indicating the presence of ammonia and nitrite oxidizing bacteria.
Resumo:
Life cycle costing (LCC) practices are spreading from military and construction sectors to wider area of industries. Suppliers as well as customers are demanding comprehensive cost knowledge that includes all relevant cost elements through the life cycle of products. The problem of total cost visibility is being acknowledged and the performance of suppliers is evaluated not just by low acquisition costs of their products, but by total value provided through the life time of their offerings. The main purpose of this thesis is to provide better understanding of product cost structure to the case company. Moreover, comprehensive theoretical body serves as a guideline or methodology for further LCC process. Research includes the constructive analysis of LCC related concepts and features as well as overview of life cycle support services in manufacturing industry. The case study aims to review the existing LCC practices within the case company and provide suggestions for improvements. It includes identification of most relevant life cycle cost elements, development of cost breakdown structure and generic cost model for data collection. Moreover, certain cost-effective suggestions are provided as well. This research should support decision making processes, assessment of economic viability of products, financial planning, sales and other processes within the case company.
Resumo:
This thesis focuses on integration in project business, i.e. how projectbased companies organize their product and process structures when they deliver industrial solutions to their customers. The customers that invest in these solutions run their businesses in different geographical, political and economical environments, which should be acknowledged by the supplier when providing solutions comprising of larger and more complex scopes than previously supplied to these customers. This means that the suppliers are increasing their supply range by taking over some of the activities in the value chain that have traditionally been handled by the customer. In order to be able to provide the functioning solutions, including more engineering hours, technical equipment and a wider project network, a change is needed in the mindset in order to be able to carry out and take the required responsibility that these new approaches bring. For the supplier it is important to be able to integrate technical products, systems and services, but the supplier also needs to have the capabilities to integrate the cross-functional organizations and departments in the project network, the knowledge and information between and within these organizations and departments, along with inputs from the customer into the product and process structures during the lifecycle of the project under development. Hence, the main objective of this thesis is to explore the challenges of integration that industrial projects meet, and based on that, to suggest a concept of how to manage integration in project business by making use of integration mechanisms. Integration is considered the essential process for accomplishing an industrial project, whereas the accomplishment of the industrial project is considered to be the result of the integration. The thesis consists of an extended summary and four papers, that are based on three studies in which integration mechanisms for value creation in industrial project networks and the management of integration in project business have been explored. The research is based on an inductive approach where in particular the design, commissioning and operations functions of industrial projects have been studied, addressing entire project life-cycles. The studies have been conducted in the shipbuilding and power generation industries where the scopes of supply consist of stand-alone equipment, equipment and engineering, and turnkey solutions. These industrial solutions include demanding efforts in engineering and organization. Addressing the calls for more studies on the evolving value chains of integrated solutions, mechanisms for inter- and intra-organizational integration and subsequent value creation in project networks have been explored. The research results in thirteen integration mechanisms and a typology for integration is proposed. Managing integration consists of integrating the project network (the supplier and the sub-suppliers) and the customer (the customer’s business purpose, operations environment and the end-user) into the project by making use of integration mechanisms. The findings bring new insight into research on industrial project business by proposing integration of technology and engineering related elements with elements related to customer oriented business performance in contemporary project environments. Thirteen mechanisms for combining products and the processes needed to deliver projects are described and categorized according to the impact that they have on the management of knowledge and information. These mechanisms directly relate to the performance of the supplier, and consequently to the functioning of the solution that the project provides. This thesis offers ways to promote integration of knowledge and information during the lifecycle of industrial projects, enhancing the development towards innovative solutions in project business.
Resumo:
Abstract - This paper reviews existing military capability models and the capability life cycle. It proposes a holistic capability life-cycle model (HCLCM) that combines capability systems with related capability models. ISO 15288 standard is used as a framework to construct the HCLCM. The HCLCM also shows how capability models and systems relate to each other throughout the capability life cycle. The main contribution of this paper is conceptual in nature. The model complements the existing, but still evolving, understanding of the military capability life cycle in a holistic and systemic way. The model also increases understanding and facilitates communication among various military capability stakeholders.
Resumo:
The objective of this study was to evaluate the effect of medroxy-progesterone acetate (MAP) with or without estradiol benzoate (EB) on follicular growth during the estrous cycle in cattle. In the first experiment, Hereford cows were synchronized with a synthetic analogue of PGF2 alpha and were treated with two different doses of MAP (250 or 500 mg) with or without EB for 7 days starting on day 8 of the estrous cycle. Follicular growth was inhibited (P<0.05) in all cows except controls and those receiving 250mg MAP without EB. Seventy-five percent of the animals (15/20) showed estrus on days 21 and 22 of the cycle rather than at MAP withdrawal, demonstrating that these treatments did not induce estrus. To determine whether the EB treatment altered endometrial sensitivity to oxytocin and thus the luteolytic cascade, multiparous pre-synchronized cows received 5 mg of EB followed 6 hours later with 50 IU of oxytocin (OT; n=9). Eight hours after EB injection, endometrial fragments were collected from the cows on days 4, 13 and 17 of the estrous cycle and COX-2 gene expression was measured by PCR. EB increased COX-2 mRNA levels only on day 17 of the estrous cycle (P<0.05). In conclusion, MAP alone or associated with EB is able to suppress bovine follicular growth. However, EB in the presence of MAP is not efficient to induce luteolysis in cows when injected on day 8 of the estrous cycle.
Resumo:
Torque teno sus virus (TTSuV) infection is present in pig herds worldwide. It has been demonstrated that TTSuV might increase the severity of other important viral diseases with economic and public health impacts. At present, there is no information on the age distribution of pigs infected with TTSuV in Brazilian herds. This study evaluated the frequency of TTSuV infection in pigs at different stages of production. Fecal samples (n=190) from pigs at 1 to 24 weeks of age and from breeders at 6 farrow-to-weaning (up to 8 weeks of age) and 9 grower-to-finish (9 weeks of age onwards) farms in the western region of Paraná state, Brazil, were evaluated by PCR. Fragments of the 5' UTRs of TTSuV1 and/or TTSuVk2 DNAs were identified in 126 (66.3%) of the fecal samples. Significant differences were found with the percentages of positive samples for TTSuV1, TTSuVk2, and mixed infections by both genera between and within the different pig production stages. Fecal samples from the grower-to-finish farms had TTSuV detection rates (90.1%; 64/71) that were significantly (p<0.05) higher than those from the farrow-to-weaning farms (52.1%; 62/119). TTSuV detection was significantly (p<0.05) more frequent in finisher pigs than in the animals from the other stages. The UTR nucleotide sequences in this study presented higher similarities to strains from Norway (96%, TTSuV1), and Argentina and China (97.1%, TTSuVk2). These results suggest that TTSuV infection has spread to pigs of all production stages and that the viral infection rate increases with the age of the animals. In the western region of Paraná state, Brazil, TTSuV1 and TTSuVk2-induced infections were more frequently observed in suckling piglets and finisher pigs, respectively. Phylogenetic analysis pointed out the possibility of different strains of TTSuV1 and TTSuVk2 circulating in pig herds of Brazil.
Resumo:
Studies are performed in developing techniques/procedures that provide greater reproductive performance in farm animals, including pigs. In this sense, the study of gilts reproductive organs at different oestrus cycle stages for assessing the presence of abnormalities and/or other parameters that may affect the future animal fertility is important. In order to evaluate the morphological, morphometric and histomorphometric features of ovaries, uterus and uterine tubes (UTs) characteristics of prepubertal gilts at different oestrus cycle stages, reproductive tracts from 48 animals immediately after slaughter were obtained. After, the structures were dissected and removed, and the ovaries were used for classification of oestrus cycle stage of each gilt in follicular phase (FP) and luteal phase (FL). Then, morphometric evaluations of ovaries, UTs, uterine horns and uterine body were performed. Besides that, medial segments of UTs and uterus were fixed in Bouin solution, processed and included in paraffin, when histological sections of 5.0 micrometers (µm) were obtained and stained with Hematoxylin and Eosin. Histomorphometric analyzes using image capture system and specific software were performed. Afterwards, data were submitted to Student's t test for assessment the statistical differences (P<0.05) between the two different oestrus cycle stages (FP × LP) and between the placement of reproductive structures (right × left antimer). Among the gilts evaluated, 35 were in the FP and 13 in LP. There was no difference (P>0.05) between morphometric parameters of ovaries, UTs and uterus of gilts in FP and LP. Likewise, in respect to the placement of reproductive structures, both in the oestrus cycle stages, as in the general average, there was no difference (P>0.05). Regarding the histomorphometric variables, gilts classified in FP presented a higher (P<0.05) height of glandular and UT epithelium compared to animals in LP. On the other hand, the diameter of endometrial glands was higher (P<0.05) in gilts at LP compared to FP. Furthermore, gilts in LP presented a higher (P<0.05) proportion of endometrium occupied by glands, whereas animals in FP had a higher (P<0.05) proportion of connective tissue and blood vessels. In conclusion, in prepubertal gilts, the histomorphometric parameters as endometrial glands diameter, the height of glandular epithelium and of UT epithelium and the proportion of endometrium occupied by connective tissue, besides the glands and blood vessels varies through the oestrus cycle, possibly under the influence of ovarian steroids.
Resumo:
Collared peccaries (Peccary tajacu) are among the most hunted species in Latin America due the appreciation of their pelt and meat. In order to optimize breeding management of captive born collared peccaries in semiarid conditions, the objective was to describe and correlate the changes in the ovarian ultrasonographic pattern, hormonal profile, vulvar appearance, and vaginal cytology during the estrus cycle in this species. During 45 days, females (n=4) were subjected each three days to blood collection destined to hormonal dosage by enzyme immunoassay (EIA). In the same occasions, evaluation of external genitalia, ovarian ultrasonography and vaginal cytology were conducted. Results are presented as means and standard deviations. According to hormonal dosage, six estrous cycles were identified as lasting 21.0 ± 5.7 days, being on average 6 days for the estrogenic phase and 15 days for the progesterone phase. Estrogen presented mean peak values of 55.6 ± 20.5 pg/mL. During the luteal phase, the high values for progesterone were 35.3 ± 4.4 ng/mL. The presence of vaginal mucus, a reddish vaginal mucosa and the separation of the vulvar lips were verified in all animals during the estrogenic peak. Through ultrasonography, ovarian follicles measuring 0.2±0.1 cm were visualized during the estrogen peak. Corpora lutea presented hyperechoic regions measuring 0.4±0.2 cm identified during luteal phase. No significant differences (P>0.05) between proportions of vaginal epithelial cells were identified when comparing estrogenic and progesterone phases. In conclusion, female collared peccaries, captive born in semiarid conditions, have an estral cycle that lasts 21.0±5.7 days, with estrous signs characterized by vulvar lips edema and hyperemic vaginal mucosa, coinciding with developed follicles and high estrogen levels.
Resumo:
The Galea spixii inhabits semiarid vegetation of Caatinga in the Brazilian Northeast. They are bred in captivity for the development of researches on the biology of reproduction. Therefore, the aim of this study is characterize the estrous cycle of G. spixii, in order to provide information to a better knowledge of captive breeding of the species. The estrous cycle was monitored by vaginal exfoliative cytology in 12 adult females. After the detection of two complete cycles in each animal, the same were euthanized. Then, histological study of the vaginal epithelium, with three females in each phase of the estrous cycle was performed; five were paired with males for performing the control group for estrous cycle phases, and three other were used to monitor the formation and rupture of vaginal closure membrane. By vaginal exfoliative cytology, predominance of superficial cells in estrus, large intermediate cells in proestrus, intermediate and parabasal cells, with neutrophils, in diestrus and metestrus respectively was found. Estrus was detected by the presence of spermatozoa in the control group. By histology, greater proliferation of the vaginal epithelium in proestrus was observed. We conclude that the estrous cycle of G. spixii lasts 15.8 ± 1.4 days and that the vaginal closure membrane develops until complete occlusion of the vaginal ostium, breaking after few days. Future studies may reveal the importance of this fact for the reproductive success of this animal.
Resumo:
This study is a qualitative action research by its nature with elements of personal design in the form of a tangible model implementation framework construction. Utilized empirical data has been gathered via two questionnaires in relation to the arranged four workshop events with twelve individual participants. Five of them represented maintenance customers, three maintenance service providers and four equipment providers respectively. Further, there are two main research objectives in proportion to the two complementary focusing areas of this thesis. Firstly, the value-based life-cycle model, which first version has already been developed prior to this thesis, requires updating in order to increase its real-life applicability as an inter-firm decision-making tool in industrial maintenance. This first research objective is fulfilled by improving appearance, intelligibility and usability of the above-mentioned model. In addition, certain new features are also added. The workshop participants from the collaborating companies were reasonably pleased with made changes, although further attention will be required in future on the model’s intelligibility in particular as main results, charts and values were all reckoned as slightly hard to understand. Moreover, upgraded model’s appearance and added new features satisfied them the most. Secondly and more importantly, the premises of the model’s possible inter-firm implementation process need to be considered. This second research objective is delivered in two consecutive steps. At first, a bipartite open-books supported implementation framework is created and its different characteristics discussed in theory. Afterwards, the prerequisites and the pitfalls of increasing inter-organizational information transparency are studied in empirical context. One of the main findings was that the organizations are not yet prepared for network-wide information disclosure as dyadic collaboration was favored instead. However, they would be willing to share information bilaterally at least. Another major result was that the present state of companies’ cost accounting systems will definitely need implementation-wise enhancing in future since accurate and sufficiently detailed maintenance data is not available. Further, it will also be crucial to create supporting and mutually agreed network infrastructure. There are hardly any collaborative models, methods or tools currently in usage. Lastly, the essential questions about mutual trust and predominant purchasing strategies are cooperation-wise important. If inter-organizational activities are expanded, a more relational approach should be favored in this regard. Mutual trust was also recognized as a significant cooperation factor, but it is hard to measure in reality.
Resumo:
With the increasing concern of the sustainable approach of gold mining, thiosulphate has been researched as an alternative lixiviant to cyanide since cyanide is toxic to the environment. In order to investigate the possibility of thiosulphate leaching application in the coming future, life cycle assessment, is conducted to compare the environmental footprint of cyanidation and thiosulphate leaching. The result showed the most significant environmental impact of cyanidation is toxicity to human, while the ammonia of thiosulphate leaching is also a major concern of acidification. In addition, an ecosystem evaluation is also performed to indicate the potential damages caused by an example of cyanide spill at Kittilä mine, resulting in significant environmental risk cost that has to be taken into account for decision making. From the opinion collected from an online LinkedIn discussion forum, the anxiety of sustainability alone would not be enough to contribute a significant change of conventional cyanidation, until the tighten policy of cyanide use. International Cyanide Code, therefore, is crucial for safe gold production. Nevertheless, it is still thoughtful to consider the values of healthy ecosystem and the gold for long-term benefit.