961 resultados para Construction industry - Evaluation - Australia


Relevância:

100.00% 100.00%

Publicador:

Resumo:

This book will be of particular interest to academics, researchers, and graduate students at universities and industrial practitioners seeking to apply mobile and pervasive computing systems to improve construction industry productivity.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Images represent a valuable source of information for the construction industry. Due to technological advancements in digital imaging, the increasing use of digital cameras is leading to an ever-increasing volume of images being stored in construction image databases and thus makes it hard for engineers to retrieve useful information from them. Content-Based Search Engines are tools that utilize the rich image content and apply pattern recognition methods in order to retrieve similar images. In this paper, we illustrate several project management tasks and show how Content-Based Search Engines can facilitate automatic retrieval, and indexing of construction images in image databases.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

BACKGROUND: While smoking is the major cause of chronic obstructive pulmonary disease (COPD), occupational exposures to vapors, gases, dusts, and fumes (VGDF) increase COPD risk. This case-control study estimated the risk of COPD attributable to occupational exposures among construction workers. METHODS: The study population included 834 cases and 1243 controls participating in a national medical screening program for older construction workers between 1997 and 2013. Qualitative exposure indices were developed based on lifetime work and exposure histories. RESULTS: Approximately 18% (95% CI = 2-24%) of COPD risk can be attributed to construction-related exposures, which are additive to the risk contributed by smoking. A measure of all VGDF exposures combined was a strong predictor of COPD risk. CONCLUSIONS: Construction workers are at increased risk of COPD as a result of broad and complex effects of many exposures acting independently or interactively. Control methods should be implemented to prevent worker exposures, and smoking cessation should be promoted.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This study explores the special characteristics of the construction industry and develops a maturity model for measuring and improving the relationships between the key players of a construction supply chain. The model adopts the capability maturity methodology and defines four maturity levels of construction supply chain relationships. It is in a matrix format, consisting of 24 assessment criteria in eight categories at each maturity level. It also provides three different ways of using the model. The model is evaluated through a series of expert interviews. A case study is also presented to demonstrate the application of this model in practice.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose – The purpose of this study is to explore the formative development of construction supply chain guidelines or proposals in a UK region’s schools’ estates procurement process to more effectively address a forthcoming increase in investment.

Design/methodology/approach – The research approach is interpretive. Using an action research approach, repeated semi-structured interviews and focus groups with a range of stakeholders are conducted.

Findings – The current construction supply chain in schools’ estate procurement has many difficulties, not least given the highly fragmented and disconnected nature of the projects. Synergies are being missed and there is little or no continuous improvement. Drawing on these findings, the research iteratively develops a range of proposals and guidelines to address this situation.

Research limitations/implications – This research adds weight to the current focus on pressing for change in the construction industry. It presents potentially valuable insights into the benefits of partnering arrangements and how these might usefully be incorporated into schools’ estate supply chain.

Practical implications – A set of guidelines is developed to guide the public procurement of schools’ estate in a UK region. These guidelines are set within the context of the Modernising and Rethinking Construction agenda.

Originality/value – The action research approach enabled the researchers to gain a unique insight into how public procurement and contractor personnel interact and to establish effective practical guidelines.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The construction industry is inherently hazardous, with a significant number of accidents and incidents occurring, particularly on confined construction sites. This research identifies, clarifies and tabulates the various managerial health and safety issues encountered on confined construction sites, based on a qualitative approach, to aid in the management of the complex health and safety concerns. The methodology is based on qualitative research incorporating case studies, interviews, causal loop diagrams and mind mapping. The key findings in the managerial issues in the management of health and safety on confined construction sites can be summarised as follows; (1) A lack of space, (2) Increased management of site personnel, (3) Overcrowding of the work place. The implication for the industry is that due to the sustained development of urban centres on a global scale, coupled with the increasing complexity of architectural designs, the majority of on-site project management professionals are faced with the onerous task of completing often intricate designs within a limited spatial environment, under strict health and safety parameters. The value of such research is to aid management professionals successfully identify the various managerial issues highlighted, resulting in the successful management of health and safety on a confined construction site.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The construction industry is inherently risky, with a significant number of accidents and disasters occurring, particularly on confined construction sites. This research investigates and identifies the various issues affecting successful management of health and safety in confined construction sites. The rationale is that identifying the issues would assist the management of health and safety particularly in inner city centres which are mostly confined sites. Using empiricism epistemology, the methodology was based on qualitative research approach by means of multiple case studies in three different geographical locations of Ireland, UK and USA. Data on each case study were collected through individual interviews and focus group discussion with project participants. The findings suggest that three core issues are the underlying factors affecting management of health and safety on confined construction sites. It include, (i) lack of space, (ii) problem of co-ordination and management of site personnel, and (iii) overcrowding of workplace. The implication of this is that project teams and their organisations should see project processes from a holistic point of view, as a unified single system, where quick intervention in solving a particular issue should be the norm, so as not to adversely affect interrelated sequence of events in project operations. Proactive strategies should be devised to mitigate these issues and may include detail project programming, space management, effective constructability review and efficient co-ordination of personnel, plant and materials among others. The value of this research is to aid management and operation of brownfield sites by identifying issues impacting on health and safety management in project process.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose – The purpose of this paper is to identify, clarify and tabulate the various managerial issues encountered, to aid in the management of the complex health and safety concerns which occur within a confined construction site environment.

Design/methodology/approach – This is achieved through conducting extensive qualitative and qualitative research in the form of case studies, interviews and questionnaire survey.

Findings – The leading managerial issues in the management of health and safety on a confined construction site are found to be: “Difficulty to move materials around site safely”; “Lack of adequate room for the effective handling of materials”; “Difficulty in ensuring site is tidy and all plant and materials are stored safely”; “Close proximity of individuals to operation of large plant and machinery”; and joint fifth “Difficulty in ensuring proper arrangement and collection of waste materials on-site” along with “Difficulty in controlling hazardous materials and equipment on site”.

Practical implications – The resulting implication for practice of these results can be summarised by identifying that with sustained development of urban centres on a global scale, coupled with the increasing complexity of architectural designs, the majority of on-site project management professionals are faced with the onerous task of completing often intricate designs within a limited spatial environment, under strict health and safety parameters.

Originality/value – The subsequent value of the findings are such that just as on-site management professionals successfully identify the various managerial issues highlighted, the successful management of health and safety on a confined construction site is attainable.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

There has been an increasing highlight of supply chain collaboration in UK construction. However, few studies have provided evidence for the current status. Based on the analysis of over 100 questionnaire responses in this research, it is found that the UK construction industry as a whole is experiencing an important change and moving towards supply chain collaboration. On the other hand, an unbalance is found for the change movement. In addition to the questionnaire survey, a series of expert interviews help to explore the specific characteristics of supply chain collaboration in construction and provide practical implications for collaboration strategy implementation.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose - To identify the critical factors causing construction disputes in Small to Medium Enterprises (SMEs) in Ireland during the recent recession period of 2007 to 2013.
Design/Methodology/Approach - A mixed method approach incorporating a literature review, case studies and questionnaire survey, with results analysed using exploratory (data reduction) factor analysis.
Findings - The results indicate seven core critical factors which result in construction disputes in SMEs in Ireland during a recession: Payment and extras; Physical work conditions; Poor financial/legal practise; Changes to the agreed scope of works; Time overrun; Defects; and Requests for increase in speed of project and long-term defects.
Research Limitations/Implications - With Ireland emerging from the current economic recession and the prevalence of SMEs to the construction sector, it is essential to document the core critical factors of construction disputes which emerge within this particular segment of the built environment.
Practical Implications - To address the adversarial nature of the construction sector and the prevalence of SMEs, it is essential to identify and document the critical factors of construction disputes within this remit. It is envisaged that the results of this research will be acknowledged, and the recommendations adopted, by construction SMEs, particularly within Ireland, as they emerge from the economic recession.
Originality/Value - This paper fulfils a gap in knowledge with the emergence of the economic recession and the identification of critical factors of construction dispute within SMEs in the Irish construction industry.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This research book covers the major aspects relating to the use of novel delivery systems in enhancing both transdermal and intradermal drug delivery. It provides a review of transdermal and intradermal drug delivery, including the history of the field and the various methods employed to produce delivery systems from different materials such as device design, construction and evaluation, so as to provide a sound background to the use of novel systems in enhanced delivery applications.

Furthermore, it presents in-depth analyses of recent developments in this exponentially growing field, with a focus on microneedle arrays, needle-free injections, nanoparticulate systems and peptide-carrier-type systems. It also covers conventional physical enhancement strategies, such as tape-stripping, sonophoresis, iontophoresis, electroporation and thermal/suction/laser ablation Discussions about the penetration of the stratum corneum by the various novel strategies highlight the importance of the application method. Comprehensive and critical reviews of transdermal and intradermal delivery research using such systems focus on the outcomes of in vivoanimal and human studies. The book includes laboratory, clinical and commercial case studies featuring safety and patient acceptability studies carried out to date, and depicts a growing area for use of these novel systems is in intradermal vaccine delivery. The final chapters review recent patents in this field and describe the work ongoing in industry.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Building Information Modelling (BIM) is continuing to evolve and develop as the construction industry progresses towards level 2 maturity. However, one of the core barriers in this progression is the aspect of interoperability between software packages. This research and paper stems from a Knowledge Transfer Partnership (KTP) where both industry and academia come together to address this shortcoming within the sector. One of the core objectives of this partnership and the aim of this study is investigating potential solutions to this barrier, while also developing best working practices to be applied in industry. Using one of the case studies from this partnership (a temporary steel structure), this paper demonstrates a potential solution to addressing interoperability within structural analysis and detailing packages, MasterSeries and Revit respectively. The findings of the research indicate that a process based approach rather than that of additional software coding as being the preferred solution. The results of this preliminary research will aid in the development of the topic of interoperability within the sector, while also developing the knowledge and competencies of the parties within the KTP. The findings are explored further, by providing an overview of the resolution process adopted in this case study, in overcoming the interoperability that arose as the project progressed. It is envisaged that this study will assist the construction sector and its adoption of BIM technologies, while also addressing the critical aspect of operability between software.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The construction industry wants graduate employees skilled in relationship building and information technology and communications (ITC). Much of the relationship building at universities has evolved through technology. Government and the ITC industry fund lobby groups to influence both educational establishments and Government to incorporate more ITC in education _ and ultimately into the construction industry. This influencing ignores the technoskeptics’ concerns about student disengagement through excessive online distractions. Construction studies students (n=64) and lecturers (n=16) at a construction university were surveyed to discover the impact of the use and applications of ITC. Contrary to Government and industry technopositivism, construction students and lecturers preferred hard copy documents to online feedback for assignments and marking, more human interface and less technological substitution and to be on campus for lectures and face-to-face meetings rather than viewing on-screen. ITC also distracted users from tasks which, in the case of students, prevented the development of the concentration and deep thinking which a university education should deliver. The research findings are contrary to the promotions of Government, ITC industry and ITC departments and have implications for construction employers where a renewed focus on human communication should mean less stress, fewer delays and cost overruns.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Trabalho de Projeto

Relevância:

100.00% 100.00%

Publicador:

Resumo:

When concrete deterioration begins to occur in highway pavement, repairs become necessary to assure the rider safety, extend its useful life and restore its riding qualities. One rehabilitation technique used to restore the pavement to acceptable highway standards is to apply a thin portland cement concrete (PCC) overlay to the existing pavement. First, any necessary repairs are made to the existing pavement, the surface is then prepared, and the PCC overlay is applied. Brice Petrides-Donohue, Inc. (Donohue) was retained by the Iowa Department of Transportation (IDOT) to evaluate the present condition with respect to debonding of the PCC overlay at fifteen sites on Interstate 80 and State Highway 141 throughout the State of Iowa. This was accomplished by conducting an infrared thermographic and ground penetrating radar survey of these sites which were selected by the Iowa Department of Transportation. The fifteen selected sites were all two lanes wide and one-tenth of a mile long, for a total of three lane miles or 190,080 square feet. The selected sites are as follows: On Interstate 80 Eastbound, from milepost 35.25 to 35.35, milepost 36.00 to 36.10, milepost 37.00 to 37.10, milepost 38.00 to 38.10 and milepost 39.00 to 39.10, on State Highway 141 from milepost 134.00 to 134.10, milepost 134.90 to milepost 135.00, milepost 135.90 to 136.00, milepost 137.00 to 137.10 and milepost 138.00 to 138.10, and on Interstate 80 Westbound from milepost 184.00 to 184.10, milepost 185.00 to 185.10, milepost 186.00 to 186.10, milepost 187.00 to 187.10, and from milepost 188.00 to 188.10.