896 resultados para Aligning HR


Relevância:

20.00% 20.00%

Publicador:

Resumo:

One significant benefit of asphalt concrete pavement construction is that it may be opened to traffic within one hour after being laid. Therefore, road closure and detour are not necessary, but only temporary lane closure and control of traffic. This one lane construction, even though desirable in regard to maintaining traffic flow, does pose an additional problem. The longitudinal joint at centerline often becomes a maintenance problem. The objective of this research project is to identify construction procedures that will provide an improved centerline joint.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

County engineers in Iowa face the dual problems of rapidly escalating costs and a decreasing rate of growth of revenues. Various priority systems are in use, ranking projects for inclusion in road improvement programs, but they generally have weaknesses when used to compare one project with another in a different location. The sufficiency rating system has proven to be a useful tool in developing a priority list of projects for primary road systems, but there are none currently in use for secondary road systems. Some elements of an existing system used for primary roads could be modified for use with secondary roads, but would require extensive changes. The research reported here, sponsored by the Iowa Department of Transportation, was undertaken to develop a sufficiency rating system which could be used for secondary roads in Iowa and to produce the necessary forms and instructions to aid county engineering personnel in their efforts to complete the ratings for roads within their county. If a usable system were available that would yield reasonable results, county engineers would have an additional tool available to assist them in arriving at a defensible road improvement program.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The major objective of this research project is to investigate how fly ash influences the chemical durability of portland cement based materials. The testing program is evaluating how Iowa fly ashes influence the sulfate durability of portland cement-fly ash pastes, mortars, and concretes. Also, alkali-reactivity studies are being conducted on mortar bar specimens prepared in accordance with ASTM C 311. Prelimary sulfate test results, based only on mortar bar studies, indicate that only the very high-calcium fly ash (29 percent CaO, by weight) consistently reduced the durability of test specimens exposed to a solution containing 5 percent sodium sulfate. The remaining four fly ashes that were used in the study showed negligible to dramatic increases in sulfate resistance. Concrete specimens were only beginning to respond to the sulfate solutions after about one year of exposure; and hence, considerably more time will be needed to assess their performance. Preliminary results from the alkali-reactivity tests have indicated that the Oreopolis aggregate is not sensitive to alkali attack. However, some of the test results have indicated that the testing procedure may be prone to delayed expansion due to the presence of periclase (MgO) in the Class C fly ashes. Research is being planned to: (1) verify if the periclase is influencing test results; and (2) estimating the magnitude of the potential error.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A recommended minimum thickness for prestressed concrete (P/C) bridge deck panels containing 3/8-in. diameter, 270-ksi, low-relaxation, grit-impregnated, epoxy-coated prestressing strands is being evaluated by testing prototype panel specimens. As of January 1994, specimens from ten castings have been tested. The specimens in the first five castings were constructed to establish a preliminary minimum thickness for P/C panels. The specimens in the last five castings were constructed to 1) confirm the minimum panel thickness requirement, 2) measure the development length of epoxy-coated strands in specimens containing multiple strands, 3) measure the development length of uncoated strands in specimens containing multiple and single strands, 4) observe if concrete cracks form in thin panel specimens that have a raked top surface and are reinforced with welded wire fabric and either epoxy-coated or uncoated strands, 5) measure the transfer length for specimens containing a single uncoated strand, and 6) observe the seating characteristics of the grips used for uncoated strand and epoxy-coated strands. These tests have produced several initial findings. The preliminary recommended thickness for P/C panels containing grit-impregnated, epoxy-coated strands is 3 in. and the tentative development length for uncoated and coated multiple strands is approximately 45 in. and 24 in., respectively. Further tests will address confirmation of the recommended P/C panel thickness and establish the transfer and development lengths of single and multiple, uncoated and grit-impregnated epoxy-coated strands.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The overall objective of this experimental program was to obtain quantitative comparisons between leaded and nonleaded gasolines as used in a variety of Iowa State Highway Connnission vehicles. These quantitative comparisons were to be made in terms of exhaust emissions, maintenance costs and fuel economy.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This demonstration project consisted of three adjacent highway resurfacing projects using asphalt cement concrete removed from an Interstate highway which had become severely rutted.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The following report summarizes research activities on the project for the period December 1, 1985 through November 31, 1986. Research efforts for the first year have proceeded basically as outlined in the project proposal.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The following report summarizes research activities on the project for the period December 1, 1986 to November 30, 1987. Research efforts for the second year deviated slightly from those described in the project proposal. By the end of the second year of testing, it was possible to begin evaluating how power plant operating conditions influenced the chemical and physical properties of fly ash obtained from one of the monitored power plants (Ottumwa Generating Station, OGS). Hence, several of the tasks initially assigned to the third year of the project (specifically tasks D, E, and F) were initiated during the second year of the project. Manpower constraints were balanced by delaying full scale implementation of the quantitative X-ray diffraction and differential thermal analysis tasks until the beginning of the third year of the project. Such changes should have little bearing on the outcome of the overall project.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A research project entitled "Residual Stresses and Fatigue Behavior of Welded Structural Members" was conducted at the Structural Research Laboratory of the Engineering Research Institute at Iowa State University under the sponsorship of the Iowa State Highway Commission. The objective of the project was to study experimentally the fatigue behavior of flange plates in welded beam sections as influenced by different residual stress distributions which are caused by different sizes of welds.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This project was initiated to gain a better understanding of the phenomena which affect the engineering behavior of soils containing colloidal size particles and to find chemical methods of treatment which could improve the engineering performance of such soils.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This project was initiated to gain a better understanding of the phenomena which affect the engineering behavior of soils containing colloidal size particles and to find chemical methods of treatment which could improve the engineering performance of such soils.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Fruitful research on durability of paving asphalts may come from two approaches: The improvement of the asphalt for durability; The development of relatively rapid laboratory tests which will enable the design engineer to select or to specify an asphalt based on quality and to make a correct estimate of the service life of a selected asphalt when used in a specific paving mixture. Research Project HR-124, "Development of a Laboratory Durability Test for Asphalts," sponsored by the Iowa Highway Research Board is in the second category and was intended to be the initial stage of an overall study in the development of a durability test for paving asphalts.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Behavior of granular material subjected to repeated load triaxial compression tests is characterized by a model based on rate process theory. Starting with the Arrhenius equation from chemical kinetics, the relationship of temperature, shear stress, normal stress and volume change to deformation rate is developed. The proposed model equation includes these factors as a product of exponential terms. An empirical relationship between deformation and the cube root of the number of stress applications at constant temperature and normal stress is combined with the rate equation to yield an integrated relationship of temperature, deviator stress, confining pressure and number of deviator stress applications to axial strain. The experimental program consists of 64 repeated load triaxial compression tests, 52 on untreated crushed stone and 12 on the same crushed stone material treated with 4% asphalt cement. Results were analyzed with multiple linear regression techniques and show substantial agreement with the model equations. Experimental results fit the rate equation somewhat better than the integrated equation when all variable quantities are considered. The coefficient of shear temperature gives the activation enthalpy, which is about 4.7 kilocalories/mole for untreated material and 39.4 kilocalories/mole for asphalt-treated material. This indicates the activation enthalpy is about that of the pore fluid. The proportionality coefficient of deviator stress may be used to measure flow unit volume. The volumes thus determined for untreated and asphalt-treated material are not substantially different. This may be coincidental since comparison with flow unit volumes reported by others indicates flow unit volume is related to gradation of untreated material. The flow unit volume of asphalt-treated material may relate to asphalt cement content. The proposed model equations provide a more rational basis for further studies of factors affecting deformation of granular materials under stress similar to that in pavement subjected to transient traffic loads.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The routine use of integral abutments to tie bridge superstructures to foundation piling began in this country about 30 years ago. Kansas, Missouri, Ohio, North Dakota, and Tennessee were some of the early users. This method of construction has steadily grown more popular. Today more than half of the state highway agencies have developed design criteria for bridges without expansion joint devices.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Research activities during this period concentrated on continuation of field and laboratory testing for the Dallas County test road. Stationary ditch collection of dust was eliminated because of inconsistent data, and because of vandalism to collectors. Braking tests were developed and initiated to evaluate the influence of treatments on braking and safety characteristics of the test sections. Dust testing was initiated for out of the wheelpath conditions as well as in the wheelpath. Contrary to the results obtained during the summer and fall of 1987, the 1.5 percent bentonite treatment appears to be outperforming the other bentonite treated sections after over a year of service. Overall dust reduction appears to average between 25 to 35 percent. Dallas County applied 300 tons per mile of class A roadstone maintenance surfacing to the test road in August 1988. Test data indicates that the bentonite is capable of interacting and functioning to reduce dust generation of the new surfacing material. Again, the 1.5 percent bentonite treatment appeared the most effective. The fine particulate bonding and aggregation mechanism of the bentonite appears recoverable from the environmental effects of winter, and from alternating wet and dry road surface conditions. The magnesium chloride treatment appears capable of long-term (over one year) dust reduction and exhibited an overall average reduction in the range of 15 to 30 percent. The magnesium chloride treatment also appears capable of interacting with newly applied crushed stone to reduce dust generation. Two additional one mile test roads were to have been constructed early this year. Due to an extremely dry spring and summer, construction scheduling was not possible until August. This would have allowed only minimal data collection. Considering this and the fact that this was an atypically dry summer, it was our opinion that it would be in the best interest of the research project to extend the project (at no additional cost) for a period of one year. The two additional test roads will be constructed in early spring 1989 in Adair and Marion counties.