853 resultados para objective assessment


Relevância:

20.00% 20.00%

Publicador:

Resumo:

As a part of vital infrastructure and transportation networks, bridge structures must function safely at all times. However, due to heavier and faster moving vehicular loads and function adjustment, such as Busway accommodation, many bridges are now operating at an overload beyond their design capacity. Additionally, the huge renovation and replacement costs always make the infrastructure owners difficult to undertake. Structural health monitoring (SHM) is set to assess condition and foresee probable failures of designated bridge(s), so as to monitor the structural health of the bridges. The SHM systems proposed recently are incorporated with Vibration-Based Damage Detection (VBDD) techniques, Statistical Methods and Signal processing techniques and have been regarded as efficient and economical ways to solve the problem. The recent development in damage detection and condition assessment techniques based on VBDD and statistical methods are reviewed. The VBDD methods based on changes in natural frequencies, curvature/strain modes, modal strain energy (MSE) dynamic flexibility, artificial neural networks (ANN) before and after damage and other signal processing methods like Wavelet techniques and empirical mode decomposition (EMD) / Hilbert spectrum methods are discussed here.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper uses dynamic computer simulation techniques to apply a procedure using vibration-based methods for damage assessment in multiple-girder composite bridge. In addition to changes in natural frequencies, this multi-criteria procedure incorporates two methods, namely the modal flexibility and the modal strain energy method. Using the numerically simulated modal data obtained through finite element analysis software, algorithms based on modal flexibility and modal strain energy change before and after damage are obtained and used as the indices for the assessment of structural health state. The feasibility and capability of the approach is demonstrated through numerical studies of proposed structure with six damage scenarios. It is concluded that the modal strain energy method is competent for application on multiple-girder composite bridge, as evidenced through the example treated in this paper.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The service-orientation paradigm has not only become prevalent in the software systems domain in recent years, but is also increasingly applied on the business level to restructure organisational capabilities. In this paper, we present the results of an extensive literature review of 30 approaches related to service identification and analysis for both domains. Based on the consolidation of a superset of comparison criteria for service-oriented methodologies found in related literature, we compare and evaluate the different characteristics of service engineering methods with a focus on service analysis. Although a close business and IT alignment is regarded as one of the core beneficial promises of service-orientation, our analysis suggests that there is a lack of unified, comprehensive methodology for service identification and analysis integrating and addressing both domains. Thus, we discuss how our results can inform directions for future research in this area.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Background The accurate measurement of Cardiac output (CO) is vital in guiding the treatment of critically ill patients. Invasive or minimally invasive measurement of CO is not without inherent risks to the patient. Skilled Intensive Care Unit (ICU) nursing staff are in an ideal position to assess changes in CO following therapeutic measures. The USCOM (Ultrasonic Cardiac Output Monitor) device is a non-invasive CO monitor whose clinical utility and ease of use requires testing. Objectives To compare cardiac output measurement using a non-invasive ultrasonic device (USCOM) operated by a non-echocardiograhically trained ICU Registered Nurse (RN), with the conventional pulmonary artery catheter (PAC) using both thermodilution and Fick methods. Design Prospective observational study. Setting and participants Between April 2006 and March 2007, we evaluated 30 spontaneously breathing patients requiring PAC for assessment of heart failure and/or pulmonary hypertension at a tertiary level cardiothoracic hospital. Methods SCOM CO was compared with thermodilution measurements via PAC and CO estimated using a modified Fick equation. This catheter was inserted by a medical officer, and all USCOM measurements by a senior ICU nurse. Mean values, bias and precision, and mean percentage difference between measures were determined to compare methods. The Intra-Class Correlation statistic was also used to assess agreement. The USCOM time to measure was recorded to assess the learning curve for USCOM use performed by an ICU RN and a line of best fit demonstrated to describe the operator learning curve. Results In 24 of 30 (80%) patients studied, CO measures were obtained. In 6 of 30 (20%) patients, an adequate USCOM signal was not achieved. The mean difference (±standard deviation) between USCOM and PAC, USCOM and Fick, and Fick and PAC CO were small, −0.34 ± 0.52 L/min, −0.33 ± 0.90 L/min and −0.25 ± 0.63 L/min respectively across a range of outputs from 2.6 L/min to 7.2 L/min. The percent limits of agreement (LOA) for all measures were −34.6% to 17.8% for USCOM and PAC, −49.8% to 34.1% for USCOM and Fick and −36.4% to 23.7% for PAC and Fick. Signal acquisition time reduced on average by 0.6 min per measure to less than 10 min at the end of the study. Conclusions In 80% of our cohort, USCOM, PAC and Fick measures of CO all showed clinically acceptable agreement and the learning curve for operation of the non-invasive USCOM device by an ICU RN was found to be satisfactorily short. Further work is required in patients receiving positive pressure ventilation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper discusses the different perceptions of first year accounting students about their tutorial activities and their engagements in assessment. As the literature suggests, unless participation in learning activities forms part of graded assessment, it is often difficult to engage students in these activities. Using an action research model, this paper reports the study of first year accounting students' responses to action-oriented learning tasks in tutorials. The paper focuses on the importance of aligning curriculum objectives, learning and teaching activities and assessment, i.e. the notion of constructive alignment. However, as the research findings indicate, without support at institutional level, applying constructive alignment to facilitate quality student learning outcomes is a difficult task. Thus, the impacts of policy constraints on curriculum issues are also discussed, focusing on the limitations faced by tutors and their lack of involvement in curriculum development.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Objectives The procurement research of Sydney Opera House FM Exemplar Project aims to develop innovative methods and guidelines for the procurement of FM services, applicable to iconic and / or performing arts centre facilities, or facilities with similar FM functions. The initial procurement report in June 2005 analysed the strategic objectives and operational requirements that provide ‘demand statements’ as evaluation criteria in the service procurement process. The subsequent interim procurement report in September 2005 discussed the elements contributing to the criteria for decision-making in the service procurement process. This procurement report concentrates on the research on procurement strategies and innovative methods using a case study approach. The objectives of this report are: • to investigate service procurement methods and process in iconic and/or performing arts centre facilities; • to showcase FM innovation in Sydney Opera House through a case study; • to establish a preliminary decision-making framework and guidelines for selection of appropriate FM procurement routes to provide a useful model for FM community. Findings Findings from this procurement research are presented as follows. • FM innovation and experience of Sydney Opera House • Innovative procurement methods and processes, drawn from a case study of Sydney Opera House as exemplar • An integrated performance framework to link maintenance service functions to high level organisational objective and strategies • Procurement methods and contract outcomes, focusing on building maintenance and cleaning services of Sydney Opera House • Multi-dimensional assessment of Service Providers • General decision-making strategies and guidelines for selection of appropriate FM procurement routes Further Research Whilst the Sydney Opera House case study emphasises the experience of Sydney Opera House, a study of procurement strategies and methods from published research and FM good practice will supply facilities managers with alternative procurement routes. Further research on the procurement theme will develop a final decision-making model for the procurement of FM services, drawn from the evaluation of the case study outcomes, as well as FM good practice and findings from current published research.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Objective The review addresses two distinct sets of issues: 1. specific functionality, interface, and calculation problems that presumably can be fixed or improved; and 2. the more fundamental question of whether the system is close to being ready for ‘commercial prime time’ in the North American market. Findings Many of our comments relate to the first set of issues, especially sections B and C. Sections D and E deal with the second set. Overall, we feel that LCADesign represents a very impressive step forward in the ongoing quest to link CAD with LCA tools and, more importantly, to link the world of architectural practice and that of environmental research. From that perspective, it deserves continued financial support as a research project. However, if the decision is whether or not to continue the development program from a purely commercial perspective, we are less bullish. In terms of the North American market, there are no regulatory or other drivers to press design teams to use a tool of this nature. There is certainly interest in this area, but the tools must be very easy to use with little or no training. Understanding the results is as important in this regard as knowing how to apply the tool. Our comments are fairly negative when it comes to that aspect. Our opinion might change to some degree when the ‘fixes’ are made and the functionality improved. However, as discussed in more detail in the following sections, we feel that the multi-step process — CAD to IFC to LCADesign — could pose a serious problem in terms of market acceptance. The CAD to IFC part is impossible for us to judge with the information provided, and we can’t even begin to answer the question about the ease of using the software to import designs, but it appears cumbersome from what we do know. There does appear to be a developing North American market for 3D CAD, with a recent survey indicating that about 50% of the firms use some form of 3D modeling for about 75% of their projects. However, this does not mean that full 3D CAD is always being used. Our information suggests that AutoDesk accounts for about 75 to 80% of the 3D CAD market, and they are very cautious about any links that do not serve a latent demand. Finally, other system that link CAD to energy simulation are using XML data transfer protocols rather than IFC files, and it is our understanding that the market served by AutoDesk tends in that direction right now. This is a subject that is outside our area of expertise, so please take these comments as suggestions for more intensive market research rather than as definitive findings.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Cooperative Research Centre for Construction Innovation (CRC CI) is a national research, development and implementation centre focused on the needs of the property, design, construction and facility management sectors. Established in 2001 and headquartered at Queensland University of Technology as an unincorporated joint venture under the Australian Government's Cooperative Research Program, the CRC CI is developing key technologies, tools and management systems to improve the effectiveness of the construction industry. The CRC CI is a seven year project funded by a Commonwealth grant and industry, research and other government support. More than 150 researchers and an alliance of 19 leading partner organisations are involved in and support the activities of the CRC CI

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Existing widely known environmental assessment models, primarily those for Life Cycle Assessment of manufactured products and buildings, were reviewed to grasp their characteristics, since the past several years have seen a significant increase in interest and research activity in the development of building environmental assessment methods. Each method or tool was assessed under the headings of description, data requirement, end-use, assessment criteria (scale of assessment and scoring/ weighting system)and present status

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This report fully summarises a project designed to enhance commercial real estate performance within both operational and investment contexts through the development of a model aimed at supporting improved decision-making. The model is based on a risk adjusted discounted cash flow, providing a valuable toolkit for building managers, owners, and potential investors for evaluating individual building performance in terms of financial, social and environmental criteria over the complete life-cycle of the asset. The ‘triple bottom line’ approach to the evaluation of commercial property has much significance for the administrators of public property portfolios in particular. It also has applications more generally for the wider real estate industry given that the advent of ‘green’ construction requires new methods for evaluating both new and existing building stocks. The research is unique in that it focuses on the accuracy of the input variables required for the model. These key variables were largely determined by market-based research and an extensive literature review, and have been fine-tuned with extensive testing. In essence, the project has considered probability-based risk analysis techniques that required market-based assessment. The projections listed in the partner engineers’ building audit reports of the four case study buildings were fed into the property evaluation model developed by the research team. The results are strongly consistent with previously existing, less robust evaluation techniques. And importantly, this model pioneers an approach for taking full account of the triple bottom line, establishing a benchmark for related research to follow. The project’s industry partners expressed a high degree of satisfaction with the project outcomes at a recent demonstration seminar. The project in its existing form has not been geared towards commercial applications but it is anticipated that QDPW and other industry partners will benefit greatly by using this tool for the performance evaluation of property assets. The project met the objectives of the original proposal as well as all the specified milestones. The project has been completed within budget and on time. This research project has achieved the objective by establishing research foci on the model structure, the key input variable identification, the drivers of the relevant property markets, the determinants of the key variables (Research Engine no.1), the examination of risk measurement, the incorporation of risk simulation exercises (Research Engine no.2), the importance of both environmental and social factors and, finally the impact of the triple bottom line measures on the asset (Research Engine no. 3).

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Principal Topic The study of the origin and characteristics of venture ideas - or ''opportunities'' as they are often called - and their contextual fit are key research goals in entrepreneurship (Davidsson, 2004). We define venture idea as ''the core ideas of an entrepreneur about what to sell, how to sell, whom to sell and how an entrepreneur acquire or produce the product or service which he/she sells'' for the purpose of this study. When realized the venture idea becomes a ''business model''. Even though venture ideas are central to entrepreneurship yet its characteristics and their effect to the entrepreneurial process is mysterious. According to Schumpeter (1934) entrepreneurs could creatively destruct the existing market condition by introducing new product/service, new production methods, new markets, and new sources of supply and reorganization of industries. The introduction, development and use of new ideas are generally called as ''innovation'' (Damanpour & Wischnevsky, 2006) and ''newness'' is a property of innovation and is a relative term which means that the degree of unfamiliarity of venture idea either to a firm or to a market. However Schumpeter's (1934) discusses five different types of newness, indicating that type of newness is an important issue. More recently, Shane and Venkataraman (2000) called for research taking into consideration not only the variation of characteristics of individuals but also heterogeneity of venture ideas, Empirically, Samuelson (2001, 2004) investigated process differences between innovative venture ideas and imitative venture ideas. However, he used only a crude dichotomy regarding the venture idea newness. According to Davidsson, (2004) as entrepreneurs could introduce new economic activities ranging from pure imitation to being new to the entire world market, highlighting that newness is a matter of degree. Dahlqvist (2007) examined the venture idea newness and made and attempt at more refined assessment of the degree and type of newness of venture idea. Building on these predecessors our study refines the assessment of venture idea newness by measuring the degree of venture idea newness (new to the world, new to the market, substantially improved while not entirely new, and imitation) for four different types of newness (product/service, method of production, method of promotion, and customer/target market). We then related type and degree of newness to the pace of progress in nascent venturing process. We hypothesize that newness will slow down the business creation process. Shane & Venkataraman (2000) introduced entrepreneurship as the nexus of opportunities and individuals. In line with this some scholars has investigated the relationship between individuals and opportunities. For example Shane (2000) investigates the relatedness between individuals' prior knowledge and identification of opportunities. Shepherd & DeTinne (2005) identified that there is a positive relationship between potential financial reward and the identification of innovative venture ideas. Sarasvathy's 'Effectuation Theory'' assumes high degree of relatedness with founders' skills, knowledge and resources in the selection of venture ideas. However entrepreneurship literature is scant with analyses of how this relatedness affects to the progress of venturing process. Therefore, we assess the venture ideas' degree of relatedness to prior knowledge and resources, and relate these, too, to the pace of progress in nascent venturing process. We hypothesize that relatedness will increase the speed of business creation. Methodology For this study we will compare early findings from data collected through the Comprehensive Australian Study of Entrepreneurial Emergence (CAUSEE). CAUSEE is a longitudinal study whose primary objective is to uncover the factors that initiate, hinder and facilitate the process of emergence and development of new firms. Data were collected from a representative sample of some 30,000 households in Australia using random digit dialing (RDD) telephone survey interviews. Through the first round of data collection identified 600 entrepreneurs who are currently involved in the business start-up process. The unit of the analysis is the emerging venture, with the respondent acting as its spokesperson. The study methodology allows researchers to identify ventures in early stages of creation and to longitudinally follow their progression through data collection periods over time. Our measures of newness build on previous work by Dahlqvist (2007). Our adapted version was developed over two pre-tests with about 80 participants in each. The measures of relatedness were developed through the two rounds of pre-testing. The pace of progress in the venture creation process is assessed with the help of time-stamped gestation activities; a technique developed in the Panel Study of Entrepreneurial Dynamics (PSED). Results and Implications We hypothesized that venture idea newness slows down the venturing process whereas relatedness facilitates the venturing process. Results of 600 nascent entrepreneurs in Australia indicated that there is marginal support for the hypothesis that relatedness assists the gestation progress. Newness is significant but is the opposite sign to the hypothesized. The results give number of implications for researchers, business founders, consultants and policy makers in terms of better knowledge of the venture creation process.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In architectural design and the construction industry, there is insufficient evidence about the way designers collaborate in their normal working environments using both traditional and digital media. It is this gap in empirical evidence that the CRC project, “Team Collaboration in High Bandwidth Virtual Environments” addresses. The project is primarily, but not exclusively, concerned with the conceptual stages of design carried out by professional designers working in different offices. The aim is to increase opportunities for communication and interaction between people in geographically distant locations in order to improve the quality of collaboration. In order to understand the practical implications of introducing new digital tools on working practices, research into how designers work collaboratively using both traditional and digital media is being undertaken. This will involve a series of empirical studies in the work places of the industry partners in the project. The studies of collaboration processes will provide empirical results that will lead to more effective use of virtual environments in design and construction processes. The report describes the research approach, the industry study, the methods for data collection and analysis and the foundation research methodologies. A distinctive aspect is that the research has been devised to enable field studies to be undertaken in a live industrial environment where the participant designers carry out real projects alongside their colleagues and in familiar locations. There are two basic research objectives: one is to obtain evidence about design practice that will inform the architecture and construction industries about the impact and potential benefit of using digital collaboration technologies; the second is to add to long term research knowledge of human cognitive and behavioural processes based on real world data. In order to achieve this, the research methods must be able to acquire a rich and heterogeneous set of data from design activities as they are carried out in the normal working environment. This places different demands upon the data collection and analysis methods to those of laboratory studies where controlled conditions are required. In order to address this, the research approach that has been adopted is ethnographic in nature and case study-based. The plan is to carry out a series of indepth studies in order to provide baseline results for future research across a wider community of user groups. An important objective has been to develop a methodology that will produce valid, significant and transferable results. The research will contribute to knowledge about how architectural design and the construction industry may benefit from the introduction of leading edge collaboration technologies. The outcomes will provide a sound foundation for the production of guidelines for the assessment of high bandwidth tools and their future deployment. The knowledge will form the basis for the specification of future collaboration products and collaboration processes. This project directly addresses the industry-identified focus on cultural change, image, e-project management, and innovative methods.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This feasibility study was established to investigate the application of the concept of ‘best value’ in construction procurement in Australia. In the case of ‘best value’ in the business enterprise, ‘best value’ is that which returns greatest value to the business enterprise’s shareholders. However, in the case of the public sector, ‘best value’ is more complex. For that reason, this research project focuses mainly on public sector construction project procurement.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Objective: To describe the extent and nature of demonstrated professional partnerships between occupational therapists and Aboriginal health workers in rural and remote communities of North Queensland. The study identifies ways in which professional partnerships improve client services and enhance occupational therapy outcomes through exploring the aspects of communication, collaboration and bridging cultural boundaries.---------- Design: Data collected via in-depth, semistructured telephone interviews. ---------- Setting: Aboriginal and mainstream health and human service organisations in rural and remote North Queensland. Rural and remote areas were identified using the Accessibility and Remoteness Index of Australia codes. ---------- Participants: Seven participants working in rural and remote areas of North Queensland, comprising four occupational therapists and three Aboriginal health workers. All participants were female. ---------- Results: Participants identified five core themes when describing the extent and nature of professional partnerships between occupational therapists and Aboriginal health workers. Themes include: professional interaction; perception of professional roles; benefits to the client; professional interdependence; and significance of Aboriginal culture. According to participants, when partnerships between occupational therapists and Aboriginal health workers were formed, clients received a more culturally appropriate service, were more comfortable in the presence of the occupational therapist, obtained a greater understanding of occupational therapy assessment and intervention, and felt valued in the health care process. ---------- Conclusions: This study substantiates the necessity for the formation of professional partnerships between occupational therapists and Aboriginal health workers. The findings suggest that participation in professional partnerships has positive implications for occupational therapists working with Aboriginal clients and Aboriginal health workers in rural and remote regions of North Queensland.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A need for an efficient life care management of building portfolio is becoming increasingly due to increase in aging building infrastructure globally. Appropriate structural engineering practices along with facility management can assist in optimising the remaining life cycle costs for existing public building portfolio. A more precise decision to either demolish, refurbish, do nothing or rebuilt option for any typical building under investigation is needed. In order to achieve this, the status of health of the building needs to be assessed considering several aspects including economic and supply-demand considerations. An investment decision for a refurbishment project competing with other capital works and/or refurbishment projects can be supported by emerging methodology residual service life assessment. This paper discusses challenges in refurbishment projects of public buildings and with a view towards development of residual service life assessment methodology