965 resultados para finishing period
Resumo:
Selostus: Ruisvehnälajikkeiden Ulrika ja Moreno rehuarvo lihasikojen ruokinnassa
Resumo:
Report on a special investigation of the City of Menlo for the period January 1, 2001 through May 31, 2013
Resumo:
Report on a special investigation of the Cerro Gordo County Management Information Systems (MIS) Department for the period January 1, 2008 through July 31, 2013
Resumo:
Examination report on the City of Manly, Iowa for the period July 1, 2012 through June 30, 2013
Resumo:
Examination report on the City of Hamburg, Iowa for the period July 1, 2012 through June 30, 2013
Resumo:
Examination report on the City of Villisca, Iowa for the period July 1, 2012 through June 30, 2013
Resumo:
Examination report on the Villisca Municipal Power Plant in Villisca, Iowa for the period January 1, 2013 through December 31, 2013
Resumo:
Examination report on the City of Ocheyedan, Iowa for the period July 1, 2012 through June 30, 2013
Resumo:
Report on a review of the Central Procurement Enterprise (CPE) of the Iowa Department of Administrative Services for the period July 1, 2009 through March 31, 2013
Resumo:
Pavements have been overlaid with thin bonded portland cement concrete (PCC) for several years. These projects have had traffic detoured for a period of 5-10 days. These detours are unacceptable to the traveling public and result in severe criticism. The use of thin bonded fast track overlay was promoted to allow a thin bonded PCC overlay with minimal disruption of local traffic. This project demonstrated the concept of using one lane of the roadway to maintain traffic while the overlay was placed on the other and then with the rapid strength gain of the fast track concrete, the construction and local traffic is maintained on the newly placed, thin bonded overlay. The goals of this project were: 1. Traffic usage immediately after placement and finishing. 2. Reduce traffic disruption on a single lane to less than 5 hours. 3. Reduce traffic disruption on a given section of two-lane roadway to less than 2 days. 4. The procedure must be economically viable and competitive with existing alternatives. 5. Design life for new construction equivalent to or in excess of conventional pavements. 6. A 20 year minimum design life for rehabilitated pavements.
Resumo:
Examination report on the City of Ely, Iowa for the period July 1, 2012 through June 30, 2013
Resumo:
Examination report on the City of Maharishi Vedic City, Iowa for the period July 1, 2012 through June 30, 2013
Examination report on the City of Blue Grass, Iowa for the period July 1, 2012 through June 30, 2013
Resumo:
Examination report on the City of Blue Grass, Iowa for the period July 1, 2012 through June 30, 2013
Resumo:
Report on a special investigation of the University of Iowa Athletic Ticket Office and the operations of the Hawkeye Express for the period September 1, 2005 through November 30, 2013
Resumo:
Report on a special investigation of the Malvern Public Library for the period July 1, 2006 through October 31, 2013