885 resultados para Statements truck
Resumo:
A sample of 675 elementary school children in Grades 3-7 were administered the Self-talk Inventory and the Significant Others' Statements Inventory. The psychometric properties of both scales were investigated and the relationships between positive and negative self-talk and significant others' (parents, teachers, siblings and peers) positive and negative statements were explored using correlational and multiple regression analyses. Sex and age differences were also examined. The significant relationships and differences are described.
Resumo:
Overloading truck traffic is an untenable problem around the world. The occurrence of overloaded truck traffic can be evidence of rapid development of an economy. Most of the developing countries emphasize the development of economy, thus supporting reform of infrastructure is limited. This research investigates the relationship between truck overloading and the condition of road damage. The objective of this research is to determine the amount of economic loss due to overloaded truck traffic is. Axle load will be used to calculate the total ESAL to pavement. This study intends to provide perspective on the relationship between change in axle load due to overloading and the resultant service life of pavement. It can then be used in the estimation of pavement damage in other developing countries facing the problem of truck overloading. In conclusion, economical loss was found, which include reduction of pavement life and increase in maintenance and rehabilitation (M&R) cost. As a result, net present value (NPV) of pavement investment with overloading truck traffic is higher than normal truck traffic.
Resumo:
This paper reports on statements from Professional Development participants who were asked to comment on NAPLAN. The participants were involved in a project designed by the YuMi Deadly Centre (YDC) for implementation into 25 Queensland School to enhance the teaching and learning of mathematics to Aboriginal and Torres Strait Islander students and low SES students. Using an action research framework and a survey questionnaire, the preliminary data obtained from participating principals is mixed, with statements indicating that NAPLAN is a high priority for some schools while others indicated that it does not “tell” the whole story of student learning.
Resumo:
Large trucks are involved in a disproportionately small fraction of the total crashes but a disproportionately large fraction of fatal crashes. Large truck crashes often result in significant congestion due to their large physical dimensions and from difficulties in clearing crash scenes. Consequently, preventing large truck crashes is critical to improving highway safety and operations. This study identifies high risk sites (hot spots) for large truck crashes in Arizona and examines potential risk factors related to the design and operation of the high risk sites. High risk sites were identified using both state of the practice methods (accident reduction potential using negative binomial regression with long crash histories) and a newly proposed method using Property Damage Only Equivalents (PDOE). The hot spots identified via the count model generally exhibited low fatalities and major injuries but large minor injuries and PDOs, while the opposite trend was observed using the PDOE methodology. The hot spots based on the count model exhibited large AADTs, whereas those based on the PDOE showed relatively small AADTs but large fractions of trucks and high posted speed limits. Documented site investigations of hot spots revealed numerous potential risk factors, including weaving activities near freeway junctions and ramps, absence of acceleration lanes near on-ramps, small shoulders to accommodate large trucks, narrow lane widths, inadequate signage, and poor lighting conditions within a tunnel.
Resumo:
Overloaded truck traffic is a significant problem on highways around the world. Developing countries in particular, overloaded truck traffic causes large amounts of unexpected expenditure in terms of road maintenance because of premature pavement damage. Overloaded truck traffic is a common phenomenon in developing countries, because of inefficient road management and monitoring systems. According to the available literature, many developing countries are facing the same problem, which is economic loss caused by the existence of overloaded trucks in the traffic stream. This paper summarizes the available literature, news reports, journal articles and traffic research regarding overloaded traffic. It examines the issue of overloading and the strategies and legislation used in developed countries.
Resumo:
The need to develop effective and efficient training programs has been recognised by all sectors engaged in training. In responding to the above need, focus has been directed to developing good competency statements and performance indicators to measure the outcomes. Very little has been done to understand how the competency statements get translated into good performance. To conceptualise this translation process, a representational model based on an information processing paradigm is proposed and discussed. It is argued that learners’ prior knowledge and the effectiveness of the instructional material are two variables that have significant bearing on how effectively the competency knowledge is translated into outcomes. To contextualise the model examples from apprentice training are used.
Resumo:
Section 366(1) of the Property Agents and Motor Dealers Act 2000 (Qld) (‘PAMD’) provides that a relevant contract must have attached, as its first or top sheet, a statement in the approved form being a warning statement. Failure to comply with this statutory requirement entitles a purchaser to terminate the contract. The meaning to be attributed to the statutory reference to ‘attached’ will clearly be problematic where documentation is sent by way of facsimile transmission. This was the issue that arose for consideration by Newton DCJ in MNM Developments Pty Ltd v Gerrard [2005] QDC 10.
Resumo:
Section 366 of the Property Agents and Motor Dealers Act 2000 (Qld) (‘PAMDA’) mandates that all contracts for the sale of residential property in Queensland (other than contracts formed on a sale by auction) have a warning statement ‘attached’ as the first or top sheet. Alternative judicial views have emerged concerning the possibility of attaching a warning statement to a contract sent by facsimile. In recognition of the consumer protection nature of the legislation, in MP Management (Aust) Pty Ltd v Churven [2002] QSC 320 Muir J favoured a restrictive view of the word ‘attached’ requiring physical joinder of the warning statement to the relevant contract. In contrast, in MNM Developments Pty Ltd v Gerrard [2005] QDC 10 Newton DCJ opined that the requirements of the PAMDA could be met where the warning statement preceded the contract of sale in a facsimile transmission sent in one continuous stream. Newton DCJ considered that this broader approach promoted commercial convenience. In an appeal from the decision of Newton DCJ, in MNM Developments Pty Ltd v Gerrard [2005] QCA 230 a majority of the Queensland Court of Appeal has held that the restrictive view propounded by Muir J is correct. Notwithstanding possible commercial inconvenience, it is not possible for a warning statement to be attached to a contract sent by facsimile.
Resumo:
1. Overview of hotspot identification (HSID)methods 2. Challenges with HSID 3. Bringing crash severity into the ‘mix’ 4. Case Study: Truck Involved Crashes in Arizona 5. Conclusions • Heavy duty trucks have different performance envelopes than passenger cars and have more difficulty weaving, accelerating, and braking • Passenger vehicles have extremely limited sight distance around trucks • Lane and shoulder widths affect truck crash risk more than passenger cars • Using PDOEs to model truck crashes results in a different set of locations to examine for possible engineering and behavioral problems • PDOE models point to higher societal cost locations, whereas frequency models point to higher crash frequency locations • PDOE models are less sensitive to unreported crashes • PDOE models are a great complement to existing practice
Resumo:
The decision of Carrapetta v. Rado [2012] NSWCA 202 raises a short but very practical point relating to the right to deliver a notice to complete or have otherwise called for completion where time is of the essence of the contract in circumstances where a settlement statement subsequently sent from the seller has overstated the amount owing under the contract. It was common ground , following the oft quoted High Court decisions of Neeta (Epping) Pty Ltd v Phillips(1974) 131 CLR 286 and Louinder v Leis (1982) 149 CLR 509 that a Notice to Complete which called for completion outside the terms of the contract would be invalid. These decisions also further confirm the long accepted principles that a seller who is not “ready willing and able” to perform all their obligations or who is otherwise in breach of contract at the time could not deliver a Notice to Complete (at[27]).The issue in this case did not so much concern the efficacy of the Notice to Complete at the time was delivered ,but the legal effect upon the Notice to Complete of the later delivery of a settlement statement for what the buyer considered to be performance beyond that required by the contract.
Resumo:
Much has been written on Michel Foucault’s reluctance to clearly delineate a research method, particularly with respect to genealogy (Harwood 2000; Meadmore, Hatcher, & McWilliam 2000; Tamboukou 1999). Foucault (1994, p. 288) himself disliked prescription stating, “I take care not to dictate how things should be” and wrote provocatively to disrupt equilibrium and certainty, so that “all those who speak for others or to others” no longer know what to do. It is doubtful, however, that Foucault ever intended for researchers to be stricken by that malaise to the point of being unwilling to make an intellectual commitment to methodological possibilities. Taking criticism of “Foucauldian” discourse analysis as a convenient point of departure to discuss the objectives of poststructural analyses of language, this paper develops what might be called a discursive analytic; a methodological plan to approach the analysis of discourses through the location of statements that function with constitutive effects.
Resumo:
Two simple and effective control strategies for a multi-axle heavy truck, modified skyhook damping (MSD) control and proportional-integration-derivative (PID) control, were implemented into functional virtual prototype (FVP) model and compared in terms of road friendliness and ride comfort. A four-axle heavy truck-road coupling system model was established using FVP technology and validated through a ride comfort test. Then appropriate passive air suspensions were chosen to replace the rear tandem suspensions of the original truck model for preliminary optimization. The mechanical properties and time lag of dampers were taken into account in simulations of MSD and PID semi-active dampers implemented using MATLAB/Simulink. Through co-simulations with Adams and MATLAB, the effects of semi-active MSD and PID control were analyzed and compared, and control parameters which afforded the best comprehensive performance for each control strategy were chosen. Simulation results indicate that compared with the passive air suspension truck, semi-active MSD control improves both ride comfort and road-friendliness markedly, with optimization ratios of RMS vertical acceleration and RMS tyre force ranging from 10.1% to 44.8%. However, semi-active PID control only reduces vertical vibration of the driver’s seat by 11.1%, 11.1% and 10.9% on A, B and C level roads respectively. Both strategies are robust to the variation of road level.
Resumo:
To execute good design one not only needs to know what to do and how to do it, but also why it should be done. For a standardization expert the rationale of a standardization project may be found in the proposal for a new work item or terms of reference, but rarely in the scope statement. However, it is also commonplace that the rationale of the project is not clearly stated in any of these parts. If the rationale is not surfaced in the early phases of a project, it is left to the design, sense-making and negotiation cycles of the design process to orient the project towards a goal. This paper explores how scope statements are used to position standardization projects in the IT for Learning, Education and Training (ITLET) domain, and how scope and rationale are understood in recent projects in European and international standardization. Based on two case-studies the paper suggests some actions for further research and improvement of the process.