914 resultados para Risk, Process, Systems, Value, Enterprise
Resumo:
Nowadays, more than half of the computer development projects fail to meet the final users' expectations. One of the main causes is insufficient knowledge about the organization of the enterprise to be supported by the respective information system. The DEMO methodology (Design and Engineering Methodology for Organizations) has been proved as a well-defined method to specify, through models and diagrams, the essence of any organization at a high level of abstraction. However, this methodology is platform implementation independent, lacking the possibility of saving and propagating possible changes from the organization models to the implemented software, in a runtime environment. The Universal Enterprise Adaptive Object Model (UEAOM) is a conceptual schema being used as a basis for a wiki system, to allow the modeling of any organization, independent of its implementation, as well as the previously mentioned change propagation in a runtime environment. Based on DEMO and UEAOM, this project aims to develop efficient and standardized methods, to enable an automatic conversion of DEMO Ontological Models, based on UEAOM specification into BPMN (Business Process Model and Notation) models of processes, using clear semantics, without ambiguities, in order to facilitate the creation of processes, almost ready for being executed on workflow systems that support BPMN.
Resumo:
Organizations are Complex systems. A conceptual model of the enterprise is needed that is: coherent the distinguished aspect models constitute a logical and truly integral comprehensive all relevant issues are covered consistent the aspect models are free from contradictions or irregularities concise no superfluous matters are contained in it essential it shows only the essence of the enterprise, i.e., the model abstracts from all realization and implementation issues. The world is in great need for transparency about the operation of all the systems we daily work with, ranging from the domestic appliances to the big societal institutions. In this context the field of enterprise ontology has emerged with the aim to create models that help to understand the essence of the construction and operation of complete systems; more specifically, of enterprises. Enterprise ontology arises in the way to look through the distracting and confusing appearance of an enterprise right into its deep kernel. This, from the perspective of the system designer gives him the tools needed to design a successful system in a way that’s reflects the desires and needs of the workers of the enterprise. This project’s context is the use of DEMO (Design and Engineering Methodology for Organizations) for (re)designing or (re)engineering of an enterprise, namely a process of the construction department of a city hall, the lack of a well-founded theory about the construction and operation of this processes that was the motivation behind this work. The purpose of studying applying the DEMO theory and method was to optimize the process, automating it as much as possible, while reducing paper and time spent between tasks and provide a better service to the citizens.
Resumo:
This work involves the organization and content perspectives on Enterprise Content Management (ECM) framework. The case study at the Federal University of Rio Grande do Norte was based on ECM model to analyse the information management provided by the three main administrative systems: The Integrated Management of Academic Activities (SIGAA), Integrated System of Inheritance, and Contracts Administration (SIPAC) and the Integrated System for Administration and Human Resources (SIGRH). A case study protocol was designed to provide greater reliability to research process. Four propositions were examined in order to reach the specific objectives of identification and evaluation of ECM components from UFRN perspective. The preliminary phase provided the guidelines for the data collection. In total, 75 individuals were interviewed. Interviews with four managers directly involved on systems design were recorded (average duration of 90 minutes). The 70 remaining individuals were approached in random way in UFRN s units, including teachers, administrative-technical employees and students. The results showed the presence of many ECM elements in the management of UFRN administrative information. The technological component with higher presence was "management of web content / collaboration". But initiatives of other components (e.g. email and document management) were found and are in continuous improvement. The assessment made use of eQual 4.0 to examine the effectiveness of applications under three factors: usability, quality of information and offered service. In general, the quality offered by the systems was very good and walk side by side with the obtained benefits of ECM strategy adoption in the context of the whole institution
Resumo:
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)
Resumo:
Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)
Resumo:
Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)
Resumo:
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)
Resumo:
The partitioning of Green Fluorescent Protein (GFP) in poly(ethylene glycol)/Na-poly(acrylate) aqueous two-phase systems (PEG/NaPA-ATPS) has been investigated. The aqueous two-phase systems are formed by mixing the polymers with a salt and a protein solution. The protein partitioning in the two-phase system was investigated at 25 degrees C. The concentration of the GFP was measured by fluorimetry. It was found that the partitioning of GFP depends on the salt type, pH and concentration of PEG. The data indicates that GFP partitions more strongly to the PEG phase in presence of Na2SO4 relative to NaCl. Furthermore, the GFP partitions more to the PEG phase at higher pH. The partition to the PEG phase is strongly favoured in systems with larger tie-line lengths (i.e. systems with higher polymer concentrations). The molecular weight of PEG is important since the partition coefficient (K) of GFP gradually decreases with increasing PEG size, from K ca. 300-400 for PEG 400 to K equal to 1.19 for PEG 8000. A separation process was developed where GFP was separated from a homogenate in two extraction steps: the GFP is first partitioned to the PEG phase in a PEG 3000/NaPA 8000 system containing 3 wt% Na2SO4, where the K value of GFP was 8. The GFP is then re-extracted to a salt phase formed by mixing the previous top-phase with a Na2SO4 solution. The K-value of GFP in this back-extraction was 0.22. The total recovery based on the start material was 74%. (c) 2008 Elsevier B.V. All rights reserved.
Resumo:
Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)
Resumo:
Power-law distributions, i.e. Levy flights have been observed in various economical, biological, and physical systems in high-frequency regime. These distributions can be successfully explained via gradually truncated Levy flight (GTLF). In general, these systems converge to a Gaussian distribution in the low-frequency regime. In the present work, we develop a model for the physical basis for the cut-off length in GTLF and its variation with respect to the time interval between successive observations. We observe that GTLF automatically approach a Gaussian distribution in the low-frequency regime. We applied the present method to analyze time series in some physical and financial systems. The agreement between the experimental results and theoretical curves is excellent. The present method can be applied to analyze time series in a variety of fields, which in turn provide a basis for the development of further microscopic models for the system. © 2000 Elsevier Science B.V. All rights reserved.
Resumo:
Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)
Resumo:
Modeling ERP software means capturing the information necessary for supporting enterprise management. This modeling process goes down through different abstraction layers, from enterprise modeling to code generation. Thus ERP is the kind of system where enterprise engineering undoubtedly has, or should have, a strong influence. For the case of Free/Open Source ERP, the lack of proper modeling methods and tools can jeopardize the advantage brought by source code availability. Therefore, the aim of this paper is to present a development process proposal for the Open Source ERP5 system. The proposed development process aims to cover different abstraction levels, taking into account well established standards and common practices, as well as platform issues. Its main goal is to provide an adaptable meta-process to ERP5 adopters. © 2006 IEEE.
Resumo:
This paper presents a proposal of a model to measure the efficiency of outsourced companies in the aeronautical industry applying the methods DEA and AHP. It also proposes an evaluation in the relation between the variables of the process and the value obtained for the effiiency. The criteria of Quality, Time and Cost were considered the outputs of the process, and those criteria were quantified by AHP for DEA matrix.The number of technical documents received by those outsorced companies were considered the input of the process. The other purpose is to separate the companies in groups considered able to receive an investment to improve their process. Copyright © 2008 SAE International.
Resumo:
This article aims to present proposals for improvement of key standards and resolutions concerned about the methodology for calculating the indicator of total harmonic voltage distortion, and should contribute to the process of examining the compatibility of potentially disturbing loads in electric power quality in distribution systems. These proposals were drawn from the analysis of results from measurement campaigns conducted in a case study including analysis of the connection of a new induction furnace in a foundry served by a distributor of São Paulo state. A general historical situating the quality of electric energy in the electricity sector is presented, and methodological guidelines and procedures used in experimental trials are shown. The analysis and discussion of results are prepared to answer the main questions that arise during the implementation of standards, resolutions and procedures. © 2011 IEEE.
Resumo:
This paper aimed to analyse supply chain risk factors in aerospace industry. It was conducted an exploratory research at an important Brazilian aerospace company. This company has a major role at the global aerospace industry. Senior managers assessed risk factors such as quality, productivity, supply chain, business strategy, organisation, environmental and natural political, indicators, product management, and information system. Analytic hierarchy process was applied to prioritise these factors. The most relevant were quality and productivity. Copyright © 2011 Inderscience Enterprises Ltd.