996 resultados para Plant Improvement


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Adhesive bonding of components has become more efficient in recent years due to the developments in adhesive technology, which has resulted in higher peel and shear strengths, and also in allowable ductility up to failure. As a result, fastening and riveting methods are being progressively replaced by adhesive bonding, allowing a big step towards stronger and lighter unions. However, single-lap bonded joints still generate substantial peel and shear stress concentrations at the overlap edges that can be harmful to the structure, especially when using brittle adhesives that do not allow plasticization in these regions. In this work, a numerical and experimental study is performed to evaluate the feasibility of bending the adherends at the ends of the overlap for the strength improvement of single-lap aluminium joints bonded with a brittle and a ductile adhesive. Different combinations of joint eccentricity were tested, including absence of eccentricity, allowing the optimization of the joint. A Finite Element stress and failure analysis in ABAQUS® was also carried out to provide a better understanding of the bent configuration. Results showed a major advantage of using the proposed modification for the brittle adhesive, but the joints with the ductile adhesive were not much affected by the bending technique.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper presents a biased random-key genetic algorithm for the resource constrained project scheduling problem. The chromosome representation of the problem is based on random keys. Active schedules are constructed using a priority-rule heuristic in which the priorities of the activities are defined by the genetic algorithm. A forward-backward improvement procedure is applied to all solutions. The chromosomes supplied by the genetic algorithm are adjusted to reflect the solutions obtained by the improvement procedure. The heuristic is tested on a set of standard problems taken from the literature and compared with other approaches. The computational results validate the effectiveness of the proposed algorithm.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

O presente trabalho foi elaborado no âmbito da Dissertação Final de Mestrado do curso de Engenharia Mecânica – Gestão Industrial do Instituto Superior de Engenharia do Porto. Este foi realizado numa empresa da indústria de pneus, a Continental Mabor S.A.. Nos dias atuais, a indústria esta cada vez mais competitiva, os custos e os prazos da entrega são cada vez mais reduzidos e a qualidade cada vez mais exigente, assim sendo, é imprescindível uma constante melhoria do sistema produtivo. Este fato fez com que o presente trabalho tivesse como principal objetivo determinar o estado atual e delinear um plano de melhoria para um equipamento (Extrusora de pisos nº6), recentemente instalado na fábrica mas oriundo de outra fábrica do grupo, recorrendo para tal ao Lean Manufacturing e a ferramentas que lhe estão associadas. Inicialmente realizou-se uma análise e diagnóstico ao processo de extrusão de pisos na Extrusora nº6, com o intuito de avaliar todas as suas ineficiências e ainda formular um plano de melhorias para a ineficiência de maior impacto no sistema produtivo. Esta análise foi realizada em diferentes turnos e diferentes equipas de trabalho de forma a se obter uma amostra mais representativa da realidade global. Após esta análise verificou-se que as principais ineficiências eram Setup, conformidade do material, dimensões e encravamentos, entre outros. Sendo que os Setup provocam um tempo de paragem de 101 minutos por turno, escolheu-se esta perturbação como o foco do plano de melhorias a realizar posteriormente. De forma a reduzir os tempos de mudança (Setup), o autor no presente trabalho utilizou ferramentas Lean Manufacturing, principalmente o SMED. Conjuntamente com o SMED ainda foram utilizadas outras ferramentas Lean Manufacturing tais como: 5S, Gestão Visual, Problem Solving e Normalização do Método de Trabalho. Após a implementação de todas estas ferramentas obteve-se uma redução de tempos de mudança de 43% com 1 operador e 71% com 2 operadores, ou seja, reduziu-se de 40,5 minutos gastos por turno para a mudança de fieira para 23,13 min e 11,79 min respetivamente, o que corresponde a um ganho monetário anual de 63.621€ ou 105.045€, respetivamente. Com este trabalho conclui-se que a utilização de ferramentas Lean Manufacturing contribuem para a redução dos desperdícios do processo produtivo. Por isso, espera-se que este estudo seja aplicado na Extrusora nº6 e nas restantes Extrusoras de pisos existentes na fábrica, e num futuro próximo que se realize estudos semelhantes em máquinas com diferentes funções.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

O presente trabalho centra-se na gestão de resíduos produzidos no sistema de drenagem e tratamento de águas residuais do município de Vila Nova de Gaia. A entidade onde decorreu o trabalho é uma empresa responsável pela distribuição de água e pela drenagem e tratamento de águas residuais. A empresa está certificada pela norma NP EN ISO 14001, desde 2001, sendo então um dos objectivos o enquadramento da gestão dos resíduos em estudo na referida norma, acompanhando os requisitos da mesma com vista ao seu total cumprimento. Outros dos objectivos foi estudar qual a opção de tratamento mais adequada a aplicar ao resíduo no seu local de armazenamento temporário com vista a minorar os seus impactes ambientais. De acordo com a caracterização analítica do resíduo e com os aspetos legais aplicáveis, foram também analisados os destinos finais possíveis e ambientalmente adequados ao resíduo. A medida proposta para a minimização de impactes no local de armazenamento temporário do resíduo foi a estabilização com cal nos leitos de secagem, disponíveis numa antiga ETAR de loteamento. O doseamento de cal a aplicar ao resíduo será de 10 kg de cal apagada comercial (Ca (OH)2) por uma tonelada de resíduo fresco com um período mínimo de secagem de 2 meses. Outra das medidas de minimização de impactes selecionada foi a implantação de uma cortina arbórea ao redor da instalação. Sendo o resíduo em estudo muito heterogéneo, constituído principalmente por areias, terras e gradados, a valorização foi equacionada mas não foram encontrados alternativas viáveis. O destino final considerado como mais adequado tendo em conta todas as características do resíduo e eluato, analisadas de acordo com o previsto no Decreto-Lei n.º 183/2009 de 10 de Agosto, foi o aterro para resíduos não perigosos. Foi também objecto do estudo a identificação e análise de todos os aspectos ambientais relacionados com a gestão de resíduos e a avaliação da sua significância. Dos aspectos ambientais identificados como significativos, destacam-se aqueles que ocorrem presentemente, os resíduos armazenados (gradados/limpeza de redes), e os que podem ocorrer em situações de emergência, fuga/derrame de óleos/combustíveis e cheiros/odores. De forma a minimizar os aspectos ambientais identificados, e de acordo com a norma NP EN ISO 14001, foram propostas ações que constam de um programa de gestão elaborado para este trabalho, onde se definem os objectivos, metas e prazos. As principais medidas propostas no programa de gestão foram: Estabilização com cal (inicial e reforço se necessário); melhoria do espaço envolvente; análise de questões de saúde ocupacional/segurança; adjudicação de prestação de serviços da recolha por operador licenciado; implantação da cortina arbórea; registo no SIRAPA; criação de planos de emergência ambiental e de segurança.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Mem. Acad. Ciências Lisboa, Classe Ciências, XXXVII: 25-47

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this study the inhalation doses and respective risk are calculated for the population living within a 20 km radius of a coal-fired power plant. The dispersion and deposition of natural radionuclides were simulated by a Gaussian dispersion model estimating the ground level activity concentration. The annual effective dose and total risk were 0.03205 mSv/y and 1.25 x 10-8, respectively. The effective dose is lower than the limit established by the ICRP and the risk is lower than the limit proposed by the U.S. EPA, which means that the considered exposure does not pose any risk for the public health.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Journal of Business, Vol. 78 Issue 3, p1049-1072

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Trabalho Final de Mestrado para obtenção do grau de Mestre em Engenharia Mecânica

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Coal contains trace quantities of natural radionuclides such as Th-232, U-235, U-238, as well as their radioactive decay products and 40K. These radionuclides can be released as fly ash in atmospheric emissions from coal-fired power plants, dispersed into the environment and deposited on the surrounding top soils. Therefore, the natural radiation background level is enhanced and consequently increase the total dose for the nearby population. A radiation monitoring programme was used to assess the external dose contribution to the natural radiation background, potentially resulting from the dispersion of coal ash in past atmospheric emissions. Radiation measurements were carried out by gamma spectrometry in the vicinity of a Portuguese coal-fired power plant. The radiation monitoring was achieved both on and off site, being the boundary delimited by a 20 km circle centered in the stacks of the coal plant. The measured radionuclides concentrations for the uranium and thorium series ranged from 7.7 to 41.3 Bq/kg for Ra-226 and from 4.7 to 71.6 Bq/kg for Th-232, while K-40 concentrations ranged from 62.3 to 795.1 Bq/kg. The highest values were registered near the power plant and at distances between 6 and 20 km from the stacks, mainly in the prevailing wind direction. The absorbed dose rates were calculated for each sampling location: 13.97-84.00 ηGy/h, while measurements from previous studies carried out in 1993 registered values in the range of 16.6-77.6 ηGy/h. The highest values were registered at locations in the prevailing wind direction (NW-SE). This study has been primarily done to assess the radiation dose rates and exposure to the nearby population in the surroundings of a coal-fired power plant. The results suggest an enhancement or at least an influence in the background radiation due to the coal plant past activities.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Certain materials used and produced in a wide range of non-nuclear industries contain enhanced activity concentrations of natural radionuclides. In particular, electricity production from coal is one of the major sources of increased exposure to man from enhanced naturally occurring materials. Over the past decades there has been some discussion about the elevated natural background radiation in the area near coal-fired power plants due to high uranium and thorium content present in coal. This work describes the methodology developed to assess the radiological impact due to natural radiation background increasing levels, potentially originated by a coal-fired power plant’s operation. Gamma radiation measurements have been done with two different instruments: a scintillometer (SPP2 NF, Saphymo) and a gamma ray spectrometer with energy discrimination (Falcon 5000, Canberra). A total of 40 relevant sampling points were established at locations within 20 km from the power plant: 15 urban and 25 suburban measured stations. The highest values were measured at the sampling points near to the power plant and those located in the area within the 6 and 20 km from the stacks. This may be explained by the presence of a huge coal pile (1.3 million tons) located near the stacks contributing to the dispersion of unburned coal and, on the other hand, the height of the stacks (225 m) which may influence ash’s dispersion up to a distance of 20 km. In situ gamma radiation measurements with energy discrimination identified natural emitting nuclides as well as their decay products (212Pb, 214Pb, 226Ra 232Th, 228Ac, 234Th 234Pa, 235U, etc.). This work has been primarily done to in order to assess the impact of a coal-fired power plant operation on the background radiation level in the surrounding area. According to the results, an increase or at least an influence has been identified both qualitatively and quantitatively.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper aims to survey metal concentrations in soils in the vicinity of a coal-firedpower plant located in southwest of Portugal. Two annual sampling campaigns were carried out to measure a hypothetical soil contamination around the coal plant. The sampling area was divided into two subareas, both centered in the emission source, delimited by two concentric circles with radius of 6 km and 20 km. About 40 samplings points were defined in the influence area. Metals measurements were performed with a portable analytical X-ray dispersive energy fluorescence spectrometer identifying about 20 different elements in each sampling point. The most relevant elements measured included As, Cu, Fe, Hg, Pb, Ti and Zn in both sampling areas. Considering the results obtained in the first sampling campaign, arsenic is predominantly higher within the 6-20 km sampling area. The second sampling campaign showed that both sampling areas presented relatively similar metal concentrations except for Fe, Mn, Sr and Zn which concentration is higher within the 6-20 km sampling area. Also, As, Fe, Mn and Ti concentrations decreased significantly from the first to the second sampling campaign and their concentration were predominately higher in the NE-E and E-SE directions.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper describes the methodology adopted to assess local air quality impact in the vicinity of a coal power plant located in the south of Portugal. Two sampling areas were selected to assess the deposition flux of dust fallout and its potential spatial heterogeneity. The sampling area was divided into two subareas: the inner, with higher sampling density and urban and suburban characteristics, inside a 6-km circle centered on the stacks, and an outer subarea, mainly rural, with lower sampling density within a radius of 20 km. Particulate matter deposition was studied in the vicinity of the coal fired power plant during three seasonal sampling campaigns. For the first one, the average annual flux of dust fallout was 22.51 g/(m2 yr), ranging from 4.20 to 65.94 g/(m2 yr); for the second one was 9.47 g/(m2 yr), ranging from 0.78 to 32.72 g/(m2 yr) and for the last one was 38.42 g/(m2 yr), ranging from 1.41 to 117.48 g/(m2 yr). The fallout during the second campaign turned out to be much lower than for others. This was in part due to meteorological local patterns but mostly due to the fact that the power plant was not working at full power during the second sampling campaign.155

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The World Business Council for Sustainable Development (WBCSD) defines Eco-Efficiency as follows: ‘Eco- Efficiency is achieved by the delivery of competitively priced-goods and services that satisfy human needs and bring quality of life, while progressively reducing ecological impacts and resource intensity throughout the life-cycle to a level at least in line with the earth’s estimated carrying capacity’. Eco-Efficiency is under this point of view a key concept for sustainable development, bringing together economic and ecological progress. Measuring the Eco-Efficiency of a company, factory or business, is a complex process that involves the measurement and control of several and relevant parameters or indicators, globally applied to all companies in general, or specific according to the nature and specificities of the business itself. In this study, an attempt was made in order to measure and evaluate the eco-efficiency of a pultruded composite processing company. For this purpose the recommendations of WBCSD [1] and the directives of ISO 14301 standard [2] were followed and applied. The analysis was restricted to the main business branch of the company: the production and sale of standard GFRP pultrusion profiles. The main general indicators of eco-efficiency, as well as the specific indicators, were defined and determined according to ISO 14031 recommendations. With basis on indicators’ figures, the value profile, the environmental profile, and the pertinent eco-efficiency’s ratios were established and analyzed. In order to evaluate potential improvements on company eco-performance, new indicators values and ecoefficiency ratios were estimated taking into account the implementation of new proceedings and procedures, both in upstream and downstream of the production process, namely: a) Adoption of new heating system for pultrusion die in the manufacturing process, more effective and with minor heat losses; b) Implementation of new software for stock management (raw materials and final products) that minimize production failures and delivery delays to final consumer; c) Recycling approach, with partial waste reuse of scrap material derived from manufacturing, cutting and assembly processes of GFRP profiles. In particular, the last approach seems to significantly improve the eco-efficient performance of the company. Currently, by-products and wastes generated in the manufacturing process of GFRP profiles are landfilled, with supplementary added costs to this company traduced by transport of scrap, landfill taxes and required test analysis to waste materials. However, mechanical recycling of GFRP waste materials, with reduction to powdered and fibrous particulates, constitutes a recycling process that can be easily attained on heavy-duty cutting mills. The posterior reuse of obtained recyclates, either into a close-looping process, as filler replacement of resin matrix of GFRP profiles, or as reinforcement of other composite materials produced by the company, will drive to both costs reduction in raw materials and landfill process, and minimization of waste landfill. These features lead to significant improvements on the sequent assessed eco-efficiency ratios of the present case study, yielding to a more sustainable product and manufacturing process of pultruded GFRP profiles.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Trabalho Final de Mestrado para obtenção de grau de Mestre em Engenharia Química e Biológica

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The result of research conducted in trunk fragments from the Coja Arkoses Formation at Naia and Sobreda is reported. It is also reported the palynological study of the lutaceous black level surrounding the Naia trunk. Comparisons with trunks from Nave de Haver are established. Comments on palaeoecology and palaeoclimatology are presented.