917 resultados para Idaho. Dept. of Public Lands
Resumo:
IPLV overall coefficient, presented by Air-Conditioning and Refrigeration Institute (ARI) of America, shows running/operation status of air-conditioning system host only. For overall operation coefficient, logical solution has not been developed, to reflect the whole air-conditioning system under part load. In this research undertaking, the running time proportions of air-conditioning systems under part load have been obtained through analysis on energy consumption data during practical operation in all public buildings in Chongqing. This was achieved by using analysis methods, based on the statistical energy consumption data distribution of public buildings month-by-month. Comparing with the weight number of IPLV, part load operation coefficient of air-conditioning system, based on this research, does not only show the status of system refrigerating host, but also reflects and calculate energy efficiency of the whole air-conditioning system. The coefficient results from the processing and analyzing of practical running data, shows the practical running status of area and building type (actual and objective) – not clear. The method is different from model analysis which gets IPLV weight number, in the sense that this method of coefficient results in both four equal proportions and also part load operation coefficient of air-conditioning system under any load rate as necessary.
Resumo:
The guiding principle of compulsory purchase of interests in land in England and Wales is that of fairness, best stated in the words of Lord Justice Scott in Horn v Sunderland Corporation when he said that the owner has “the right to be put, so far as money can do it, in the same position as if his land had not been taken from him”. In many instances, land acquired by compulsion subsequently becomes surplus to the requirements of the acquiring authority. This may be because the intended development scheme was scrapped, or substantially modified, or that after the passage of time the use of the land for which the purchase took place is no longer required. More controversially it may be that for ‘operational reasons’ the acquiring authority knowingly purchased more land than was required for the scheme. Under these circumstances, the Crichel Down Rules (‘the Rules’) require government departments and other statutory bodies to offer back to the former owners or their successors, any land previously so acquired by, or under the threat of, compulsory purchase.
Resumo:
This paper overviews the main conceptual frameworks for understanding participatory approaches to land use planning and explores their utility in analysing the experience of a recent regional planning exercise in South East England. In particular it examines the contribution of recent ‘New Institutionalist’ ideas to our understanding of participatory processes and the implications for practice of using them to build strategies of public involvement in policy-making and implementation.