762 resultados para Enterprise risk management
Resumo:
Although safety statistics indicate that road crashes are the most common form of work-related fatalities, many organizations fail to treat company vehicles in the same manner as other physical safety hazards within the workplace. Traditionally, work-related road safety has targeted primarily driver-related issues and not adequately addressed organizational processes, such as the organizations’ safety system and risk management processes and practice. This inadequacy generally stems from a lack of specific contextual knowledge and basic requirements to improve work-related road safety, including the supporting systems to ensure any intervention strategy or initiative’s ongoing effectiveness. Therefore, informed by previous research and based on a case study methodology, the Organizational Work-Related Road Safety Situational Analysis was developed to assess organizations’ current work-related road safety system, including policy, procedures, processes and practice. The situational analysis tool is similar to a safety audit however is more comprehensive in detail, application and provides sufficient evidence to enable organizations to mitigate and manage their work-related road safety risks. In addition, data collected from this process assists organizations in making informed decisions regarding intervention strategy design, development, implementation and ongoing effectiveness. This paper reports on the effectiveness of the situational analysis tool to assess WRRS systems across five differing and diverse organizations; including gas exploration and mining, state government, local government, and not for profit/philanthropy. The outcomes of this project identified considerable differences in the degree by which the organizations’ addressed work-related road safety across their vehicle fleet operations and provides guidelines for improving organizations’ work-related road safety systems.
Resumo:
In the electricity market environment, load-serving entities (LSEs) will inevitably face risks in purchasing electricity because there are a plethora of uncertainties involved. To maximize profits and minimize risks, LSEs need to develop an optimal strategy to reasonably allocate the purchased electricity amount in different electricity markets such as the spot market, bilateral contract market, and options market. Because risks originate from uncertainties, an approach is presented to address the risk evaluation problem by the combined use of the lower partial moment and information entropy (LPME). The lower partial moment is used to measure the amount and probability of the loss, whereas the information entropy is used to represent the uncertainty of the loss. Electricity purchasing is a repeated procedure; therefore, the model presented represents a dynamic strategy. Under the chance-constrained programming framework, the developed optimization model minimizes the risk of the electricity purchasing portfolio in different markets because the actual profit of the LSE concerned is not less than the specified target under a required confidence level. Then, the particle swarm optimization (PSO) algorithm is employed to solve the optimization model. Finally, a sample example is used to illustrate the basic features of the developed model and method.
Resumo:
This paper employs a VAR-GARCH model to investigate the return links and volatility transmission between the S&P 500 and commodity price indices for energy, food, gold and beverages over the turbulent period from 2000 to 2011. Understanding the price behavior of commodity prices and the volatility transmission mechanism between these markets and the stock exchanges are crucial for each participant, including governments, traders, portfolio managers, consumers, and producers. For return and volatility spillover, the results show significant transmission among the S&P 500 and commodity markets. The past shocks and volatility of the S&P 500 strongly influenced the oil and gold markets. This study finds that the highest conditional correlations are between the S&P 500 and gold index and the S&P 500 and WTI index. We also analyze the optimal weights and hedge ratios for commodities/S&P 500 portfolio holdings using the estimates for each index. Overall, our findings illustrate several important implications for portfolio hedgers for making optimal portfolio allocations, engaging in risk management and forecasting future volatility in equity and commodity markets. © 2013 Elsevier B.V.
Resumo:
Purpose – Rapid urbanisation, fragmented governance and recurrent flooding complicates resolution of DKI Jakarta’s chronic housing shortage. Failure to effectively implement planning decisionmaking processes poses potential human rights violations. Contemporary planning policy requires the relocation of households living in floodplains within fifteen metres of DKI Jakarta’s main watercourses; further constraining land availability and potentially requiring increased densification. The purpose of this paper is to re-frame planning decision-making to address risks of flooding and to increase community resilience. Design/methodology/approach – This paper presents a preliminary scoping study for a technologically enhanced participatory planning method, incorporating synthesis of existing information on urbanisation, governance, and flood risk management in Jakarta. Findings – Responsibility for flood risk management in DKI Jakarta is fragmented both within and across administrative boundaries. Decision-making is further complicated by: limited availability of land use data; uncertainty as to the delineated extent of watercourses, floodplains, and flood modelling; unclear risk and liability for infrastructure investments; and technical literacy of both public and government participants. Practical implications – This research provides information to facilitate consultation with government entities tasked with re-framing planning processes to increase public participation. Social implications – Reduction in risk exposure amongst DKI Jakarta’s most vulnerable populations addresses issues of social justice.
Resumo:
Purpose Prior research emphasizes that organizational founders have a good deal of influence in organizational development and, where ICTs are involved, a generic strategy is usually deployed by managers in order to deal with any resistance that might occur. Cognisant of this, we investigated the role played by a Managing Director of an SME consultancy in an ICT project associated with organizational development. Design/methodology/approach This study is based on an ethnography of a ICT related change management initiative which, theoretically, takes into account though from the social shaping of technology – speifically the idea that technologies in their broadest sense are subject to ongoing work beyond the design stage. Findings We argue that Markus’ Interaction Theory of resistance still has relevance today and we extend it by emphasizing the problem of homogenizing users and downplaying their ability to appropriate resistance strategies in situ. Research limitations/implications Our study is based upon one group of individual’s experiences. Further case studies of resistance success are required which further highlight how such this is achieved and why. Practical implications Those engaged with organisational development projects need to be better educated as to the reasons for resistance, particularly positive ones, and the methods by which this might take place. Originality/value This study conceptualises strategies for ‘overcoming’ resistance as managerial technologies. Conceptualising them in this way, shows the deployement of such technologies to be a complicated and active process where the audience for such things are involved in how they are received and appropriated to suite differing agendas.
Resumo:
Purpose – This paper seeks to analyse the process of packaged software selection in a small organization, focussing particularly on the role of IT consultants as intermediaries in the process. Design/methodology/approach – This is based upon a longitudinal, qualitative field study concerning the adoption of a customer relationship management package in an SME management consultancy. Findings – The authors illustrate how the process of “salesmanship”, an activity directed by the vendor/consultant and focussed on the interests of senior management, marginalises user needs and ultimately secures the procurement of the software package. Research limitations/implications – Despite the best intentions the authors lose something of the rich detail of the lived experience of technology in presenting the case study as a linear narrative. Specifically, the authors have been unable to do justice to the complexity of the multifarious ways in which individual perceptions of the project were influenced and shaped by the opinions of others. Practical implications – Practitioners, particularly those from within SMEs, should be made aware of the ways in which external parties may have a vested interest in steering projects in a particular direction, which may not necessarily align with their own interests. Originality/value – This study highlights in detail the role of consultants and vendors in software selection processes, an area which has received minimal attention to date. Prior work in this area emphasises the necessary conditions for, and positive outcomes of, appointing external parties in an SME context, with only limited attention being paid to the potential problems such engagements may bring.
Resumo:
Background The aim of this study is to examine the flood fatality with a view to identifying risks which may inform public policy responses to future flood. On July 21st, 2012, Beijing suffered the heaviest rain since 1963. The average rainfall was 215 mm over a 24 hour period in the central city (301mm in Fangshan District). The rain resulted in a flood that caused severe health, social and financial impact. Results This flood caused 79 deaths. Of the 71 deaths for which a specific cause could be identified, 5 were rescue team members, 42 were killed by drowning (11 in the car), and the others by electricity shock, fallen house, falling items and lightning. The total financial cost was estimated to be US$ 1.7 billion. The causations of the deaths inform the risks associated with the flood. Discussion This flood had a catastrophic impact on Beijing, mainly due to the intensity of the rain (the rain was the heaviest in the modern Beijing history; possibly due to global warming and urban heat island effect), the vulnerability of the infrastructure (poor standards of drainage, disorganized water management systems and decreased permeability of the earth as a result of the city’s rapid development), and the capacity of the response system (mainly dependent on the awareness of the citizens, warning systems and the capacity of the emergency rescue). Implication Many risk management measures have been implemented as a result of this flood, including water level warning marks, flood safety education and warnings sent to mobile phones, a project to move about 74,500 farmers away from the flood-prone areas within 5 years. However, further measures targeted at the fundamental issues identified by this analysis are necessary, especially those targeting at health issues. These may include better planning, improved drainage systems and ecological development to increase permeability etc..
Resumo:
This definitive guide (formerly the Australian Master OHS & Environment Guide) is a first point of reference for work health and safety best practice and strategy. Written by WHS and legal experts, the guide provides key information on the challenges that professionals and organisations face in relation to WHS. It includes valuable information on legal obligations and risk management, and covers the latest changes brought about by the Work Health and Safety Act.
Resumo:
This definitive guide (formerly the Australian Master OHS & Environment Guide) is a first point of reference for work health and safety best practice and strategy. Written by WHS and legal experts, the guide provides key information on the challenges that professionals and organisations face in relation to WHS. It includes valuable information on legal obligations and risk management, and covers the latest changes brought about by the Work Health and Safety Act.
Resumo:
Our research examined how projects can draw together the fields of human resource management (HRM) and risk management (RM) to consider workforce-related risks on projects; particularly those with a large contingent workforce. It is argued that RM frameworks could be enhanced by a more comprehensive understanding of the specific potential non-technical “people risks” in projects. The study focussed on the Oil and Gas industry and undertook interviews with experts in the field. The findings are considered within the framework of key HRM areas; Management Practices, General Employment Practices, Staffing, HR Development, and Compensation and Benefits, along with Project Completion. Drawing together RM and HRM in a project environment, our research provides a unique opportunity to identify critical workforce-related risks. Such identification is the first step towards a more comprehensive approach to risk assessment and planning for mitigation of such risks in projects.
Resumo:
This research aims to explore and identify political risks on a large infrastructure project in an exaggerated environment to ascertain whether sufficient objective information can be gathered by project managers to utilise risk modelling techniques. During the study, the author proposes a new definition of political risk; performs a detailed project study of the Neelum Jhelum Hydroelectric Project in Pakistan; implements a probabilistic model using the principle of decomposition and Bayes probabilistic theorem and answers the question: was it possible for project managers to obtain all the relevant objective data to implement a probabilistic model?
Resumo:
This paper proposes a recommendation system that supports process participants in taking risk-informed decisions, with the goal of reducing risks that may arise during process execution. Risk reduction involves decreasing the likelihood and severity of a process fault from occurring. Given a business process exposed to risks, e.g. a financial process exposed to a risk of reputation loss, we enact this process and whenever a process participant needs to provide input to the process, e.g. by selecting the next task to execute or by filling out a form, we suggest to the participant the action to perform which minimizes the predicted process risk. Risks are predicted by traversing decision trees generated from the logs of past process executions, which consider process data, involved resources, task durations and other information elements like task frequencies. When applied in the context of multiple process instances running concurrently, a second technique is employed that uses integer linear programming to compute the optimal assignment of resources to tasks to be performed, in order to deal with the interplay between risks relative to different instances. The recommendation system has been implemented as a set of components on top of the YAWL BPM system and its effectiveness has been evaluated using a real-life scenario, in collaboration with risk analysts of a large insurance company. The results, based on a simulation of the real-life scenario and its comparison with the event data provided by the company, show that the process instances executed concurrently complete with significantly fewer faults and with lower fault severities, when the recommendations provided by our recommendation system are taken into account.
Resumo:
An outbreak detection and response system, using time series moving percentile method based on historical data, in China has been used for identifying dengue fever outbreaks since 2008. For dengue fever outbreaks reported from 2009 to 2012, this system achieved a sensitivity of 100%, a specificity of 99.8% and a median time to detection of 3 days, which indicated that the system was a useful decision tool for dengue fever control and risk-management programs in China.