Iowa's public road system of 112,000 miles is one of the largest and the best in the nation. It represents a considerable financial investment of taxpayer revenues over the years. And, it requires a sustained investment to preserve an economical level of transport service into the future. In 1982, a Governor's Blue Ribbon Transportation Task Force evaluated the effectiveness of Iowa's entire transportation system. Four important Task Force recommendations dealt with public road administrative issues in Iowa. These issues were related to: 1. design criteria and levels of maintenance 2. consistency in the use of standards among jurisdictions 3. consolidation of maintenance operations at one jurisdictional level and 4. jurisdictional authority for roads. The issues formed the background for Research Project HR-265.
Resumo:
This report describes a new approach to the problem of scheduling highway construction type projects. The technique can accurately model linear activities and identify the controlling activity path on a linear schedule. Current scheduling practices are unable to accomplish these two tasks with any accuracy for linear activities, leaving planners and manager suspicious of the information they provide. Basic linear scheduling is not a new technique, and many attempts have been made to apply it to various types of work in the past. However, the technique has never been widely used because of the lack of an analytical approach to activity relationships and development of an analytical approach to determining controlling activities. The Linear Scheduling Model (LSM) developed in this report, completes the linear scheduling technique by adding to linear scheduling all of the analytical capabilities, including computer applications, present in CPM scheduling today. The LSM has tremendous potential, and will likely have a significant impact on the way linear construction is scheduled in the future.
Resumo:
This final report for Phase 1 of the research on epoxy-coated, prestressing strands in precast prestressed concrete (PC) panels has been published in two volumes. This volume, Volume 1--Technical Report, contains the problem description, literature review, and survey results; descriptions of the test specimens, experimental tests, and analytical models; discussions of the analytical and experimental results; summary, conclusions, and recommendations; list of references; and acknowledgment. Volume 2--Supplemental Report contains additional information in the form of summarized responses to the questionnaires; graphs showing the strand forces; figures showing the geometry of the specimens and concrete crack patterns that formed in the strand transfer length and strand development length specimens; and graphs of the concrete strains in the strand transfer length specimens, load-point deflections, and strand-slip measurements for the strand development length specimens.
Resumo:
An asphalt concrete (ACC) overlay is most often the rehabilitative effort used to maintain the serviceability of either an ACC or PCC pavement. The major problem in durability of this ACC overlay comes from reflective cracking. These cracks usually open, allowing water to enter the unsealed crack and strip the ACC in the overlay. The stripping of the ACC allows accelerated deterioration at the crack. Two engineering fabrics were evaluated in this project in order to determine their effectiveness in reducing reflective cracking. These two materials are: PavePrep, Contech Construction Products, Inc., and Pro-Guard, Phillips Fiber Corporation. A 4.2 km (2.6 mi) roadway in Audubon County was selected for the research project. The roadway was divided into eight test sections. Four of the test sections are conventional resurfacing. The other four sections are split between the two engineering fabrics (two Pro-Guard and two PavePrep). A 75 mm (3 in.) thick overlay was placed over the entire project.
Resumo:
This report describes the development of performance measures for the Iowa DOT Construction Offices. The offices are responsible for administering all transportation construction projects for the Iowa DOT. In conjunction with a steering team composed of representatives of the Construction Offices, the research team developed a list of eight key processes and a set of measures for each. Two kinds of data were gathered: baseline data and benchmark data. Baseline data is used to characterize current performance. Benchmark data is gathered to find organizations that have excellent performance records for one or more key functions. This report discusses the methodology used and the results obtained. The data obtained represents the first set of data points. Subsequent years will establish trends for each of the measures, showing improvement or lack of it.
Resumo:
This report describes the continuation of the development of performance measures for the Iowa Department of Transportation (DOT) Offices of Construction. Those offices are responsible for administering transportation construction projects for the Iowa DOT. Researchers worked closely with the Benchmark Steering Team which was formed during Phase I of this project and is composed of representatives of the Offices of Construction. The research team conducted a second survey of Offices of Construction personnel, interviewed numerous members of the Offices and continued to work to improve the eight key processes identified during Phase I of this research. The eight key processes include Inspection of Work, Resolution of Technical Issues, Documentation of Work Progress and Pay Quantities, Employee Training and Development, Continuous Feedback for Improved Contract Documents, Provide Safe Traffic Control, External/Public Communication, and Providing Pre-Letting Information. Three to four measurements were specified for each key process. Many of these measurements required opinion surveys of employees, contractors, and others. During Phase II, researchers concentrated on conducting surveys, interviewing respondents to improve future surveys, and facilitating Benchmark Steering Team monthly meetings. Much effort was placed on using the information collected during the first year's research to improve the effectiveness and efficiency of the Offices of Construction. The results from Process Improvement Teams that studied Traffic Control and Resolution of Technical Issues were used to improve operations.
Resumo:
Recent reports have indicated that 23.5% of the nation's highway bridges are structurally deficient and 17.7% are functionally obsolete. A significant number of these bridges are on the Iowa secondary road system where over 86% of the rural bridge management responsibilities are assigned to the counties. Some of the bridges can be strengthened or otherwise rehabilitated, but many more are in need of immediate replacement. In a recent investigation (HR-365 "Evaluation of Bridge Replacement Alternatives for the County Bridge System") several types of replacement bridges that are currently being used on low volume roads were identified. It was also determined that a large number of counties (69%) have the ability and are interested in utilizing their own forces to design and construct short span bridges. After reviewing the results from HR-365, the research team developed one "new" bridge replacement concept and a modification of a replacement system currently being used. Both of these bridge replacement alternatives were investigated in this study, the results of which are presented in two volumes. This volume (Volume 2) presents the results of Concept 2 - Modification of the Beam-in-Slab Bridge. Concept 1 - Steel Beam Precast Units is presented in Volume 1. Concept 2 involves various laboratory tests of the Beam-in-Slab bridge (BISB) currently being used by Benton County and several other Iowa counties. In this investigation, the behavior and strength of the BISB were determined; a new method of obtaining composite action between the steel beams and concrete was also tested. Since the Concept 2 bridge is primarily intended for use on low-volume roads, the system can be constructed with new or used beams. In the experimental part of the investigation, there were three types of laboratory tests: push-out tests, service and ultimate load tests of models of the BISB, and composite beam tests utilizing the newly developed shear connection. In addition to the laboratory tests, there was a field test in which an existing BISB was service load tested. An equation was developed for predicting the strength of the shear connection investigated; in addition, a finite element model for analyzing the BISB was also developed. Push-out tests were completed to determine the strength of the recently developed shear connector. A total of 36 specimens were tested, with variables such as hole diameter, hole spacing, presence of reinforcement, etc. being investigated. In the model tests of the BISB, two and four beam specimens [L=9,140 mm (30 ft)] were service load tested for behavior and load distribution data. Upon completion of these tests, both specimens were loaded to failure. In the composite beam tests, four beams, one with standard shear studs and three using the shear connection developed, were tested. Upon completion of the service load tests, all four beams were loaded to failure. The strength and behavior of the beams with the new shear connection were found to be essentially the same as that of the specimen with standard shear studs.
Resumo:
Two Brisco Scour Monitors were installed on pier MS1 of the Mississippi River at Burlington in August 1991. No problems were encountered during the installation. The monitors consist of a probe resting on the river bottom fastened to a cable that wraps around a reel. An electrical system monitors the movement of the reel which transmits to a digital readout which shows whether scour has occurred. The intent was to monitor the digital readout twice a year during a four-year evaluation period. The scour monitor digital readouts malfunctioned frequently due to electrical storms. The scour monitor performance was completely unacceptable.
Resumo:
There are many miles of portland cement concrete pavement in Iowa that due to normal wear, and in some cases accelerated wear from studded tires, the surface has become polished resulting in less than desirable friction values. Retexturing the surface may be an economical way to re-establish desirable friction values. Retexturing by grinding with diamond blades and transverse grooving with diamond blades are two methods of rehabilitating p.c.c. surfaces. MU Inc. of Lebanan, Tennessee proposed to provide without charge to the Iowa Department of Transportation, one 1500 ft x 12 ft section each of three methods of texturing. They are longitudinal grinding, transverse grooving and longitudinal grinding followed by transverse grooving. A section of 1500 feet is needed to properly evaluate a texturing method. It was decided by Iowa DOT personnel that due to possible differential friction it would be undesirable to texture only one lane. The decision was made to do test sections of 1500 ft x 24 ft with the cost of the additional texturing paid by the Iowa DOT. Iowa also has areas where the p.c.c. pavement has faulted at the joints and cracks which results in poor riding quality. Methods of correcting the faulting are to underseal the pavement where needed and/or grinding the surface to eliminate the faulted areas. It was decided to include in this research project a section for profiling by grinding.
Resumo:
Bridge deck cracking occasionally occurs during construction for any number of reasons. Improper design, concrete placement or deck curing can result in cracks. One contributing factor toward cracking may be dead load deflections induced during concrete placement. For both continuous and non-continuous bridges, specific placement sequences are required to minimize harmful deflections in previously placed sections. Set retarding admixtures are also used to keep previously placed concrete plastic until the pour is completed. The problem is--at what point does movement of the concrete cause permanent damage to the deck. The study evaluated the time to crack formation relationship for mixes with low and high dosages of set retarding admixtures currently approved for use in Iowa state and county projects.
Resumo:
Since 1987, the Iowa Department of Transportation has based control of hot asphalt concrete mixes on cold feed gradations. This report presents results of comparisons between cold feed gradations and gradations of aggregate from the same material after it has been processed through the plant and laydown machine. Results are categorized based on mix type, plant type, and method of dust control, in an effort to quantify and identify the factors contributing to those changes. Results of the report are: 1. From the 390 sample comparisons made, aggregate degradation due to asphalt plant processing was demonstrated by an average increase of +0.7% passing the #200 sieve and an average increase in surface area of +1.8 sq. ft. per pound of aggregate. 2. Categories with Type A Mix or Recycling as a sorting criteria generally produced greater degradation than categories containing Type B Mixes and/or plants with scrubbers. 3. None of the averages calculated for the categories should be considered unacceptably high, however, it is information that should be considered when making mix changes in the field, selecting asphalt contents for borderline mix designs, or when evaluating potential mix gradation specification or design criteria changes.
Resumo:
Ten bridges were chosen to have their concrete barrier rails constructed with one rail having "Fibermesh" synthetic fibers added and the other rail without the fibers. The rails were constructed in 1985, 1986, or 1987. All the bridges were inspected in 1988 and no consistent reduction in cracking was achieved using Fibermesh fibers in the p.c. concrete bridge barrier rails.
Resumo:
This report summarizes the findings of a research which was intended to evaluate the concrete strength and opening time for the full depth patching projects in Iowa under cold weather and whether or not cold water could be allowed in the mix. This research was performed both in the laboratory and in the field. The results indicated that with the present specification the concrete strength after five hours for two-lane patches which requires hot water and calcium chloride is about 1,600 psi. Hence, if a higher strength is desired, a longer curing time is required. Hot water will have to be used and water reducer is not recommended for two-lane patches. On the other hand, the concrete strength for multi-lane patches with either hot or cold water approaches 4,000 psi in less than 24 hours. There was only a slight difference in compressive strengths between the 24-hour and 36-hours curing times.
Resumo:
This study was undertaken to evaluate the suitability of various stones which play an important role in the properties of compacted mixtures in asphalt treated bases. The determination of the effect of water temperature on the cohesion of the mixes is investigated. A number of stones were prepared for the test. Attention is paid to the particular source of stone with the corresponding test results. A preliminary study of the effect of lime when added to mixed aggregate was also conducted. The purpose of this study is to provide needed information on the cohesive characteristics of asphalt treated bases using a wide range of stones. This study is also to evaluate the suitability of the various stone sources.
Resumo:
This project continues the research which addresses the numerous bridge problems on the Iowa secondary road system. It is a continuation (Phase 2) of Project HR-382, in which two replacement alternatives (Concept 1: Steel Beam Precast Units and Concept 2: Modification of the Benton County Beam-in-Slab Bridge) were investigated. In previous research for concept 1, a precast unit bridge was developed through laboratory testing. The steel-beam precast unit bridge requires the fabrication of precast double-tee (PCDT) units, each consisting of two steel beams connected by a reinforced concrete deck. The weight of each PCDT unit is minimized by limiting the deck thickness to 4 in., which permits the units to be constructed off-site and then transported to the bridge site. The number of units required is a function of the width of bridge desired. Once the PCDT units are connected, a cast-in-place reinforced concrete deck is cast over the PCDT units and the bridge railing attached. Since the steel beam PCDT unit bridge design is intended primarily for use on low-volume roads, used steel beams can be utilized for a significant cost savings. In previous research for concept 2, an alternate shear connector (ASC) was developed and subjected to static loading. In this investigation, the ASC was subjected to cyclic loading in both pushout specimens and composite beam tests. Based on these tests, the fatigue strength of the ASC was determined to be significantly greater than that required in typical low volume road single span bridges. Based upon the construction and service load testing, the steel-beam precast unit bridge was successfully shown to be a viable low volume road bridge alternative. The construction process utilized standard methods resulting in a simple system that can be completed with a limited staff. Results from the service load tests indicated adequate strength for all legal loads. An inspection of the bridge one year after its construction revealed no change in the bridge's performance. Each of the systems previously described are relatively easy to construct. Use of the ASC rather than the welded studs significantly simplified the work, equipment, and materials required to develop composite action between the steel beams and the concrete deck.