713 resultados para roadmap planning
Resumo:
Planning is a vital element of project management but it is still not recognized as a process variable. Its objective should be to outperform the initially defined processes, and foresee and overcome possible undesirable events. Detailed task-level master planning is unrealistic since one cannot accurately predict all the requirements and obstacles before work has even started. The process planning methodology (PPM) has thus been developed in order to overcome common problems of the overwhelming project complexity. The essential elements of the PPM are the process planning group (PPG), including a control team that dynamically links the production/site and management, and the planning algorithm embodied within two continuous-improvement loops. The methodology was tested on a factory project in Slovenia and in four successive projects of a similar nature. In addition to a number of improvement ideas and enhanced communication, the applied PPM resulted in 32% higher total productivity, 6% total savings and created a synergistic project environment.
Resumo:
Life-Cycle Assessment (LCA) was used to assess the potential environmental and human health impacts of growing genetically-modified (GM), herbicide-tolerant sugar beet in the UK and Germany compared with conventional sugar beet varieties. The GM variety results in lower potential environmental impacts on global warming, airborne nutrification, ecotoxicity (of soil and water) and watercourse enrichment, and lower potential human health impacts in terms of production of toxic particulates, summer smog, carcinogens and ozone depletion. Although the overall contribution of GM sugar beet to reducing harmful emissions to the environment would be relatively small, the potential for GM crops to reduce pollution from agriculture, including diffuse water pollution, is highlighted.
Resumo:
1. The UK Biodiversity Action Plan (UKBAP) identifies invertebrate species in danger of national extinction. For many of these species, targets for recovery specify the number of populations that should exist by a specific future date but offer no procedure to plan strategically to achieve the target for any species. 2. Here we describe techniques based upon geographic information systems (GIS) that produce conservation strategy maps (CSM) to assist with achieving recovery targets based on all available and relevant information. 3. The heath fritillary Mellicta athalia is a UKBAP species used here to illustrate the use of CSM. A phase 1 habitat survey was used to identify habitat polygons across the county of Kent, UK. These were systematically filtered using relevant habitat, botanical and autecological data to identify seven types of polygon, including those with extant colonies or in the vicinity of extant colonies, areas managed for conservation but without colonies, and polygons that had the appropriate habitat structure and may therefore be suitable for reintroduction. 4. Five clusters of polygons of interest were found across the study area. The CSM of two of them are illustrated here: the Blean Wood complex, which contains the existing colonies of heath fritillary in Kent, and the Orlestone Forest complex, which offers opportunities for reintroduction. 5. Synthesis and applications. Although the CSM concept is illustrated here for the UK, we suggest that CSM could be part of species conservation programmes throughout the world. CSM are dynamic and should be stored in electronic format, preferably on the world-wide web, so that they can be easily viewed and updated. CSM can be used to illustrate opportunities and to develop strategies with scientists and non-scientists, enabling the engagement of all communities in a conservation programme. CSM for different years can be presented to illustrate the progress of a plan or to provide continuous feedback on how a field scenario develops.
Resumo:
This paper reviews four approaches used to create rational tools to aid the planning and the management of the building design process and then proposes a fifth approach. The new approach that has been developed is based on the mechanical aspects of technology rather than subjective design issues. The knowledge base contains, for each construction technology, a generic model of the detailed design process. Each activity in the process is specified by its input and output information needs. By connecting the input demands of one technology with the output supply from another technology a map or network of design activity is formed. Thus, it is possible to structure a specific model from the generic knowledge base within a KBE system.
Resumo:
Although the construction pollution index has been put forward and proved to be an efficient approach to reducing or mitigating pollution level during the construction planning stage, the problem of how to select the best construction plan based on distinguishing the degree of its potential adverse environmental impacts is still a research task. This paper first reviews environmental issues and their characteristics in construction, which are critical factors in evaluating potential adverse impacts of a construction plan. These environmental characteristics are then used to structure two decision models for environmental-conscious construction planning by using an analytic network process (ANP), including a complicated model and a simplified model. The two ANP models are combined and called the EnvironalPlanning system, which is applied to evaluate potential adverse environmental impacts of alternative construction plans.