745 resultados para pacs: management issues
Resumo:
The development of wideband network services and the new network infrastructures to support them have placed much more requirements on current network management systems. Issues such as scalability, integrity and interoperability have become more important. Existing management systems are not flexible enough to support the provision of Quality of Service (QoS) in these dynamic environments. The concept of Programmable Networks has been proposed to address these requirements. Within this framework, CORBA is regarded as a middleware technology that can enable interoperation among the distributed entities founds in Programmable Networks. By using the basic CORBA environment in a heterogeneous network environment, a network manager is able to control remote Network Elements (NEs) in the same way it controls its local resources. Using this approach both the flexibility and intelligence of the overall network management can be improved. This paper proposes the use of two advanced features of CORBA to enhance the QoS management in a Programmable Network environment. The Transaction Service can be used to manage a set of tasks, whenever the management of elements in a network is correlated; and the Concurrency Service can be used to coordinate multiple accesses on the same network resources. It is also shown in this paper that proper use of CORBA can largely reduce the development and administration of network management applications.
Resumo:
The management of invasive non-native species is a frequent cause of conflict in the field of biodiversity conservation because perceptions of their costs and benefits differ among stakeholder groups. A lack of cohesion between scientific researchers, the commercial sector and policy makers lies at the root of a widespread failure to develop and implement sustainable management practices for invasive species. The crisis of this situation is intensified by drivers stemming from international conventions and directives to address invasive species issues. There are further direct conflicts between legislative instruments promoting biodiversity conservation on the one hand while liberalizing trade at the national, European and global level on the other. The island of Ireland provides graphic illustration of the importance of cross-jurisdictional approaches to biological invasions. Using primarily Irish examples in this review, we emphasize the importance of approaching risk assessment, risk reduction and control or eradication policies from a cost-efficient, highly flexible perspective, incorporating linkages between environmental, economic and social objectives. The need for consolidated policies between Northern Ireland and the Republic of Ireland is particularly acute, though few model cross-border mechanisms for such consolidation are available. The importance of engaging affected stakeholders through positive interactions is discussed with regard to reducing the currently fragmented nature of invasive species management between the two jurisdictions.
Resumo:
During the summer of 2007 the United Kingdom experienced some of the worst flooding in its history, with the city of Hull amongst the worst affected. Meanwhile, the city of New Orleans, USA was subject to severe flooding in August 2005 as a result of Hurricane Katrina. The study has found that both the UK and US government disaster management programmes were ill prepared for these flood events. Many parallel issues have been discovered and discussed. The conditions of vulnerability that are evident in developing countries are not widely present in the UK or US but this must not be allowed to lead to complacency and lack of preparation and awareness. The cost in terms of mortality is relatively low compared to similar events in developing countries; however, the economic implications are considerable and must be addressed.
Resumo:
The objective of this paper is to identify the various managerial constraints, difficulties and issues encountered and resulting strategies adopted, to aid in the management of the various and often complex health and safety concerns, which occur within a confined construction site. This is achieved through classifying the various managerial burdens encountered with the numerous strategies adopted, to ensure the successful management of such confined environments within the realm of health and safety. Through an extensive literature review and detailed interviews, a comprehensive insight into the health and safety concerns within a confined construction site environment is portrayed. The leading managerial strategies to the management of health and safety on confined construction sites may be listed as follows; (1) Traffic Management Plan, (2) Effective Resource Management Plan, (3) Temporary Facilities Management Plan, (4) Safe System of Work Plan, (5) Site Safety Plan, (6) Design Site Layout, (7) Space Management Plan, (8) Effective Program Management, and (9) Space Scheduling. Based on the research, it can be concluded, that through effective management of these issues identified coupled with implementing the various strategies highlighted; successful management of health and safety within a confined construction site environment is attainable.
Resumo:
To date, the processing of wildlife location data has relied on a diversity of software and file formats. Data management and the following spatial and statistical analyses were undertaken in multiple steps, involving many time-consuming importing/exporting phases. Recent technological advancements in tracking systems have made large, continuous, high-frequency datasets of wildlife behavioral data available, such as those derived from the global positioning system (GPS) and other animal-attached sensor devices. These data can be further complemented by a wide range of other information about the animals’ environment. Management of these large and diverse datasets for modelling animal behaviour and ecology can prove challenging, slowing down analysis and increasing the probability of mistakes in data handling. We address these issues by critically evaluating the requirements for good management of GPS data for wildlife biology. We highlight that dedicated data management tools and expertise are needed. We explore current research in wildlife data management. We suggest a general direction of development, based on a modular software architecture with a spatial database at its core, where interoperability, data model design and integration with remote-sensing data sources play an important role in successful GPS data handling.
Resumo:
We present a review of critical concepts and produce recommendations on the management of Philadelphia-negative classical myeloproliferative neoplasms, including monitoring, response definition, first-and second-line therapy, and therapy for special issues. Key questions were selected according the criterion of clinical relevance. Statements were produced using a Delphi process, and two consensus conferences involving a panel of 21 experts appointed by the European LeukemiaNet (ELN) were convened. Patients with polycythemia vera (PV) and essential thrombocythemia (ET) should be defined as high risk if age is greater than 60 years or there is a history of previous thrombosis. Risk stratification in primary myelofibrosis (PMF) should start with the International Prognostic Scoring System (IPSS) for newly diagnosed patients and dynamic IPSS for patients being seen during their disease course, with the addition of cytogenetics evaluation and transfusion status. High-risk patients with PV should be managed with phlebotomy, low-dose aspirin, and cytoreduction, with either hydroxyurea or interferon at any age. High-risk patients with ET should be managed with cytoreduction, using hydroxyurea at any age. Monitoring response in PV and ET should use the ELN clinicohematologic criteria. Corticosteroids, androgens, erythropoiesis-stimulating agents, and immunomodulators are recommended to treat anemia of PMF, whereas hydroxyurea is the first-line treatment of PMF-associated splenomegaly. Indications for splenectomy include symptomatic portal hypertension, drug-refractory painful splenomegaly, and frequent RBC transfusions. The risk of allogeneic stem-cell transplantation-related complications is justified in transplantation-eligible patients whose median survival time is expected to be less than 5 years.
Resumo:
The construction industry is inherently hazardous, with a significant number of accidents and incidents occurring, particularly on confined construction sites. This research identifies, clarifies and tabulates the various managerial health and safety issues encountered on confined construction sites, based on a qualitative approach, to aid in the management of the complex health and safety concerns. The methodology is based on qualitative research incorporating case studies, interviews, causal loop diagrams and mind mapping. The key findings in the managerial issues in the management of health and safety on confined construction sites can be summarised as follows; (1) A lack of space, (2) Increased management of site personnel, (3) Overcrowding of the work place. The implication for the industry is that due to the sustained development of urban centres on a global scale, coupled with the increasing complexity of architectural designs, the majority of on-site project management professionals are faced with the onerous task of completing often intricate designs within a limited spatial environment, under strict health and safety parameters. The value of such research is to aid management professionals successfully identify the various managerial issues highlighted, resulting in the successful management of health and safety on a confined construction site.
Resumo:
The aim of this paper is to identify the various managerial issues encountered by UK/Irish contractors in the management of materials in confined urban construction sites. Through extensive literature review, detailed interviews, case studies, cognitive mapping, causal loop diagrams, questionnaire survey and documenting severity indices, a comprehensive insight into the materials management concerns within a confined construction site environment is envisaged and portrayed. The leading issues highlighted are: that contractors’ material spatial requirements exceed available space, it is difficult to coordinate the storage of materials in line with the programme, location of the site entrance makes delivery of materials particularly difficult, it is difficult to store materials on-site due to the lack of space, and difficult to coordinate the storage requirements of the various sub-contractors. With the continued development of confined urban centres and the increasing high cost of materials, any marginal savings made on-site would translate into significant monetary savings at project completion. Such savings would give developers a distinct competitive advantage in this challenging economic climate. As on-site management professionals successfully identify, acknowledge and counteract the numerous issues illustrated, the successful management of materials on a confined urban construction site becomes attainable.
Resumo:
Purpose – The purpose of this paper is to identify, clarify and tabulate the various managerial issues encountered, to aid in the management of the complex health and safety concerns which occur within a confined construction site environment.
Design/methodology/approach – This is achieved through conducting extensive qualitative and qualitative research in the form of case studies, interviews and questionnaire survey.
Findings – The leading managerial issues in the management of health and safety on a confined construction site are found to be: “Difficulty to move materials around site safely”; “Lack of adequate room for the effective handling of materials”; “Difficulty in ensuring site is tidy and all plant and materials are stored safely”; “Close proximity of individuals to operation of large plant and machinery”; and joint fifth “Difficulty in ensuring proper arrangement and collection of waste materials on-site” along with “Difficulty in controlling hazardous materials and equipment on site”.
Practical implications – The resulting implication for practice of these results can be summarised by identifying that with sustained development of urban centres on a global scale, coupled with the increasing complexity of architectural designs, the majority of on-site project management professionals are faced with the onerous task of completing often intricate designs within a limited spatial environment, under strict health and safety parameters.
Originality/value – The subsequent value of the findings are such that just as on-site management professionals successfully identify the various managerial issues highlighted, the successful management of health and safety on a confined construction site is attainable.
Resumo:
The aim of this paper is to identify and classify the numerous managerial issues encountered in the management of personnel in confined site construction. For the purpose of this research, a confined construction site is defined as a site where permanent works fit the site footprint, extending to levels above and/or below ground level, leaving spatial restrictions for other operations (e.g. plant and material movements, materials storage and temporary accommodation etc.) and require effective resource co-ordination beyond normal on-site management input. A literature review and analysis, case studies incorporating interviews and focus groups along with a questionnaire survey were used in order to gain a comprehensive insight into the issues in the management of personnel in a confined construction site environment. The following are the top five leading issues highlighted in the management of personnel in confined site construction; (1) Accidents due to an untidy site, (2) One contractor holding up another because of the lack of space, (3) A risk to personnel because of vehicular traffic on-site, (4) Difficult to facilitate several contractors at one work location, and (5) Numerous personnel working within the one space. In today’s modern environment, spatial restrictions are quickly becoming the norm in the industry. Therefore, the management of personnel on-site becomes progressively more difficult with the decrease in available space on-site. Where such environments exist, acknowledging the numerous issues highlighted above, aids site management in the supervision and co-ordination of personnel on-site, thus reducing accidents, increasing productivity and increase profit margins, in spatially restricted environments. As on-site management professionals successfully identify, acknowledge and counteract the numerous issues illustrated, the successful management of personnel on a confined construction site is achievable. By identifying the numerous issues, on-site management can proactively mitigate such issues through adopting counteractive measures and through successful identification of the traits identified.
Resumo:
Abstract
This chapter considers a range of legal and ethical issues raised by the use of reintegrative and disintegrative shaming techniques (Braithwaite, 1989) with sex offenders. ‘Disintegrative shaming’ labels and stigmatises offenders, ostracises them from the local community and may result in violence directed towards offenders (McAlinden, 2005, 2007). ‘Reintegrative shaming’, on the other hand, focuses on rehabilitating the offender within a supportive community environment and assisting the offender in their efforts to change. The former is evident in the range of recent legislative responses designed to protect the community from sex offenders such as notification as well as the popular demand for measures which ‘name and shame’ known sex offenders. The latter is more clearly related to restorative measures such as circles of support and accountability. This chapter argues that although traditionally at opposite ends of the intervention spectrum, each type of mechanism gives rise to potentially difficult legal and ethical considerations.