898 resultados para Quick Bird
Resumo:
A total of 108 eggs from a group of 100 brown laying hens housed in standard cages were analyzed. Thirty-six eggs were retired when the hens had 30 week of age, other 36 eggs were retired when the hens had 35 week of age and the remaining 36 eggs were retired five weeks afterwards. Each group of 36 eggs was radomly divided in three groups of 12 eggs. First group was analyzed at once, second group one was kept during one week in the refrigerator (5°C) and third group was kept also one week but on ambient temperature (25°C). Shell color, shell thickness, specific gravity, albumen height and Haugh units wre obtained. The bird age had significant effect on shell color and shell thickness, but the storage system had not influence on such variables. The hen age had not effect on specific gravity, but the storage system affected to this variable. Hen age and storage system had significant influence (P<0.05) on albumen height and Haugh units, and the interaction age × storage system was significant for these variables. The specific gravity had positive relations with shell thickness, yolk color, albumen height and Haugh units. It is concluded that bird age and storage system under high temperatures reduced the egg quality.
Resumo:
ABSTRACT: The comparison of the different bids in the tender for a project, with the traditional contract system based on unit rates open to and re-measurement, requires analysis tools that are able to discriminate proposals having a similar overall economic impact, but that might show a very different behaviour during the execution of the works. RESUMEN: La estimación rápida de costes en fases iniciales del proyecto por métodos paramétricos y referencias estadísticas es un tema bien estudiado, divulgado y aplicado en el sector de la construcción. Sin embargo, existe poca literatura técnica sobre sistemas de predimensionado de tiempos, que permitan realizar rápidamente una planificación con un grado de aproximación razonable. Este texto reúne dos aspectos ya conocidos, pero hasta ahora independientes, y una aportación propia: -La estimación del plazo final por referencias estadísticas (BCIS, 2000) - La estimación del reparto del coste total a lo largo de la ejecución mediante curvas "S" (diversos autores) La estimación de la duración de la ejecución de las actividades en función de su coste. El conjunto de estas tres técnicas, aplicadas a un proyecto, permite obtener una planificación con el suficiente grado de detalle y fiabilidad para tomar decisiones en fases iniciales del proyecto.