973 resultados para House construction


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Construction and demolition (C&D) waste occupies the largest share of overall waste generation in many countries. However, waste management practices and outcomes may differ between countries. For instance, in Australia, C&D waste recovery is continuously improving during the last years but the amount of C&D waste increases every year, as there has been little improvement in waste avoidance and minimization. In contrast, in Germany, waste generation remains constant over many years despite the continuous economic growth. The waste recycling rate in Germany is one of the highest in the world. However, most waste recycled is from demolition work rather than from waste generated during new construction. In addition, specific laws need to be developed to further reduce landfill of non-recycled waste. Despite of the differences, C&D waste generation and recovery in both countries depend on the effectiveness of the statutory framework, which regulates their waste management practices. This is an issue in other parts of the world as well. Therefore countries can learn from each other to improve their current statutory framework for C&D waste management. By taking Germany and Australia as an example, possible measures to improve current practices of C&D waste management through better statutory tools are identified in this paper. After providing an overview of the statutory framework of both countries and their status in waste generation and recovery, a SWOT analysis is conducted to identify strengths, weaknesses, opportunities and threats of the statutory tools. Recommendations to improve the current statutory frameworks, in order to achieve less waste generation and more waste recovery in the construction industry are provided for the German and Australian government and they can also be transferred to other countries.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Over the last few decades, construction project performance has been evaluated due to the increase of delays, cost overruns and quality failures. Growing numbers of disputes, inharmonious working environments, conflict, blame cultures, and mismatches of objectives among project teams have been found to be contributory factors to poor project performance. Performance measurement (PM) approaches have been developed to overcome these issues, however, the comprehensiveness of PM as an overall approach is still criticised in terms of the iron triangle; namely time, cost, and quality. PM has primarily focused on objective measures, however, continuous improvement requires the inclusion of subjective measures, particularly contractor satisfaction (Co-S). It is challenging to deal with the two different groups of large and small-medium contractor satisfaction as to date, Co-S has not been extensively defined, primarily in developing countries such as Malaysia. Therefore, a Co-S model is developed in this research which aims to fulfil the current needs in the construction industry by integrating performance measures to address large and small-medium contractor perceptions. The positivist paradigm used in the research was adhered to by reviewing relevant literature and evaluating expert discussions on the research topic. It yielded a basis for the contractor satisfaction model (CoSMo) development which consists of three elements: contractor satisfaction (Co-S) dimensions; contributory factors and characteristics (project and participant). Using valid questionnaire results from 136 contractors in Malaysia lead to the prediction of several key factors of contractor satisfaction and to an examination of the relationships between elements. The relationships were examined through a series of sequential statistical analyses, namely correlation, one-way analysis of variance (ANOVA), t-tests and multiple regression analysis (MRA). Forward and backward MRAs were used to develop Co-S mathematical models. Sixteen Co-S models were developed for both large and small-medium contractors. These determined that the large contractor Malaysian Co-S was most affected by the conciseness of project scope and quality of the project brief. Contrastingly, Co-S for small-medium contractors was strongly affected by the efficiency of risk control in a project. The results of the research provide empirical evidence in support of the notion that appropriate communication systems in projects negatively contributes to large Co-S with respect to cost and profitability. The uniqueness of several Co-S predictors was also identified through a series of analyses on small-medium contractors. These contractors appear to be less satisfied than large contractors when participants lack effectiveness in timely authoritative decision-making and communication between project team members. Interestingly, the empirical results show that effective project health and safety measures are influencing factors in satisfying both large and small-medium contractors. The perspectives of large and small-medium contractors in respect to the performance of the entire project development were derived from the Co-S models. These were statistically validated and refined before a new Co-S model was developed. Developing such a unique model has the potential to increase project value and benefit all project participants. It is important to improve participant collaboration as it leads to better project performance. This study may encourage key project participants; such as client, consultant, subcontractor and supplier; to increase their attention to contractor needs in the development of a project. Recommendations for future research include investigating other participants‟ perspectives on CoSMo and the impact of the implementation of CoSMo in a project, since this study is focused purely on the contractor perspective.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Old Government House, a former residence of the Queen’s representatives in Brisbane, Australia, symbolises British cultural heritage of Colonial Queensland. Located on the campus of the Queensland University of Technology, it is one of the oldest surviving examples of a stately residence in Queensland. Built in 1860s, the Old Government House was originally intended as a temporary residence for the first governor of the newly independent colony of Queensland. However, it remained the vice-regal residence until 1909, serving eleven succeeding governors. Nearly seven decades later, it became the first building in Queensland to be protected under heritage legislation. Thus its importance, as an excellent exemplar that demonstrates the significance of cultural heritage, was established. The Old Government House has survived 150 years of restoration work, refurbishments, and additions. Through these years, it has served the people of Queensland in a multitude of roles. This paper aims to investigate the survival of heritage listed buildings through their adaptive re-use. Its focus will be on the adaptive reuse of the Old Government House through its refurbishments and additions over a period of 150 years. Through a qualitative research process this paper will endeavour to establish the significance of restoration work on the Old Government house; the new opportunities that has opened up as a result of the restoration work; the continued maintenance and management of the building through adaptive re-use; the economic benefits of restoration work; and its contribution to the on-going interest in the preservation of the Tangible Cultural Heritage.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The study presented in this paper reviewed 9,358 accidents which occurred in the U.S. construction industry between 2002 and 2011, in order to understand the relationships between the risk factors and injury severity (e.g. fatalities, hospitalized injuries, or non-hospitalized injuries) and to develop a strategic prevention plan to reduce the likelihood of fatalities where an accident is unavoidable. The study specifically aims to: (1) verify the relationships among risk factors, accident types, and injury severity, (2) determine significant risk factors associated with each accident type that are highly correlated to injury severity, and (3) analyze the impact of the identified key factors on accident and fatality occurrence. The analysis results explained that safety managers’ roles are critical to reducing human-related risks—particularly misjudgement of hazardous situations—through safety training and education, appropriate use of safety devices and proper safety inspection. However, for environment-related factors, the dominant risk factors were different depending on the different accident types. The outcomes of this study will assist safety managers to understand the nature of construction accidents and plan for strategic risk mitigation by prioritizing high frequency risk factors to effectively control accident occurrence and manage the likelihood of fatal injuries on construction sites.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

IT-supported field data management benefits on-site construction management by improving accessibility to the information and promoting efficient communication between project team members. However, most of on-site safety inspections still heavily rely on subjective judgment and manual reporting processes and thus observers’ experiences often determine the quality of risk identification and control. This study aims to develop a methodology to efficiently retrieve safety-related information so that the safety inspectors can easily access to the relevant site safety information for safer decision making. The proposed methodology consists of three stages: (1) development of a comprehensive safety database which contains information of risk factors, accident types, impact of accidents and safety regulations; (2) identification of relationships among different risk factors based on statistical analysis methods; and (3) user-specified information retrieval using data mining techniques for safety management. This paper presents an overall methodology and preliminary results of the first stage research conducted with 101 accident investigation reports.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

There is increasing concern about the impact of employees‟ alcohol and other drug (AOD) consumption on workplace safety and performance, particularly within the construction industry. While most Australian jurisdictions have identified this as a critical safety issue, information is limited regarding the prevalence of AODs in the workplace and there is limited evidential guidance regarding how to effectively and efficiently address such an issue. The current research aims to scientifically evaluate the use of AODs within the Australian construction industry in order to reduce the potential resulting safety and performance impacts and engender a cultural change in the workforce - to render it unacceptable to arrive at a construction workplace with impaired judgement from AODs. The study will adopt qualitative and quantitative methods to firstly evaluate the extent of general AOD use in the industry. Secondly, the development of an appropriate industry policy will adopt a non-punitive and rehabilitative approach developed in consultation with employers and employees across the infrastructure and building sectors, with the aim it be adopted nationally for adoption at the construction workplace. Finally, an industry specific cultural change management program and implementation plan will be developed through a nationally collaborative approach. Final results indicate that a proportion of those sampled in the construction sector may be at risk of hazardous alcohol consumption. A total of 286 respondents (58%) scored above the cut-off cumulative score for risky or hazardous alcohol. Other drug use was also identified as a major issue. Results support the need for evidence-based, preventative educational initiatives that are tailored to the industry. This paper will discuss the final survey and interview results.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Client owners usually need an estimate or forecast of their likely building costs in advance of detailed design in order to confirm the financial feasibility of their projects. Because of their timing in the project life cycle, these early stage forecasts are characterized by the minimal amount of information available concerning the new (target) project to the point that often only its size and type are known. One approach is to use the mean contract sum of a sample, or base group, of previous projects of a similar type and size to the project for which the estimate is needed. Bernoulli’s law of large numbers implies that this base group should be as large as possible. However, increasing the size of the base group inevitably involves including projects that are less and less similar to the target project. Deciding on the optimal number of base group projects is known as the homogeneity or pooling problem. A method of solving the homogeneity problem is described involving the use of closed form equations to compare three different sampling arrangements of previous projects for their simulated forecasting ability by a cross-validation method, where a series of targets are extracted, with replacement, from the groups and compared with the mean value of the projects in the base groups. The procedure is then demonstrated with 450 Hong Kong projects (with different project types: Residential, Commercial centre, Car parking, Social community centre, School, Office, Hotel, Industrial, University and Hospital) clustered into base groups according to their type and size.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

22 mins documentary

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Although the drivers of innovation have been studied extensively in construction, greater attention is required on how innovation diffusion can be effectively assessed within this complex and interdependent project-based industry. The authors draw on a highly cited innovation diffusion model by Rogers (2006) and develop a tailored conceptual framework to guide future empirical work aimed at assessing innovation diffusion in construction. The conceptual framework developed and discussed in this paper supports a five-stage process model of innovation diffusion namely: 1) knowledge and idea generation, 2) persuasion and evaluation; 3) decision to adopt, 4) integration and implementation, and 5) confirmation. As its theoretical contribution, this paper proposes three critical measurements constructs which can be used to assess the effectiveness of the diffusion process. These measurement constructs comprise: 1) nature and introduction of an innovative idea, 2) organizational capacity to acquire, assimilate, transform and exploit an innovation, and 3) rates of innovation facilitation and adoption. The constructs are interpreted in the project-based context of the construction industry, extending the contribution of general management theorists. Research planned by the authors will test the validity and reliability of the constructs developed in this paper.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper extends the understanding of working-time changes and work-life balance (WLB) through analyzing a case study where a reduction in working hours designed to assist the workforce in balancing work and nonwork life was implemented. An alliance project in the Australian construction industry was established initially with a 5-day working week, a departure from the industry-standard 6-day week. However, a range of factors complicated the success of this initiative, and the industry-standard 6-day working week was reinstated for the project. The authors argue that this case is valuable in determining the complex mix of influences that work against a wholesale or straightforward adoption of working-time adjustments and work-life balance practices. It is concluded that although the prevailing workplace culture is considered an important factor in the determination of working time, structural and workplace principles and practices may also be critical in working to secure the successful introduction of working-time reduction and work-life balance initiatives in the construction industry in the future.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

To enhance workplace safety in the construction industry it is important to understand interrelationships among safety risk factors associated with construction accidents. This study incorporates the systems theory into Heinrich’s domino theory to explore the interrelationships of risks and break the chain of accident causation. Through both empirical and statistical analyses of 9,358 accidents which occurred in the U.S. construction industry between 2002 and 2011, the study investigates relationships between accidents and injury elements (e.g., injury type, part of body, injury severity) and the nature of construction injuries by accident type. The study then discusses relationships between accidents and risks, including worker behavior, injury source, and environmental condition, and identifies key risk factors and risk combinations causing accidents. The research outcomes will assist safety managers to prioritize risks according to the likelihood of accident occurrence and injury characteristics, and pay more attention to balancing significant risk relationships to prevent accidents and achieve safer working environments.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Developers and policy makers are consistently at odds over the debate as to whether impact fees increase house prices. This debate continues despite the extensive body of theoretical and empirical international literature that discusses the passing on to home buyers of impact fees, and the corresponding increase to housing prices. In attempting to quantify this impact, over a dozen empirical studies have been carried out in the US and Canada since the 1980’s. However the methodologies used vary greatly, as do the results. Despite similar infrastructure funding policies in numerous developed countries, no such empirical works exist outside of the US/Canada. The purpose of this research is to analyse the existing econometric models in order to identify, compare and contrast the theoretical bases, methodologies, key assumptions and findings of each. This research will assist in identifying if further model development is required and/or whether any of these models have external validity and are readily transferable outside of the US. The findings conclude that there is very little explicit rationale behind the various model selections and that significant model deficiencies appear still to exist.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Shanghai possesses an apt legacy, once referred to as ‘Paris of the East’. Municipal aspirations for Shanghai to assume a position among the great fashion cities of the world have been integrated in the recent re-shaping of this modern city into a role model for Chinese creative enterprise yet China is still known primarily as centre of clothing production. Increasingly however, ‘Made in China’ is being replaced by ‘Created in China’ drawing attention to two distinct consumer markets for Chinese designers. Fashion designers who have entered the global fashion system for education or by showing their collections have generally adopted a design aesthetic that aligns with Western markets, allowing little competitive advantage. In contrast, Chinese designers who rest their attention on the domestic Chinese market find a disparate, highly competitive marketplace. The pillars of authenticity that for foreign fashion brands extend far into their cultural and creative histories, often for many decades in the case of Louis Vuitton, Hermes and Christian Dior do not yet exist in China in this era of rapid globalisation. Here, the cultural bedrock allows these same pillars to extend only thirty years or so into the past reaching the moments when Deng Xiaoping granted China’s creative entrepreneurs passage. To this end, interviews with fashion designers in Shanghai have been undertaken during the last twelve months for a PhD dissertation. Production of culture theory has been used to identify working methods, practices of production and the social and cultural milieu necessary for designers to achieve viability. Preliminary findings indicate that some fashion designers have adopted an as-yet unexplored strategy of business and brand development with a distinct Chinese aesthetic at its core, in contrast to the clichéd cultural iconography often viewed by Western viewers as representative of Chinese creativity. The development of this aesthetic is similar to the development of the Scandinavian design ethos that emerged during the 1950s.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Resumo: Esse artigo apresenta os resultados parciais de uma pesquisa em andamento que, a partir do método etnográfico, investiga os projetos de comunicação comunitária, jornalismo e fotojornalismo desenvolvidos por duas organizações não-governamentais na cidade do Rio de Janeiro. O trabalho de campo, realizado durante três meses nas favelas cariocas, forneceu questões teóricas relevantes para os estudos do jornalismo, destacando-se as problematizações sobre a noção de valores-notícia. Voltados para a produção de narrativas centradas no cotidiano das comunidades, os fotojornalistas populares consideram fundamental discutir os valores-notícia formulados pela grande imprensa e propor “contra-valores”.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The research described in this paper forms part of an in-depth investigation of safety culture in one of Australia’s largest construction companies. The research builds on a previous qualitative study with organisational safety leaders and further investigates how safety culture is perceived and experienced by organisational members, as well as how this relates to their safety behaviour and related outcomes at work. Participants were 2273 employees of the case study organisation, with 689 from the Construction function and 1584 from the Resources function. The results of several analyses revealed some interesting organisational variance on key measures. Specifically, the Construction function scored significantly higher on all key measures: safety climate, safety motivation, safety compliance, and safety participation. The results are discussed in terms of relevance in an applied research context.