909 resultados para Heihe river watershed
Resumo:
Phase 2 of the Saylor Creek Improvement Project is focused on channel restoration. The existing stream channel is generally incised, running through areas primarily covered with heavy trees, brush and weeds. The ravine ranges from 6 to 20 feet deep through the corridor with very steep slopes in several areas. In two areas storm outlets are undercut or suspended above the channel. Tall undercut, eroded banks exist along several of the outside bends. Sediment deposition on the inside bends limits the cross-section of the channel, increasing flow velocity and forcing this faster flow toward the eroded outside bank. A wide array of practices will need to be implemented to address channel erosion. Improvements will be specifically tailored to address problems observed at each bend. The result will be a channel with a more natural appearance, and reduced use of hard armor and revetment. Some sections will require minimal grading with removal of underbrush for improved maintenance access and more sun exposure, better allowing deep rooted plants and flowers to establish to provide further erosion protection. Straight sections with steep banks will require grading to pull back slopes, increasing the creek's capacity to convey storm flows at slower velocities. Sections with sharp bends will require slope pull back and armor protection. A constructed wetland will collect and treat runoff from a small sub-watershed, before being discharged into the main tributary.
Resumo:
The Muchakinock Creek Watershed Project began in February of 2005 to treat upland soil erosion in the creek that has lead to a 303(d) impairment. The Mahaska SWCD is currently administering this cost-share program to promote terraces, basins and grade stabilization structures. The District is now seeking funding from WIRB to treat specific abandoned mine lands in the Muchakinock Creek Watershed. These areas contribute sediment to the creek at levels second only to agricultural lands as well as acid mine drainage from open pits mines that have been left to decay across the county. The WIRB funding would be used to compliment Federal Abandoned Mine Land (AML) funding in the reclamation of these areas.
Resumo:
The Rathbun Land and Water Alliance and partners have implemented a uniquely effective approach to water quality protection through the Rathbun Lake Special Project. This approach is achieving a significant reduction in the sediment and phosphorus that impair water quality in Rathbun Lake and its tributaries as a result of the targeted application of best management practices (BMPs) for priority land in the watershed. This project application proposes to assist landowners to apply BMPs that will reduce sediment and phosphorus delivery from priority land in four targeted sub-watersheds as part of the Rathbun Lake Special Project. Features of this project are: (1) use of geographic information system (GIS) analysis to identify priority land that requires BMPs; (2) assistance for landowners to apply BMPs on 5,100 acres that will reduce the annual delivery of sediment by 8,130 tons and phosphorus by 35,980 pounds; (3) evaluation of the benefits from BMP application using GIS analysis and water quality monitoring; and (4) watershed outreach activities that encourage landowners to apply BMPs for priority land to protect water quality.
Resumo:
With the Saylor Creek Watershed Improvement Project, Iowa Heartland RC&D and other area stakeholders have an opportunity to display how "best management practices" (BMPs) can reduce storm water runoff and improve the quality of that runoff in an urban setting. Conservation design is a uew approach to storm water management that addresses the negative impacts of storm water runoff and turns them into a positive. The master plan for the Prairie Trail development surrounding the watershed project will incorporate bioretention cells, bioswales, buffer strips, rain gardens, as well as native plant landscaping to slow storm water runoff and naturally clean sediment out of the water before it reaches Saylor Creek. In addition to conservation design elements, the project will utilize storm water detention ponds and creek bed restoration to develop a complete storm water "treatment train" system within Prairie Trail. The extensive use of conservation storm water management for Prairie Trail is unique for urban development in Iowa.
Resumo:
Mills County proposes to reduce the identified impairment of the watershed, Keg Creek, by eliminating one of the main reasons for the impairment - non-conforming, on-site septic tanks that allow effluent to drain into the creek from the unincorporated community of Mineola. This has been identified by the county as a major priority. Therefore, the county proposes to construct a collection system and lagoon treatment facility, which would eliminate effluent from draining into Keg Creek. Regional Water will own, operate, and manage the collection and treatment systems in Mineola for Mills County.
Resumo:
Upper Catfish Creek is located in a 9,300-acre watershed that flows through two significant natural resources, Swiss Valley Park and Swiss Valley Nature Preserves, one of the largest nature preserves in the Midwest. According to DNR’s 2002 305(d) report, that portion of the creek within the park and preserve is classified as a Class B(CW) cold water stream of which a portion has naturally reproducing trout (one of only 30 in the state of Iowa with this capability). Urban sprawl is a real threat to the Upper Catfish Creek Watershed. Currently, 10% of the watershed is residential, but 27% is zoned residential or commercial. The watershed is near Dubuque city limits but the jurisdiction is in the county. Differing criteria for land development between city and county jurisdictions further entices developers to build in outlying areas. County leaders agree there is more that needs to be done and will work with municipalities on uniformity of regulations and follow-up measures. We propose to set up key urban conservation practice models that will address storm water runoff and water quality which can be learned about and viewed by city and county officials, engineers, developers, etc. This would be part of a larger initiative including an educational campaign, inter-jurisdictional planning, the development of a land use GIS database, and agricultural conservation practices. The successes coming out of and learned about this watershed will serve as a model to spread county-wide.
Resumo:
This watershed project will provide technical and financial assistance to improve surface and groundwater quality. This will be accomplished by installing an alternative tile outlet for 3 agricultural drainage wells (ADWs) and providing incentives to implement nutrient and pest management.
Resumo:
Clear Lake, Iowa's third largest natural lake, is a premier natural resource and popular recreational destination in north central Iowa. Despite the lake's already strong recreational use, water quality concerns have not allowed the lake to reach its full potential. Clear Lake is listed on Iowa's 2004 303(d) Impaired Waters List due to excessive levels of phosphorus, bacteria, and turbidity. Urban storm water runoff from the 8,600 acre watershed is a significant contributor to Clear Lake's impairment. Local communities have been working towards the goal of making improvements at all 30 storm water outlets that have a drainage area of five acres or more and have a cost effective solution. Many improvements have already been made, and now there are only seven storm water outlet sites remaining that still need protection in order to meet the goal. The storm water improvements have been very effective in reducing contaminants in urban runoff, achieving reduction levels in the 50-80% range. The proposed Clear Lake Storm Water Improvement Project will address the remaining seven outlet sites and take place over three years. The first year will consist of performing engineering and design of storm water best management practices (BMPs) at the seven outlet sites to determine if a cost effective solution exists for each. Years two and three will consist of installing two storm water improvements each year to implement the most cost effective BMPs at a minimum of four of the seven sites. The grant request addresses one of the main priorities of the Iowa Watershed Improvement Grant: storm water runoff.
Resumo:
The Mississippi River Trail (MRT) is a world-class bicycle trail that will follow the Mississippi River all the way from its headwaters in Minnesota to the Gulf of Mexico. The trail is partially completed; much of it is still in the planning and development stages. When complete, the MRT will Link over 2,000 miles of recreational trails through 10 states, including 280 miles in Iowa. Designated as a National Millennium Trail, the MRT will preserve natural environments along the river, stimulate economic growth in river communities, and provide bicyclists access to a variety of landscapes, history, and culture. The Iowa Department of Transportation commissioned the Center for Transportation Research and Education at Iowa State University to develop a plan for a safe, economically beneficial, and scenic MRT route through Iowa. This report presents the MRT plan for Iowa. It is organized in the following chapters: Executive Summary; (1) Introduction - vision statement and objectives; (2) Iowa MRT Minimum Design Standards; (3) Iowa MRT Route Analysis; (4) Recommended Improvement Plan; (5) MRT Implementation; and (6) Estimated Benefits and Impacts of the Iowa MRT. Additional information is provided in the following appendices: (A) GIS Analysis for the MRT; (B) Iowa MRT Maps; (C) Public Input; (D) Public Comments; and (E) References.
Resumo:
Dry Run Creek Watershed was designated an impaired waterbody by DNR in 2002, following an assessment of the biota in the stream by DNR Biologist, Tom Wilton. Subsequent studies by IOWATER Snapshot effort in 2003, found e-coli bacteria concentrations and high nitrate readings in excess of the State of Iowa limits for recreational streams. The Dry Run Creek Watershed Improvement Project is comprised of five major components. Three components will feature demonstrations of structural best management practices (BMPs) to protect water quality in Dry Run Creek. The fourth is an educational workshop to "kick-off" the initiative and background the stakeholders of the watershed in new stormwater management strategies for water quality protection. The fifth is a monitoring program that will provide data on the effectiveness of the practices to be demonstrated. Measurable outcomes from these projects include monitoring to document the effectiveness of infiltration based BMPs to reduce pollutant loading in urban stormwater runoff and reducing the volume of stormwater discharged directly into Dry Run Creek via storm sewer flows. Understanding of and social acceptance of new stormwater strategies and practices will also be monitored by surveys of watershed stakeholders and compared to findings of a survey done before the start of the project.
Resumo:
The Rathbun Land and Water Alliance and partners have implemented a unique approach to water quality protection through the Rathbun Lake Special Project. This approach is achieving a significant reduction in the sediment and phosphorus that impair water quality in Rathbun Lake and its tributaries as a result of the targeted application of best management practices (BMPs) for priority land in the watershed. This project application proposes to assist landowners to apply BMPs that will reduce sediment and phosphorus delivery from priority land in two targeted sub-watersheds as part of the Rathbun Lake Special Project Features of this project are: (1) use of geographic information system (GIS) analysis to identify priority land that requires BMPs; (2) assistance for landowners to apply BMPs on more than 2,200 acres that will reduce sediment and phosphorus delivery by 3,300 tons and 13,300 pounds per year respectively; (3) evaluation of the benefits from BMP application using GIS analysis and water quality monitoring; and (4) watershed outreach activities that encourage landowners to apply BMPs for priority land to protect water quality.
Resumo:
In-lake management can be a critical need for water quality improvement for impaired recreation lakes. Biomanipulation practices to achieve the proper balance of predatory fish, zooplankton grazing of algae, and native aquatic vegetation can sometimes restore water clarity of turbid, nutrient enriched lakes. Lakewood leaders have a renovation plan for Lake Colchester, involving several common and three innovative practices. Lakewood is prepared to pay for proven practices, but seeks WIRB grant support to test innovations in collaboration with Iowa DNR biologists, and ISU limnologists, serving as advisors and monitors for the entire project.
Resumo:
Farmers Creek is a moderately flowing stream that winds through seventeen miles of central Jackson County, encompassing a watershed area of 30,590 acres. Due to nutrient loading and sedimentation, the stream was placed on Iowa’s 303(d) List of Impaired Waters in 2002. A three year grant project was initiated in January 2005 to reduce both sediment delivery and phosphorus levels by 40% in critical areas along the stream corridor. Over thirty-five BMP’s were started in the first nine months of this project. Funding through WIRB is being requested specifically for streambank stabilization and protection projects not covered by other cost-share programs. Innovative project designs and techniques will be installed and act as demonstration sites. Projects may include jetties, weirs, cedar revetments, cattle crossings, and fencing. To assist in excluding cattle from the stream, watering systems such as slingpumps, pasture pumps, or water rams will be installed, in conjunction with filter strips and riparian buffers.
Resumo:
The goal of this project is to help residents of the Hewitt Creek watershed identify themselves as a watershed community and use cost-effective approaches to control non-point source nutrient and sediment contaminants according to collective science-based environmental goals. The project will tap the low-cost, high-return human resources of local knowledge and resident leadership for economical and sustainable solutions. A watershed council will implement an incentive program to engage their watershed community in locally-acceptable practices and performance (outcome) measures for environmental stewardship that have reasonable cost and are linked with accountable crop and livestock management decisions. The Iowa and Dubuque County Farm Bureau have supported one year of management practice incentives. The performance incentive program will take this effort to the next level, to focus on outcomes.
Resumo:
Viking Lake State Park is beautiful resource which has been special to residents of Southwest Iowa and visitors from around the region. Unfortunately, Viking Lake itself is being impacted by non-point source pollution. Water quality conditions are becoming the reason that visitors are shying away from the park instead of flocking to it. To combat these non-point source problems the Viking Lake Water Quality Project has been initiated and $327,000 has been allocated through the Section 319/WSPF Program which will address water quality concerns in the watershed. Additionally, IDNR Fisheries is preparing for an entire renovation of Viking Lake in 2006. One funding gap remains, that may prevent this comprehensive water quality project from achieving a successful endpoint. Funds are still needed for the renovation of malfunctioning septic systems at Viking Village housing development which is adjacent to the park, and has been identified as a primary source of contamination entering the lake. The intent of this application is to secure funds so that these septic system problems can be corrected and water quality conditions of this important natural resource restored for public enjoyment.