1000 resultados para Final disposals
Resumo:
Viking Lake State Park is beautiful resource which has been special to residents of Southwest Iowa and visitors from around the region. Unfortunately, Viking Lake itself is being impacted by non-point source pollution. Water quality conditions are becoming the reason that visitors are shying away from the park instead of flocking to it. To combat these non-point source problems the Viking Lake Water Quality Project has been initiated and $327,000 has been allocated through the Section 319/WSPF Program which will address water quality concerns in the watershed. Additionally, IDNR Fisheries is preparing for an entire renovation of Viking Lake in 2006. One funding gap remains, that may prevent this comprehensive water quality project from achieving a successful endpoint. Funds are still needed for the renovation of malfunctioning septic systems at Viking Village housing development which is adjacent to the park, and has been identified as a primary source of contamination entering the lake. The intent of this application is to secure funds so that these septic system problems can be corrected and water quality conditions of this important natural resource restored for public enjoyment.
Resumo:
An overall effort has been initiated to improve the quality of the Yellow River in Northeast Iowa by reducing the amount of sediment and bacteria entering the stream. Funding for this project will be utilized to improve stream quality to the level of fully supporting game fish such as brown, rainbow and brook trout, walleye, northern pike and smallmouth bass. The Yellow River has the potential to be one of the top trout streams, not only in Iowa, but in the entire Upper Midwest. This project will greatly enhance recreational activities such as fishing, canoeing and inner tubing and will greatly increase tourism dollars to the state. The project will specifically address two sources of impairment: stream bank erosion and coliform bacteria from both livestock and inadequate human septic systems.
Resumo:
The Dickinson SWCD is applying for $486,800 over three years from the Watershed Improvement Fund to enhance water quality in Dickinson County through an impairment-based, locally directed watershed improvement project dealing specifically with storm water runoff. The LID Project will provide a cost share incentive and technical expertise to individual and business owners in specially targeted districts who are willing to implement low impact development techniques such as rain gardens, bioswales, pervious paving to reduce storm water runoff from their properties. Goals for the project include: 1) Defining and prioritizing urban watersheds in the Iowa Great Lakes region for implementation of Low Impact Development Practices; 2) Providing technical expertise in the form of a graduate assistant/project manager to design and oversee construction; 3) Continuing public education of such practices and their local existence through project kiosk, brochures, County Naturalist programs, local cable television shows, tours and other interactions of the Clean Water Alliance with its 50 partners in the area concerned about water quality; and 4) Completing 125 separate projects over a three year period.
Resumo:
The Watershed Improvement Review Board (WIRB) Grant will be used to enhance an on-going water quality project in Elk River Watershed. A targeted, locally controlled project has been active in the watershed since 2001. Current funding is being received primarily from the EPA-319 program, administrated by IDNR and the Watershed Protection Fund (WSPF) administrated by IDALS-DSC. Substantial funding is also obtained from the yearly county allocation of the Environmental Quality Incentive Program (EQIP) administrated by the USDA-NRCS. The overall objective of the Elk River Water Quality Project is to improve and restore the water quality in this water body by keying in on the potential sources of the identified impairments, and forging a working partnership between the local residents and the conservation agencies and organizations involved in the project. The major potential sources of the known surface water quality problems were identified during the assessment process and pointed to feedlot runoff and sediment delivery from within priority sub-watersheds. WIRB Funds will be used to cost share the application of Best Management Practices, thus reducing the projects dependency on federal funds. Funds will also be used to overcome a project’s limiting factor associated with insufficient technical assistance.
Resumo:
This project proposes a unique approach to addressing one of the more challenging issues facing efforts to protect water quality in Rathbun Lake; reducing sediment and phosphorus delivery from land on which best management practices (BMPs) will not be applied. This project will construct ten impoundments at key locations in the watershed to reduce the annual delivery of 2,970 tons of sediment and 12,100 pounds of phosphorus to Rathbun Lake. Features of this approach are: (a) impoundments will be constructed at sites below areas with high concentrations of priority land that has the greatest potential to deliver sediment and phosphorus to Rathbun Lake and on which landowners are unable or unwilling to apply BMPs and (b) strategically placed, large impoundments can be a cost effective means of reducing the sediment and phosphorus delivered to Rathbun Lake from priority land on which BMPs will not be applied. This project will significantly enhance the success of efforts underway in the Rathbun Lake Special Project as it addresses a critical water quality protection need that is not being met by current Special Project activities.
Resumo:
This project will include the construction of four separate drainage and retention facilities to handle urban runoff that currently flows directly into Lake Storm Lake. These facilities will filter storm water from approximately 503 acres of urban land including two large industrial users Tyson Fresh Meats and Sara Lee Turkey Processing as well as other commercial and residential sections that currently go directly to the lake without filtration. Specifically the project involves the construction of a two cell dry bottomed detention pond system, construction of two rain gardens/bio retention areas, construction of rain gardens along storm water intakes on Highway 7, and construction of a porous rock detention area. The completed project will provide for cleaner water outleting to the fake in an area that has the largest potential for pollutants to enter the lake. This project is being done in conjunction with other watershed improvements including two additional rain gardens already in place and a multi-year dredging effort of Lake Storm Lake that will be starting its fifth year in 2006. Improvements in the rural water shed are also taking place with the help of a watershed coordinator. Some of these projects include buffer strips and filter slips along the waterways in the watershed.
Resumo:
Farmers Creek is a moderately flowing stream that winds through seventeen miles of central Jackson County, encompassing a watershed area of 30,590 acres. Due to nutrient loading and sedimentation, the stream was placed on Iowa’s 303(d) List of Impaired Waters in 2002. A three year grant project was initiated in January 2005 to reduce both sediment delivery and phosphorus levels by 40% in critical areas along the stream corridor. Over thirty-five BMP’s were started in the first nine months of this project. Funding through WIRB is being requested specifically for streambank stabilization and protection projects not covered by other cost-share programs. Innovative project designs and techniques will be installed and act as demonstration sites. Projects may include jetties, weirs, cedar revetments, cattle crossings, and fencing. To assist in excluding cattle from the stream, watering systems such as slingpumps, pasture pumps, or water rams will be installed, in conjunction with filter strips and riparian buffers.
Resumo:
Lake Macbride is considered to be one of the top four lakes for fishing in the state of Iowa. It is widely used by the public and contributes significant economic benefits to the county. Lake Macbride is situated in the North Corridor which is one of the fastest growing areas in the state. The lake has a surface area of 940 acres and drains 16,205 acres. Lake Macbride is on the Iowa 303(d) list for excessive sediments and nutrients. In 2001, Lake Macbride State Park received over 2.5 million dollars from the Marine Fuel Tax and Fish and Wildlife Trust to install 2 silt basins and stabilize over 12 miles of shoreline in the lake. Also in 2001, the Johnson County SWCD received a WSPF allocation from DSC to address agriculture and urban runoff issues in the watershed. Section 319 funding was received in 2002 to continue watershed efforts to the present. A watershed assessment was completed in 2003 to guide watershed activities. In 2005, a TMDL was completed for the lake. Since 2001, over $645,000 dollars has been spent by landowners and funding partners to install conservation practices in the watershed. Watershed efforts have resulted in the reduction of over 4200 tons of soils from being delivered into Lake Macbride. Nutrient reductions have also occurred from the development of nutrient management plans on 2000 acres. The District is in the process of wrapping up watershed efforts on private land. A series of 13 structures is planned to be installed in the State Park over the next several years. One of the last remaining items that still needs addressed is 1,400 feet of eroding shoreline adjacent to Lake Macbride along Cottage Reserve Road. The road is under the jurisdiction of the Johnson County Board of Supervisors. Both the Board of Supervisors and the IDNR are willing to contribute substantial dollars to address the 250 tons of soil that are being directly delivered to Lake Macbride each year.
Resumo:
The enclosed project request for funding will address needed conservation work within the Storm Lake Watershed. The proposed conservation practices and activities have been planned for several years but due to funding limitations have not been completed. These innovative practices will address some of the remaining and hard to address problem areas of sediment and nutrient loading within the watershed. The four goals of this project are: installation of four in-stream Boulder Weirs, planting of native grasses around ten surface intakes, completion of three urban rain gardens and hiring of a part-time Iowater monitoring coordinator. Through the new Awaysis destination park project Storm Lake is truly placing a high value on our watershed and lake as a major asset to the area. Awaysis is a $30 million project that's success will hinge on maintaining the highest standards in regard to the water quality of the lake and its watershed.
Resumo:
The purpose of this project is to develop a management plan to address the City of Alta’s stormwater runoff. Currently, there is no management plan and the city is growing, so there are increased runoff problems from both residential and industrial sources. A large assortment of pollutants flow from these areas, examples include various forms of sediment, paper, plastic, gravel and metal as well as less visible potentially toxic pollution from lawns, streets, gas stations and other commercial and industrial areas. The goal for this project is to construct two infiltration/detention basins to protect water quality and reduce the peak volume of the City of Alta’s urban runoff. Each basin is designed with two functions: Control gully erosion and surface erosion with detention, while incorporating water quality through infiltration. The downstream erosion control provided by detaining runoff will reduce sediment delivery to Powell Creek and protect downstream agricultural land from urban runoff. The infiltration features designed into the basins will capture pollutants commonly associated with urban stormwater runoff such as: sediment, sand, gravel hydrocarbons, particulate matter, heavy metals, and nutrients.
Resumo:
The Iowa County Soil and Water Conservation District is applying on behalf of the unincorporated community of Conroy to construct a wastewater collection and treatment system to assist in the cleanup and protection of the Clear Creek Watershed. Conroy sits at the headwaters of Clear Creek. Monitoring of the watershed has shown consistently high levels of E.coli bacteria and chloride near the upper end of the creek. In addition, toilet paper and fecal material have been observed on numerous occasions. These are obvious health threats to the residents of the watershed. The monitoring of the watershed, coupled with lab analysis, suggest septic inputs are negatively impacting the headwaters of Clear Creek. A new sewer system for the community of Conroy will eliminate illegal discharges into the creek and be the first step in the overall protection of the watershed and the water quality therein.
Resumo:
Clear Lake, Iowa's third largest natural lake, is located in Cerro Gordo County in north-central Iowa. The lake is a premier natural resource and popular recreational destination in north central Iowa, providing more than $40 million dollars annually to the local economy. Despite the lake's already strong recreational use, water quality concerns have not allowed the lake to reach its full recreational potential. Clear Lake is listed on Iowa's 2004 303(d) Impaired Waters List due to excessive levels of phosphorus, bacteria, and turbidity. Urban storm water runoff from the 8,600 acre watershed is a significant contributor to Clear Lake's impairment. There are over 68 storm water outlet points in the Clear Lake watershed that allow untreated urban runoff to empty directly into Clear Lake. Local governments have been very active in installing storm water Best Management Practices (BMPs) at as many of the outlets that current funding allows. To date, 11 of the 68 sites (16%) have been protected. These improvements have been very effective in reducing contaminants in the storm water runoff, but the remaining outlets still need protection. The first phase of this grant request is for an investigation of 10 storm water outlet sites to determine the most cost effective BMP for each site. The second phase of the grant request is to implement the BMPs deemed most cost effective at 5 of the 10 sites investigated. The grant request addresses one of the main priorities of the Iowa Watershed Improvement Grant: storm water runoff.
Resumo:
Holiday Lake is included in the Walnut Creek watershed, which is listed on the 303(d) list of impaired water bodies. Research indicates that the causes of impairment are sedimentation and habitat alterations. To improve water quality, the goals of this project are to reduce the sediment delivery into Holiday Lake by 50% and assist in educating watershed residents about cost-effective ways to control sediment and nutrient contaminates. The best management practices will be installed to filter the water, reducing sediment and chemical loading into the lake. When all practices are installed, nearly 100% of the lake’s drainage area will be controlled.
Resumo:
Manteno Lake is located 8 miles northwest of Earling, IA in Shelby County. The lake has been impaired with an overload of silt and nutrients. In October of 2007, land directly north of the lake will be coming out of CRP and back into agricultural production. The Shelby Soil and Water Conservation District, Shelby County Board of Supervisors and Shelby County Conservation Board feel strongly that treatment of this area is necessary prior to the CRP contract expiring. The placement and construction of three structures will reduce the amount of silt and nutrients affecting Manteno Lake. This project calls for the construction of three structures on crucial tributaries to the lake.
Resumo:
With WIRB funding the Fox River Ecosystem Development board will continue to install prioritized practices identified by assessments within the impaired segment of Fox River. The FRED board is also asking to continue funding for a new 5 year position for assessment, planning and technical assistance. With new assessments and water quality monitoring already being done on the impaired segment of the Fox River a lot of valuable information is at hand. Ecosystem Development board is requesting funding from WIRB to install grade stabilization structures, water sediment basins, and terraces to reduce sediment delivery to Fox River. The FRED board in both Iowa and Missouri are committed not only to seek funding to continue water quality efforts for more practices but also to enhance and protect existing practices and investments that protect our water quality and economic viability in both states. We are off to a good start and want to continue our progress on the Fox River.