679 resultados para CORROSION


Relevância:

10.00% 10.00%

Publicador:

Resumo:

This research project investigated the effects of concentrated brines of magnesium chloride, calcium chloride, sodium chloride, and calcium magnesium acetate on portland cement concrete. Although known to be effective at deicing and anti-icing, the deleterious effects these chemicals may have on concrete have not been well documented. As a result of this research, it was determined that there is significant evidence that magnesium chloride and calcium chloride chemically interact with hardened portland cement paste in concrete resulting in expansive cracking, increased permeability, and a significant loss in compressive strength. Although the same effects were not seen with sodium chloride brines, it was shown that sodium chloride brines have the highest rate of ingress into hardened concrete. This latter fact is significant with respect to corrosion of embedded steel. The mechanism for attack of hardened cement paste varies with deicer chemical but in general, a chemical reaction between chlorides and cement hydration products results in the dissolution of the hardened cement paste and formation of oxychloride phases, which are expansive. The chemical attack of the hardened cement paste is significantly reduced if supplementary cementitious materials are included in the concrete mixture. Both coal fly ash and ground granulated blast furnace slag were found to be effective at mitigating the chemical attack caused by the deicers tested. In the tests performed, ground granulated blast furnace slag performed better as a mitigation strategy as compared to coal fly ash. Additionally, siloxane and silane sealants were effective at slowing the ingress of deicing chemicals into the concrete and thereby reducing the observed distress. In general, the siloxane sealant appeared to be more effective than the silane, but both were effective and should be considered as a maintenance strategy.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The main objective of this study is to determine the effectiveness of the Electrochemical Chloride Extraction (ECE) technique on a bridge deck with very high concentrations of chloride. This ECE technique was used during the summer of 2003 to reverse the effects of corrosion, which had occurred in the reinforcing steel embedded in the pedestrian bridge deck over Highway 6, along Iowa Avenue, in Iowa City, Iowa, USA. First, the half cell potential was measured to determine the existing corrosion level in the field. The half-cell potential values were in the indecisive range of corrosion (between -200 mV and -350 mV). The ECE technique was then applied to remove the chloride from the bridge deck. The chloride content in the deck was significantly reduced from 25 lb/cy to 4.96 lb/cy in 8 weeks. Concrete cores obtained from the deck were measured for their compressive strengths and there was no reduction in strength due to the ECE technique. Laboratory tests were also performed to demonstrate the effectiveness of the ECE process. In order to simulate the corrosion in the bridge deck, two reinforced slabs and 12 reinforced beams were prepared. First, the half-cell potentials were measured from the test specimens and they all ranged below -200 mV. Upon introduction of 3% salt solution, the potential reached up to -500 mV. This potential was maintained while a salt solution was being added for six months. The ECE technique was then applied to the test specimens in order to remove the chloride from them. Half-cell potential was measured to determine if the ECE technique can effectively reduce the level of corrosion.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Bridge deck and substructure deterioration due to the corrosive effects of deicing chemicals on reinforcing steel is a problem facing many transportation agencies. The main concern is protection of older bridges with uncoated reinforcing steel. Many different methods have been tried over the past years to repair bridge decks. The Iowa system of bridge deck rehabilitation has proven to be very effective. It consists of scarifying the deck surface, removing any deteriorated concrete, and overlaying with low slump dense concrete. Another rehabilitation method that has emerged is cathodic protection. It has been used for many years in the protection of underground pipelines and in 1973 was first installed on a bridge deck. Cathodic protection works by applying an external source of direct current to the embedded reinforcing steel, thereby changing the electrochemical process of corrosion. The corroding steel, which is anodic, is protected by changing it to a cathodic state. The technology involved in cathodic protection as applied to bridge decks has improved over the last 12 years. One company marketing new technology in cathodic protection systems is Raychem Corporation of Menlo Park, California. Their system utilizes a Ferex anode mesh that distributes the impressed direct current over the deck surface. Ferex mesh was selected because it seemed readily adaptable to the Iowa system of bridge deck rehabilitation. The bridge deck would be scarified, deteriorated concrete removed, Ferex anode mesh installed, and overlaid with low slump dense concrete. The Federal Highway Administration (FHWA) promotes cathodic protection under Demonstration Project No. 34, "Cathodic Protection for Reinforced Concrete Bridge Decks."

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The ends of prestressed concrete beams under expansion joints are often exposed to moisture and chlorides. Left unprotected, the moisture and chlorides come in contact with the ends of the prestressing strands and/or the mild reinforcing, resulting in corrosion. Once deterioration begins, it progresses unless some process is employed to address it. Deterioration can lead to loss of bearing area and therefore a reduction in bridge capacity. Previous research has looked into the use of concrete coatings (silanes, epoxies, fiber-reinforced polymers, etc.) for protecting prestressed concrete beam ends but found that little to no laboratory research has been done related to the performance of these coatings in this specific type of application. The Iowa Department of Transportation (DOT) currently specifies coating the ends of exposed prestressed concrete beams with Sikagard 62 (a high-build, protective, solvent-free, epoxy coating) at the precast plant prior to installation on the bridge. However, no physical testing of Sikagard 62 in this application has been completed. In addition, the Iowa DOT continues to see deterioration in the prestressed concrete beam ends, even those treated with Sikagard 62. The goals of this project were to evaluate the performance of the Iowa DOT-specified beam-end coating as well as other concrete coating alternatives based on the American Association of State Highway and Transportation Officials (AASHTO) T259-80 chloride ion penetration test and to test their performance on in-service bridges throughout the duration of the project. In addition, alternative beam-end forming details were developed and evaluated for their potential to mitigate and/or eliminate the deterioration caused by corrosion of the prestressing strands on prestressed concrete beam ends used in bridges with expansion joints. The alternative beam-end details consisted of individual strand blockouts, an individual blockout for a cluster of strands, dual blockouts for two clusters of strands, and drilling out the strands after they are flush cut. The goal of all of the forming alternatives was to offset the ends of the prestressing strands from the end face of the beam and then cover them with a grout/concrete layer, thereby limiting or eliminating their exposure to moisture and chlorides.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

There is increasing evidence that modular neck stems are prone to corrosion-related complications. Recent studies showed elevated metal ions levels and occasional pseudotumor formation in patients with such implants. The purpose of this study was to compare systemic metal-ion levels in patients after primary THA with modular neck stems to those of patients after non-modular implants. To our knowledge, this is the first cohort study including a control group, THA without CoCr heads and dry-assembled neck-stem connections. Methods: 50 patients after THA at a minimum follow-up of 1 year have been selected for the study. Patients with multiple prosthesis or other implants have been deselected. All received a cementless SPS stem from Symbios (Ti6Al4V). 40 patients have the modular neck (CoCr) version and 10 a monobloc version. All bearings were either ceramic-ceramic or ceramic-polyethylene to minimize other sources of CoCr ion release. In the modular group, the neck was chosen pre-operatively based on a 3D planning, allowing for a dry assembly of the stem and neck on the back table before implantation. A plasma system coupled to mass spectrometry was used for a complete elementary quantification in blood and serum separately. Clinical outcome was measured using the Oxford Hip Score. Results : Complete data sets of 29 patients (24 in the modular neck-group (10male, mean age 63y, 35-84y) and 5 in the monobloc-group (3 male, 69 y, 51-83y) are available to date. Mean Co blood levels were .95 ug/L (.14-12.4) in the modular group vs .27 ug/L (.10-.73) in the monobloc group (p=.2). Respective values for Cr were significantly higher in the modular group (.99 g/L; range .75-1.21) compared to those in the monobloc group (.74 g/L ;.62-.86; p=.001). No significant difference was found when comparing serum levels. 5/24 patients had Co levels above 1 g/L (12/24 for Cr), which is by some considered as a relevant elevation. The maximum Co level was measured in an asymptomatic patient. The Oxford Hip Scores were similar in both groups. Conclusion: Cr levels were significantly elevated in the modular neck group compared to those in the monobloc group. 1/24 patients with a modular prosthesis exhibited Co levels, which are beyond the threshold accepted even for metal-on-metal bearing couples. These results have contributed to our decision to abandon the use of modular neck stems. Routine follow-up including annual measurements of systemic CoCr concentrations should be considered.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This research project investigated the effects of concentrated brines of magnesium chloride, calcium chloride, sodium chloride, and calcium magnesium acetate on portland cement concrete. Although known to be effective at deicing and anti-icing, the deleterious effects these chemicals may have on concrete have not been well documented. As a result of this research, it was determined that there is significant evidence that magnesium chloride and calcium chloride chemically interact with hardened portland cement paste in concrete resulting in expansive cracking, increased permeability, and a significant loss in compressive strength. Although the same effects were not seen with sodium chloride brines, it was shown that sodium chloride brines have the highest rate of ingress into hardened concrete. This latter fact is significant with respect to corrosion of embedded steel. The mechanism for attack of hardened cement paste varies with deicer chemical but in general, a chemical reaction between chlorides and cement hydration products results in the dissolution of the hardened cement paste and formation of oxychloride phases, which are expansive. The chemical attack of the hardened cement paste is significantly reduced if supplementary cementitious materials are included in the concrete mixture. Both coal fly ash and ground granulated blast furnace slag were found to be effective at mitigating the chemical attack caused by the deicers tested. In the tests performed, ground granulated blast furnace slag performed better as a mitigation strategy as compared to coal fly ash. Additionally, siloxane and silane sealants were effective at slowing the ingress of deicing chemicals into the concrete and thereby reducing the observed distress. In general, the siloxane sealant appeared to be more effective than the silane, but both were effective and should be considered as a maintenance strategy.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This research project investigated the effects of concentrated brines of magnesium chloride, calcium chloride, sodium chloride, and calcium magnesium acetate on portland cement concrete. Although known to be effective at deicing and anti-icing, the deleterious effects these chemicals may have on concrete have not been well documented. As a result of this research, it was determined that there is significant evidence that magnesium chloride and calcium chloride chemically interact with hardened portland cement paste in concrete resulting in expansive cracking, increased permeability, and a significant loss in compressive strength. Although the same effects were not seen with sodium chloride brines, it was shown that sodium chloride brines have the highest rate of ingress into hardened concrete. This latter fact is significant with respect to corrosion of embedded steel. The mechanism for attack of hardened cement paste varies with deicer chemical but in general, a chemical reaction between chlorides and cement hydration products results in the dissolution of the hardened cement paste and formation of oxychloride phases, which are expansive. The chemical attack of the hardened cement paste is significantly reduced if supplementary cementitious materials are included in the concrete mixture. Both coal fly ash and ground granulated blast furnace slag were found to be effective at mitigating the chemical attack caused by the deicers tested. In the tests performed, ground granulated blast furnace slag performed better as a mitigation strategy as compared to coal fly ash. Additionally, siloxane and silane sealants were effective at slowing the ingress of deicing chemicals into the concrete and thereby reducing the observed distress. In general, the siloxane sealant appeared to be more effective than the silane, but both were effective and should be considered as a maintenance strategy.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Soil consolidation and erosion caused by roadway runoff have exposed the upper portions of steel piles at the abutments of numerous bridges, leaving them susceptible to accelerated corrosion rates due to the abundance of moisture, oxygen, and chlorides at these locations. This problem is compounded by the relative inaccessibility of abutment piles for close-up inspection and repair. The objective of this study was to provide bridge owners with recommendations for effective methods of addressing corrosion of steel abutment piles in existing and future bridges A review of available literature on the performance and protection of steel piles exposed to a variety of environments was performed. Eight potential coating systems for use in protecting existing and/or new piles were selected and subjected to accelerated corrosion conditions in the laboratory. Two surface preparation methods were evaluated in the field and three coating systems were installed on three piles at an existing bridge where abutment piles had been exposed by erosion. In addition, a passive cathodic protection (CP) system using sacrificial zinc anodes was tested in the laboratory. Several trial flowable mortar mixes were evaluated for use in conjunction with the CP system. For existing abutment piles, application of a protective coating system is a promising method of mitigating corrosion. Based on its excellent performance in accelerated corrosion conditions in the laboratory on steel test specimens with SSPC-SP3, -SP6, and -SP10 surface preparations, glass flake polyester is recommended for use on existing piles. An alternative is epoxy over organic zinc rich primer. Surface preparation of existing piles should include abrasive blast cleaning to SSPC-SP6. Although additional field testing is needed, based on the results of the laboratory testing, a passive CP system could provide an effective means of protecting piles in existing bridges when combined with a pumped mortar used to fill voids between the abutment footing and soil. The addition of a corrosion inhibitor to the mortar appears to be beneficial. For new construction, shop application of thermally sprayed aluminum or glass flake polyester to the upper portion of the piles is recommended.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Joints are always a concern in the construction and long-term performance of concrete pavements. Research has shown that we need some type of positive load transfer across transverse joints. The same research has directed pavement designers to use round dowels spaced at regular intervals across the transverse joint to distribute the vehicle loads both longitudinally and transversely across the joint. The goal is to reduce bearing stresses on the dowels and the two pavement slab edges and erosion of the underlying surface, hence improved long-term joint and pavement structure performance. Road salts cause metal corrosion in doweled joints, excessive bearing stresses hollow dowel ends, and construction processes are associated with cracking pavement at the end of dowels. Dowels are also a cost factor in the pavement costs when joint spacing is reduced to control curling and warping distress in pavements. Designers desire to place adequate numbers of dowels spaced at the proper locations to handle the anticipated loads and bearing stresses for the design life of the pavement. This interim report is the second of three reports on the evaluation of elliptical steel dowels. This report consists of an update on the testing and performance of the various shapes and sizes of dowels. It also documents the results of the first series of performance surveys and draws interim conclusions about the performance of various bar shapes, sizes, spacings, and basket configurations. In addition to the study of elliptical steel dowel performance, fiber reinforced polymers (FRP) are also tested as elliptical dowel material (in contrast to steel) on a section of the highway construction north of the elliptical steel test sections.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Many state, county, and local agencies are faced with deteriorating bridge infrastructure composed of a large percentage of relatively short to medium span bridges. In many cases, these older structures are rolled or welded longitudinal steel stringers acting compositely with a reinforced concrete deck. Most of these bridges, although still in service, need some level of strengthening due to increases in legal live loads or loss of capacity due to deterioration. Although these bridges are overstressed in most instances, they do not warrant replacement; thus, structurally efficient but cost-effective means of strengthening needs to be employed. In the past, the use of bolted steel cover plates or angles was a common retrofit option for strengthening such bridges. However, the time and labor involved to attach such a strengthening system can sometimes be prohibitive. This project was funded through the Federal Highway Administration’s Innovative Bridge Research and Construction program. The goal is to retrofit an existing structurally deficient, three-span continuous steel stringer bridge using an innovative technique that involves the application of post-tensioning forces; the post-tensioning forces were applied using fiber reinforced polymer post-tensioning bars. When compared to other strengthening methods, the use of carbon fiber reinforced polymer composite materials is very appealing in that they are highly resistant to corrosion, have a low weight, and have a high tensile strength. Before the post-tensioning system was installed, a diagnostic load test was conducted on the subject bridge to establish a baseline behavior of the unstrengthened bridge. During the process of installing the post-tensioning hardware and stressing the system, both the bridge and the post-tensioning system were monitored. The installation of the hardware was followed by a follow-up diagnostic load test to assess the effectiveness of the post-tensioning strengthening system. Additional load tests were performed over a period of two years to identify any changes in the strengthening system with time. Laboratory testing of several typical carbon fiber reinforced polymer bar specimens was also conducted to more thoroughly understand their behavior. This report documents the design, installation, and field testing of the strengthening system and bridge.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The function of dowel bars is the transfer of a load across the transverse joint from one pavement slab to the adjoining slab. In the past, these transfer mechanisms have been made of steel. However, pavement damage such as loss of bonding, deterioration, hollowing, cracking and spalling start to occur when the dowels begin to corrode. A significant amount of research has been done to evaluate alternative types of materials for use in the reinforcement of concrete pavements. Initial findings have indicated that stainless steel and fiber composite materials possess properties, such as flexural strength and corrosion resistance, that are equivalent to the Department of Transportation specifications for standard steel, 1 1/2 inch diameter dowel bars. Several factors affect the load transfer of dowels; these include diameter, alignment, grouting, bonding, spacing, corrosion resistance, joint spacing, slab thickness and dowel embedment length. This research is directed at the analysis of load transfer based on material type and dowel spacing. Specifically, this research is directed at analyzing the load transfer characteristics of: (a) 8-inch verses 12-inch spacing, and (b) alternative dowel material compared to epoxy coated steel dowels, will also be analyzed. This report documents the installation of the test sections, placed in 1997. Dowel material type and location are identified. Construction observations and limitations with each dowel material are shown.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Tämän diplomityön kirjallisessa osassa on tarkasteltu sulfaattiselluloosatehtaan ympäristöpäästöjen vähentämiseen liittyvää ongelmallisuutta sekä luomaan pääpiirteittäinen kuvaus sulfaattiselluloosatehtaan kemikaalikierrosta lähinnä rikki- ja natriumyhdisteiden kiertoja huomioiden. Pääasiassa kemikaalisäästöjen ja ympäristösyiden vuoksi tehtävää kemikaalikierron sulkemista seuraa rikki- ja natriumtaseisiin sekä kemikaalikierron vierasaineisiin liittyviä ongelmia, kuten prosessilaitteistojen likaantumista, korroosiota ja hajukaasuyhdisteiden muodostumista. Diplomityön mallinnusosassa on luotu Metsä-Botnian Rauman sellutehtaan kemikaalikierron malli pohjautuen tehtaan virtauskaavioihin sekä muuhun tehtaalta saatuun prosessi-informaatioon. BALAS-simulointiohjelmiston avulla luotuja mallikaavioita on käytetty hyväksi tehtaan kokonais- rikki- ja natriumtaseiden laskennassa. Varsinainen simulointi on jätetty projektin aikataulullisten syiden vuoksi jatkoprojektin piiriin.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Työn tarkoitus on löytää paperitehdasintegraatin tuorevesien käsittelyyn kloorikaasun korvaava desinfiointimenetelmä Stora Enso Publication Papers Oy Ltd.:n Anjalan tehtailla. Tehtaalla on ympäristöluvassaan velvoite selvittää mahdollisuudet tuoreveden desinfiointiin käytettävän kaasumaisen kloorin korvaamiseen hypokloriitilla. Kloorikaasun käyttö tehtaalla on työturvallisuusriski, ja jäännösklooripitoisuuksien hallittavuus kloorikaasua käytettäessä on heikko. Työssä tutkittava vesijae on kemiallisesti puhdistettu vesi. Koeajossa käytettävät kemikaalit ovat 10 % natriumhypokloriitti (NaOCl) ja kantaja-aine eli bromikloori- di-metyyli-hydantoiini (BCDMH). Tuloksista voidaan päätellä, että NaOCl:lla ja NaOCl:lla yhdessä BCDMH:n kanssa saavutetaan veden käyttökohteessa korkeammat aktiivisen kloorin jäännöspitoisuudet kuin kloorikaasulla. NaOCl:n ja kaksikomponenttisysteemin käyttökustannukset ovat kuitenkin yli kuusinkertaiset kloorikaasuun verrattuna. NaOCl annosteltuna yhteen pisteeseen olisi vaivattomin menetelmä kloorikaasun korvaamiseen. NaOCl:n annostelulla kahteen pisteeseen voitaisiin saavuttaa korkeampia jäännöspitoisuuksia kuin yhden pisteen annostelulla, mutta menetelmä vaatii lisätutkimuksia. Kaksikomponenttisysteemillä saavutetaan korkeimmat aktiivisen kloorin jäännöspitoisuudet, mutta sen seurantamenetelmien luotettavuudesta tulee varmistua ennen menetelmän käyttöönottoa. Korroosion ehkäisyn ja työturvallisuuden kannalta sekä NaOCl että NaOCl yhdessä BCDMH:n kanssa ovat turvallisempia vaihtoehtoja kuin kaasukloori.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Tämän työn tarkoituksena oli selvittää mekaanisen massan valmistuksen käsittävän paperitehtaan rejektija jätevirtojen poltettavuutta, jos paperitehtaan vesikiertojen sulkemisastetta lisätään. Jotta prosessin tilannetta sulkemisen jälkeen saatiin arvioitua, Anjalan paperitehtaan nykypäivän PK3:n prosessia tutkittiin kuorimolta jätevesilaitokselle. Kirjallisuusosassa käsiteltiin rejekti- ja jätevirtojen alkuperää mekaanista massaa käyttävässä paperitehtaassa. Myös tämän päivän jätevedenkäsittelyprosessit sekä sulkemisessa mahdolliset prosessiveden puhdistustekniikat esiteltiin lyhyesti. Lisäksikäytiin läpi nykypäivänä metsäteollisuudessa käytössä olevat polttotekniikat sekä polttoaineiden karakterisointi kattilan käytettävyyden ja päästöjen kannalta. Anjalan PK3:lla käytetään sekä peroksidi- että ditioniittivalkaistua tai pelkästään ditioniittivalkaistua hioketta riippuen tuotannossa olevasta lajista. PK3-prosessissa syntyneet jätevesi-, liete- ja muut jätevirrat selvitettiin molemmissa valkaisuolosuhteissa. Prosessin eniten liuennutta orgaanista ainesta sisältävät jätevesijakeet, 3-hiomon kuumankierron ja kirkassuodoksen ulosajot sekä kuoripuristimen suodos, valittiin puhdistettaviksi virroiksi prosessin sulkemista arvioitaessa. Kun peroksidivalkaisua käytettiin 3-hiomolla, TOC-kuorma jokeen oli 30 % suurempi kuin pelkällä ditioniittivalkaisulla. Jos prosessin sulkemisastetta lisättäisiin, TOC-kuorma olisi 30 %pienempi kuin tänäpäivänä peroksidivalkaisua käytettäessä (80 % puhdistustehokkuudella). Prosessin sulkemisastetta lisättäessä biolietettä muodostuisi n. 30 % vähemmän verrattuna nykytilanteeseen, sillä mikrobien ravintona käyttämää orgaanista ainesta päätyisi vähemmän jäteveteen. 3-hiomon peroksidivalkaisun vaikutus kattilan käytettävyyteen ja päästöihin oli pieni, sillä biolietteen osuus polttoaineen syötöstä oli vain 4 %. Vain osa biolietteestä muodostui 3-hiomolta peräisin olevaa orgaanista ainesta poistettaessa. Jos nykyisen pääpolttoaineen, PDF:n,osuuden jättää huomioimatta, SO2- ja NOx-päästöt sekä leijupedin sintrautuvuus ovat hiukan suuremmat käytettäessä peroksidivalkaisua 3-hiomolla kuin pelkästään ditioniittivalkaisulla. Jos kuoripuristimen ja hiomon suodosten puhdistuksen konsentraatit johdetaan poltettaviksi BFB-tyyppiseen kattilaan, leijupedin sintrautuminen tulisi olemaan suurin ongelma. Myös raskasmetalli-, SO2- ja NOx-päästöt lisääntyisivät merkittävästi verrattuna nykyiseen tilanteeseen. Sen sijaan kattilan korroosioriski tuskin lisääntyisi. Lisäksi konsentraattien kosteuspitoisuus olisi korkea, mikä tekisi poltosta kannattamatonta veden haihdutuksen vaatiessa paljon energiaa. Yksityiskohtaisempaa tutkimusta tarvitaan vielä prosessin sulkemisen vaikutuksista päästöihin ja kattilan käytettävyyteen. Myös muita konsentraattien hävittämismahdollisuuksia tulisi tutkia lisää.