974 resultados para Bio Power Plant
Resumo:
Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)
Resumo:
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)
Resumo:
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)
Resumo:
Pós-graduação em Serviço Social - FCHS
Resumo:
Pós-graduação em Geografia - FCT
Resumo:
Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)
Resumo:
Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)
Resumo:
Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)
Modelagem matemática para otimização de um potencial hidráulico utilizando turbinas Francis e Kaplan
Resumo:
Pós-graduação em Engenharia Mecânica - FEG
Resumo:
The availability of the electrical energy, in sufficient quantities and in competitive prices is a crucial factor to the economic development. The trade-in of the excess electrical energy produced in a system of cogeneration can be seen as an alternative to the creation of an additional source of revenues for ethanol power plants sector, besides contributing to the complementation of the Brazilian electrical headquarter with renewable sources. The objective of this study was to evaluate the economic feasibility of the implementation of a cogeneration electrical central using the excess of sugar cane bagasse and selling the excess of electrical energy with prices of the market. An ethanol power plant located in the state of Sao Paulo was used to this study. It was used the case study methodology, evaluating the potential of the investment under the viewpoint of the Net Present Value (NPV), Payback and Internal Rate of Return (IRR), and complementing the results of the Accounting Results (AC). It was created three alternative scenarios to reflect the level of the risk of every studied situation: the most likely, an optimistic and a pessimistic, each one with its assumptions. The Monte Carlo Simulations was used to insert the elements of risk to each scenario. The results showed that the project is feasible in all NPV scenarios. And the Payback and IRR analysis confirmed these evidences. The valuation with the AR showed that the project is most risky at the pessimistic scenario, but is feasibly in the most likely and the optimistic scenarios. It was concluded that the project is economic viable. However, the economic viability shown in the results is based on the maintenance of the future prices on the levels of the historical prices used in the analysis.
Resumo:
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)
Resumo:
Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)
Resumo:
We studied the reproduction, sexual dimorphism, and diet of Oxyrhopus trigeminus from two sites in southeastern Brazil. Oxyrhopus trigeminus from Irape Power Plant (IPP) contained vitellogenic follicles and eggs in both rainy and dry seasons and clutch size was not correlated with female snout vent length (SVL). Sexual dimorphism was evident. Females attain larger SVL but males have longer tails. We found three females from Santa Clara Power Plant (SPP) with vitellogenic follicles, all of them collected in the dry season. Mean SVLs of adult females from IPP and SPP were 717.7 mm and 786 mm, respectively. Mean SVL of adult males from IPP was 553.4 mm and the single adult male from SPP was 507 mm. The diet of O. trigeminus from IPP included rodents (46.7%), lizards (33.3%), and birds (20%). The volume of individual prey items was not correlated with snake SVL. The diet of O. trigeminus from SPP included rodents (37.5%), lizards (37.5%), birds (12.5%), and marsupials (12.5%). It seemed that an ontogenetic shift may occur in individuals of this snake species from IPP.
Resumo:
Programa de doctorado: Energía y Medio Ambiente
Resumo:
The present PhD thesis summarizes the three-years study about the neutronic investigation of a new concept nuclear reactor aiming at the optimization and the sustainable management of nuclear fuel in a possible European scenario. A new generation nuclear reactor for the nuclear reinassance is indeed desired by the actual industrialized world, both for the solution of the energetic question arising from the continuously growing energy demand together with the corresponding reduction of oil availability, and the environment question for a sustainable energy source free from Long Lived Radioisotopes and therefore geological repositories. Among the Generation IV candidate typologies, the Lead Fast Reactor concept has been pursued, being the one top rated in sustainability. The European Lead-cooled SYstem (ELSY) has been at first investigated. The neutronic analysis of the ELSY core has been performed via deterministic analysis by means of the ERANOS code, in order to retrieve a stable configuration for the overall design of the reactor. Further analyses have been carried out by means of the Monte Carlo general purpose transport code MCNP, in order to check the former one and to define an exact model of the system. An innovative system of absorbers has been conceptualized and designed for both the reactivity compensation and regulation of the core due to cycle swing, as well as for safety in order to guarantee the cold shutdown of the system in case of accident. Aiming at the sustainability of nuclear energy, the steady-state nuclear equilibrium has been investigated and generalized into the definition of the ``extended'' equilibrium state. According to this, the Adiabatic Reactor Theory has been developed, together with a New Paradigm for Nuclear Power: in order to design a reactor that does not exchange with the environment anything valuable (thus the term ``adiabatic''), in the sense of both Plutonium and Minor Actinides, it is required indeed to revert the logical design scheme of nuclear cores, starting from the definition of the equilibrium composition of the fuel and submitting to the latter the whole core design. The New Paradigm has been applied then to the core design of an Adiabatic Lead Fast Reactor complying with the ELSY overall system layout. A complete core characterization has been done in order to asses criticality and power flattening; a preliminary evaluation of the main safety parameters has been also done to verify the viability of the system. Burn up calculations have been then performed in order to investigate the operating cycle for the Adiabatic Lead Fast Reactor; the fuel performances have been therefore extracted and inserted in a more general analysis for an European scenario. The present nuclear reactors fleet has been modeled and its evolution simulated by means of the COSI code in order to investigate the materials fluxes to be managed in the European region. Different plausible scenarios have been identified to forecast the evolution of the European nuclear energy production, including the one involving the introduction of Adiabatic Lead Fast Reactors, and compared to better analyze the advantages introduced by the adoption of new concept reactors. At last, since both ELSY and the ALFR represent new concept systems based upon innovative solutions, the neutronic design of a demonstrator reactor has been carried out: such a system is intended to prove the viability of technology to be implemented in the First-of-a-Kind industrial power plant, with the aim at attesting the general strategy to use, to the largest extent. It was chosen then to base the DEMO design upon a compromise between demonstration of developed technology and testing of emerging technology in order to significantly subserve the purpose of reducing uncertainties about construction and licensing, both validating ELSY/ALFR main features and performances, and to qualify numerical codes and tools.