876 resultados para project planning and controlling
Resumo:
The aim of this book is to survey on different Land Use Planning and safety approaches in vicinity of industrial plants. As this research is associated with three broad fields of Land Use Planning, safety and security, the set principle is to avoid unnecessary and over detailed information, but including the useful ones to provide a comprehensive resource which can be applicable for several purposes. Besides, the proposed method, which is explained in Chapter 7, can initiate a new field for future of Land Use Planning in vicinity of industrial plants.
Resumo:
The increasing volume of data describing humandisease processes and the growing complexity of understanding, managing, and sharing such data presents a huge challenge for clinicians and medical researchers. This paper presents the@neurIST system, which provides an infrastructure for biomedical research while aiding clinical care, by bringing together heterogeneous data and complex processing and computing services. Although @neurIST targets the investigation and treatment of cerebral aneurysms, the system’s architecture is generic enough that it could be adapted to the treatment of other diseases.Innovations in @neurIST include confining the patient data pertaining to aneurysms inside a single environment that offers cliniciansthe tools to analyze and interpret patient data and make use of knowledge-based guidance in planning their treatment. Medicalresearchers gain access to a critical mass of aneurysm related data due to the system’s ability to federate distributed informationsources. A semantically mediated grid infrastructure ensures that both clinicians and researchers are able to seamlessly access andwork on data that is distributed across multiple sites in a secure way in addition to providing computing resources on demand forperforming computationally intensive simulations for treatment planning and research.
Resumo:
PM2002B: People own wooded acreages and woodlands for a variety of reasons that may include: timber production, firewood production, recreation, wildlife habitat, aesthetics, and alternative forest products. Most of Iowa’s forestland is privately held, and the majority of ownership is fragmented into an average of ten acres (Forest Reserve Survey, 2004). In fact, the average size of an individual forest or woodlot ownership has been steadily declining for several years due in part to population growth, urban sprawl, and changes in land ownership. Studies indicate that the probability of a sustainable woodlot decreases as the population increases. At the same time, most woodlot owners want to be good stewards and protect and enhance the forest that they own. To achieve this goal, careful forest planning and management is required especially when managing the land for multiple objectives.
Resumo:
This manual captures the experience of practitioners in the Iowa Department of Transportation’s (Iowa DOT’s) Office of Location and Environment (OLE). It also documents the need for coordinated project development efforts during the highway project planning, or location study phase and engineering design. The location study phase establishes: * The definition of, and need for, the highway improvement project * The range of alternatives and many key attributes of the project’s design * The recommended alternative, its impacts, and the agreed-to conditions for project approval The location study process involves developing engineering alternatives, collecting engineering and environmental data, and completing design refinements to accomplish functional designs. The items above also embody the basic content required for projects compliant with the National Environmental Policy Act (NEPA) of 19691, which directs federal agencies to use a systematic, interdisciplinary approach during the planning process whenever proposed actions (or “projects”) have the potential for environmental impacts. In doing so, NEPA requires coordination with stakeholders, review, comment, and public disclosure. Are location studies and environmental studies more about the process or the documents? If properly conducted, they concern both—unbiased and reasonable processes with quality and timely documents. In essence, every project is a story that needs to be told. Engineering and environmental regulations and guidance, as documented in this manual, will help project staff and managers become better storytellers.
Resumo:
Il est important pour les entreprises de compresser les informations détaillées dans des sets d'information plus compréhensibles. Au chapitre 1, je résume et structure la littérature sur le sujet « agrégation d'informations » en contrôle de gestion. Je récapitule l'analyse coûts-bénéfices que les comptables internes doivent considérer quand ils décident des niveaux optimaux d'agrégation d'informations. Au-delà de la perspective fondamentale du contenu d'information, les entreprises doivent aussi prendre en considération des perspectives cogni- tives et comportementales. Je développe ces aspects en faisant la part entre la comptabilité analytique, les budgets et plans, et la mesure de la performance. Au chapitre 2, je focalise sur un biais spécifique qui se crée lorsque les informations incertaines sont agrégées. Pour les budgets et plans, des entreprises doivent estimer les espérances des coûts et des durées des projets, car l'espérance est la seule mesure de tendance centrale qui est linéaire. A la différence de l'espérance, des mesures comme le mode ou la médiane ne peuvent pas être simplement additionnés. En considérant la forme spécifique de distributions des coûts et des durées, l'addition des modes ou des médianes résultera en une sous-estimation. Par le biais de deux expériences, je remarque que les participants tendent à estimer le mode au lieu de l'espérance résultant en une distorsion énorme de l'estimati¬on des coûts et des durées des projets. Je présente également une stratégie afin d'atténuer partiellement ce biais. Au chapitre 3, j'effectue une étude expérimentale pour comparer deux approches d'esti¬mation du temps qui sont utilisées en comptabilité analytique, spécifiquement « coûts basés sur les activités (ABC) traditionnelles » et « time driven ABC » (TD-ABC). Au contraire des affirmations soutenues par les défenseurs de l'approche TD-ABC, je constate que cette dernière n'est pas nécessairement appropriée pour les calculs de capacité. Par contre, je démontre que le TD-ABC est plus approprié pour les allocations de coûts que l'approche ABC traditionnelle. - It is essential for organizations to compress detailed sets of information into more comprehensi¬ve sets, thereby, establishing sharp data compression and good decision-making. In chapter 1, I review and structure the literature on information aggregation in management accounting research. I outline the cost-benefit trade-off that management accountants need to consider when they decide on the optimal levels of information aggregation. Beyond the fundamental information content perspective, organizations also have to account for cognitive and behavi¬oral perspectives. I elaborate on these aspects differentiating between research in cost accounti¬ng, budgeting and planning, and performance measurement. In chapter 2, I focus on a specific bias that arises when probabilistic information is aggregated. In budgeting and planning, for example, organizations need to estimate mean costs and durations of projects, as the mean is the only measure of central tendency that is linear. Different from the mean, measures such as the mode or median cannot simply be added up. Given the specific shape of cost and duration distributions, estimating mode or median values will result in underestimations of total project costs and durations. In two experiments, I find that participants tend to estimate mode values rather than mean values resulting in large distortions of estimates for total project costs and durations. I also provide a strategy that partly mitigates this bias. In the third chapter, I conduct an experimental study to compare two approaches to time estimation for cost accounting, i.e., traditional activity-based costing (ABC) and time-driven ABC (TD-ABC). Contrary to claims made by proponents of TD-ABC, I find that TD-ABC is not necessarily suitable for capacity computations. However, I also provide evidence that TD-ABC seems better suitable for cost allocations than traditional ABC.
Resumo:
This guide was created to aid communities in the process of smart planning and is organized around the 10 Smart Planning Principles signed into Iowa law in 2010. A general description of the concept, strategies for encouraging use, policy tools for implementation, and a current Iowa example are presented for each Principle. In addition, a brief list of resources is provided to help local governments, community organizations and citizen planners find information and ideas on community involvement and incorporation of smart planning concepts in every day decisions.
Resumo:
In June of 1974 Governor Robert Ray approved Senate File 1325, an Act passed by the Sixty-fifth General Assembly which directed the State Historical Society of Iowa to utilize the sum of $2,500 "For the planning and study of a memorial to Ansel Briggs, the first governor of Iowa." This is the final report on all of the information that was compiled during the intense research done on the Governor. This report includes information on his ancestry and personal life, photos, governorship, correspondence, documents, monuments and much more.
Resumo:
This research project combined various datasets, existing and created for this project, into an Interactive Mapping Service (IMS) for use by Iowa DOT personnel, county planning and zoning departments and the public in order to make more informed decisions regarding aggregate sources and future access to them. Iowa DOT Technical Advisory Committee meetings were held, along with public forum presentations, in order to understand better the social, ecological and economic limitations to extracting aggregate. The information needed by potential users was conveyed and integrated into a single informational source, the Aggregate Planning IMS.
Resumo:
This work is divided into three volumes: Volume I: Strain-Based Damage Detection; Volume II: Acceleration-Based Damage Detection; Volume III: Wireless Bridge Monitoring Hardware. Volume I: In this work, a previously-developed structural health monitoring (SHM) system was advanced toward a ready-for-implementation system. Improvements were made with respect to automated data reduction/analysis, data acquisition hardware, sensor types, and communication network architecture. The statistical damage-detection tool, control-chart-based damage-detection methodologies, were further investigated and advanced. For the validation of the damage-detection approaches, strain data were obtained from a sacrificial specimen attached to the previously-utilized US 30 Bridge over the South Skunk River (in Ames, Iowa), which had simulated damage,. To provide for an enhanced ability to detect changes in the behavior of the structural system, various control chart rules were evaluated. False indications and true indications were studied to compare the damage detection ability in regard to each methodology and each control chart rule. An autonomous software program called Bridge Engineering Center Assessment Software (BECAS) was developed to control all aspects of the damage detection processes. BECAS requires no user intervention after initial configuration and training. Volume II: In this work, a previously developed structural health monitoring (SHM) system was advanced toward a ready-for-implementation system. Improvements were made with respect to automated data reduction/analysis, data acquisition hardware, sensor types, and communication network architecture. The objective of this part of the project was to validate/integrate a vibration-based damage-detection algorithm with the strain-based methodology formulated by the Iowa State University Bridge Engineering Center. This report volume (Volume II) presents the use of vibration-based damage-detection approaches as local methods to quantify damage at critical areas in structures. Acceleration data were collected and analyzed to evaluate the relationships between sensors and with changes in environmental conditions. A sacrificial specimen was investigated to verify the damage-detection capabilities and this volume presents a transmissibility concept and damage-detection algorithm that show potential to sense local changes in the dynamic stiffness between points across a joint of a real structure. The validation and integration of the vibration-based and strain-based damage-detection methodologies will add significant value to Iowa’s current and future bridge maintenance, planning, and management Volume III: In this work, a previously developed structural health monitoring (SHM) system was advanced toward a ready-for-implementation system. Improvements were made with respect to automated data reduction/analysis, data acquisition hardware, sensor types, and communication network architecture. This report volume (Volume III) summarizes the energy harvesting techniques and prototype development for a bridge monitoring system that uses wireless sensors. The wireless sensor nodes are used to collect strain measurements at critical locations on a bridge. The bridge monitoring hardware system consists of a base station and multiple self-powered wireless sensor nodes. The base station is responsible for the synchronization of data sampling on all nodes and data aggregation. Each wireless sensor node include a sensing element, a processing and wireless communication module, and an energy harvesting module. The hardware prototype for a wireless bridge monitoring system was developed and tested on the US 30 Bridge over the South Skunk River in Ames, Iowa. The functions and performance of the developed system, including strain data, energy harvesting capacity, and wireless transmission quality, were studied and are covered in this volume.
Resumo:
The Iowa Department of Transportation (IDOT) has been requiring Critical Path Method (CPM) schedules on some larger or more schedule sensitive projects. The Office of Construction's expectations for enhanced project control and improved communication of project objectives have not been fully met by the use of CPM. Recognizing that the current procedures might not be adequate for all projects, IDOT sponsored a research project to explore the state-of-the-art in transportation scheduling and identify opportunities for improvement. The first phase of this project identified a technique known as the Linear Scheduling Method (LSM) as an alternative to CPM on certain highway construction projects. LSM graphically displays the construction process with respect to the location and the time in which each activity occurs. The current phase of this project was implemented to allow the research team the opportunity to evaluate LSM on all small groups of diverse projects. Unlike the first phase of the project, the research team was closely involved in the project from early in the planning phase throughout the completion of the projects. The research strongly suggests that the linear scheduling technique has great potential as a project management tool for both contractors and IDOT personnel. However, before this technique can become a viable weapon in the project management arsenal, a software application needs to be developed. This application should bring to linear scheduling a degree of functionality as rich and as comprehensive as that found in microcomputer based CPM software on the market today. The research team recommends that the IDOT extend this research effort to include the development of a linear scheduling application.
Resumo:
PEOPLE OWN WOODED ACREAGES and woodlands for a variety of reasons that may include: timber production, firewood production, recreation, wildlife habitat, aesthetics, and alternative forest products. Most of Iowa’s forestland is privately held, and the majority of ownership is fragmented into an average of ten acres (Forest Reserve Survey, 2004). In fact, the average size of an individual forest or woodlot ownership has been steadily declining for several years due in part to population growth, urban sprawl, and changes in land ownership. Studies indicate that the probability of a sustainable woodlot decreases as the population increases. At the same time, most woodlot owners want to be good stewards and protect and enhance the forest that they own. To achieve this goal, careful forest planning and management is required especially when managing the land for multiple objectives.
Resumo:
In the administration, planning, design, and maintenance of road systems, transportation professionals often need to choose between alternatives, justify decisions, evaluate tradeoffs, determine how much to spend, set priorities, assess how well the network meets traveler needs, and communicate the basis for their actions to others. A variety of technical guidelines, tools, and methods have been developed to help with these activities. Such work aids include design criteria guidelines, design exception analysis methods, needs studies, revenue allocation schemes, regional planning guides, designation of minimum standards, sufficiency ratings, management systems, point based systems to determine eligibility for paving, functional classification, and bridge ratings. While such tools play valuable roles, they also manifest a number of deficiencies and are poorly integrated. Design guides tell what solutions MAY be used, they aren't oriented towards helping find which one SHOULD be used. Design exception methods help justify deviation from design guide requirements but omit consideration of important factors. Resource distribution is too often based on dividing up what's available rather than helping determine how much should be spent. Point systems serve well as procedural tools but are employed primarily to justify decisions that have already been made. In addition, the tools aren't very scalable: a system level method of analysis seldom works at the project level and vice versa. In conjunction with the issues cited above, the operation and financing of the road and highway system is often the subject of criticisms that raise fundamental questions: What is the best way to determine how much money should be spent on a city or a county's road network? Is the size and quality of the rural road system appropriate? Is too much or too little money spent on road work? What parts of the system should be upgraded and in what sequence? Do truckers receive a hidden subsidy from other motorists? Do transportation professions evaluate road situations from too narrow of a perspective? In considering the issues and questions the author concluded that it would be of value if one could identify and develop a new method that would overcome the shortcomings of existing methods, be scalable, be capable of being understood by the general public, and utilize a broad viewpoint. After trying out a number of concepts, it appeared that a good approach would be to view the road network as a sub-component of a much larger system that also includes vehicles, people, goods-in-transit, and all the ancillary items needed to make the system function. Highway investment decisions could then be made on the basis of how they affect the total cost of operating the total system. A concept, named the "Total Cost of Transportation" method, was then developed and tested. The concept rests on four key principles: 1) that roads are but one sub-system of a much larger 'Road Based Transportation System', 2) that the size and activity level of the overall system are determined by market forces, 3) that the sum of everything expended, consumed, given up, or permanently reserved in building the system and generating the activity that results from the market forces represents the total cost of transportation, and 4) that the economic purpose of making road improvements is to minimize that total cost. To test the practical value of the theory, a special database and spreadsheet model of Iowa's county road network was developed. This involved creating a physical model to represent the size, characteristics, activity levels, and the rates at which the activities take place, developing a companion economic cost model, then using the two in tandem to explore a variety of issues. Ultimately, the theory and model proved capable of being used in full system, partial system, single segment, project, and general design guide levels of analysis. The method appeared to be capable of remedying many of the existing work method defects and to answer society's transportation questions from a new perspective.
Resumo:
The report describes the state of the art video equipment used and experiences gained from the 6,800 mile field test. The first objective of this project was to determine if laser disc equipment could capture and store usable roadway images while operating in a mobile environment. The second objective was to evaluate methods of using optical disc storage and retrieval features to enhance highway planning and design function. Several highway departments have attempted to use video technology to replace the traditional 16 and 35 mm film format used in photologging. These attempts have met with limited success because of the distortion caused by video technology not being capable of dealing with highway speeds. The distortion has caused many highway signs to be unreadable and, therefore, clients have labeled the technology unusable. Two methods of using optical laser disc storage and retrieval have been successfully demonstrated by Wisconsin and Connecticut Departments of Transportation. Each method provides instantaneous retrieval and linking of images with other information. However, both methods gather the images using 35 mm film techniques. The 35 mm film image is then transferred to laser disc. Eliminating the film conversion to laser disc has potential for saving $4 to $5 per logging mile. In addition to a cost savings, the image would be available immediately as opposed to delays caused by film developing and transferring to laser disc. In June and November of 1986 Iowa DOT staff and cooperating equipment suppliers demonstrated the concept of direct image capture. The results from these tests were promising and an FHWA Demonstration program established. Since 1986 technology advancements have been incorporated into the design that further improve the image quality originally demonstrated.
Resumo:
The Federal Highway Administration published the final rule updating 23 CFR 630 Subpart J in September 2004. The revised rule requires agencies using federal funding to address both safety and mobility in planning and construction of roadway improvements. The Iowa Department of Transportation (Iowa DOT) requested the assistance of the Center for Transportation and Research in developing guidance for a policy and procedures to comply with the final rule. This report describes an in-depth examination of current Iowa DOT project development processes for all types of improvements, including maintenance, as well as a detailed characterization of work zone impact considerations throughout project completion. To comply with both the letter and perceived intent of the final rule on safety and mobility, the report features a suggested work zone policy statement and suggested revisions in the Iowa DOT project development processes, including a definition of the key element: significant projects.
Resumo:
Visualization is a relatively recent tool available to engineers for enhancing transportation project design through improved communication, decision making, and stakeholder feedback. Current visualization techniques include image composites, video composites, 2D drawings, drive-through or fly-through animations, 3D rendering models, virtual reality, and 4D CAD. These methods are used mainly to communicate within the design and construction team and between the team and external stakeholders. Use of visualization improves understanding of design intent and project concepts and facilitates effective decision making. However, visualization tools are typically used for presentation only in large-scale urban projects. Visualization is not widely accepted due to a lack of demonstrated engineering benefits for typical agency projects, such as small- and medium-sized projects, rural projects, and projects where external stakeholder communication is not a major issue. Furthermore, there is a perceived high cost of investment of both financial and human capital in adopting visualization tools. The most advanced visualization technique of virtual reality has only been used in academic research settings, and 4D CAD has been used on a very limited basis for highly complicated specialty projects. However, there are a number of less intensive visualization methods available which may provide some benefit to many agency projects. In this paper, we present the results of a feasibility study examining the use of visualization and simulation applications for improving highway planning, design, construction, and safety and mobility.