971 resultados para intraoperative period
Resumo:
Examination report on the City of Sully, Iowa for the period July 1, 2012 through June 30, 2013
Resumo:
OBJECTIVES: in a retrospective study, attempts have been made to identify individual organ-dysfunction risk profiles influencing the outcome after surgery for ruptured abdominal aortic aneurysms. METHODS: out of 235 patients undergoing graft replacement for abdominal aortic aneurysms, 57 (53 men, four women, mean age 72 years [s.d. 8.8]) were treated for ruptured aneurysms in a 3-year period. Forty-eight preoperative, 13 intraoperative and 34 postoperative variables were evaluated statistically. A simple multi-organ dysfunction (MOD) score was adopted. RESULTS: the perioperative mortality was 32%. Three patients died intraoperatively, four within 48 h and 11 died later. A significant influence for pre-existing risk factors was identified only for cardiovascular diseases. Multiple linear-regression analysis indicated that a haemoglobin <90 g/l, systolic blood pressure <80 mmHg and ECG signs of ischaemia at admission were highly significant risk factors. The cause of death for patients, who died more than 48 h postoperatively, was mainly MOD. All patients with a MOD score >/=4 died (n=7). These patients required 27% of the intensive-care unit (ICU) days of all patients and 72% of the ICU days of the non-survivors. CONCLUSION: patients with ruptured aortic aneurysms from treatment should not be excluded. However, a physiological scoring system after 48 h appears justifiable in order to decide on the appropriateness of continual ICU support.
Resumo:
Report on a review of the Sixth Judicial District Department of Correctional Services for the period July 1, 2008 through June 30, 2012
Resumo:
Examination report on the City of Emerson, Iowa for the period July 1, 2012 through June 30, 2013
Resumo:
Report on a review of selected general and application controls over the Iowa Department of Transportation’s Vehicle Registration and Title System for the period April 16, 2012 through May 15, 2012
Resumo:
Examination report on the City of Dike, Iowa for the period July 1, 2012 through June 30, 2013
Resumo:
Examination report on the City of Urbana, Iowa for the period July 1, 2012 through June 30, 2013
Resumo:
Examination report on the City of Murray, Iowa for the period July 1, 2012 through June 30, 2013
Resumo:
Examination report on the City of Magnolia, Iowa for the period July 1, 2012 through June 30, 2013
Resumo:
Examination report on the City of Rhodes, Iowa for the period July 1, 2012 through June 30, 2013
Resumo:
Report on a review of selected general and application controls over the Iowa Public Employees’ Retirement System I-Que Pension Administration System for the period May 20, 2013 through July 12, 2013
Resumo:
Field studies were conducted over 3 years in southeast Buenos Aires, Argentina, to determine the critical period of weed control in maize (Zea mays L.). The treatments consisted of two different periods of weed interference, a critical weed-free period, and a critical time of weed removal. The Gompertz and logistic equations were fitted to relative yields representing the critical weed-free and the critical time of weed removal, respectively. Accumulated thermal units were used to describe each period of weed-free or weed removal. The critical weed-free period and the critical time of weed removal ranged from 222 to 416 and 128 to 261 accumulated thermal units respectively, to prevent yield losses of 2.5%. Weed biomass proved to be inverse to the crop yield for all the years studied. When weeds competed with the crop from emergence, a large increase in weed biomass was achieved 10 days after crop emergence. However, few weed seedlings emerged and prospered after the 5-6 leaf maize stage (10-20 days after emergence).
Resumo:
Examination report on the City of Granger, Iowa for the period July 1, 2012 through June 30, 2013
Resumo:
Examination report on the City of Monroe, Iowa for the period July 1, 2012 through June 30, 2013
Resumo:
Examination report on the City of Wall Lake, Iowa for the period July 1, 2012 through June 30, 2013