898 resultados para international construction


Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper analyses the system of actors involved in the development of residential tourism on the north east coast of Brazil. The study observes the socio-political effects of the 2001-2008 real estate boom, focused on the promotion of second homes in closed residential areas. Stakeholder Analysis (SA) is used to identify the various actors’ roles and positions within a particular social space in a tourist setting which is exposed to transnational and real estate interests. The method reveals an unequal and conflict-ridden social reality. The results show that residential tourism shapes the local socio-political configuration, strengthening some actors (urban developers, real estate companies) whilst positioning others in a situation of dependence (local communities, cities).

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The literature states that project duration is affected by various scope factors. Using 168 building projects carried out in Spain, this paper uses the multiple regression analysis to develop a forecast model that allows estimating project duration of new builds. The proposed model uses project type, gross floor area (GFA), the cost/GFA relationship and number of floors as predictor variables. The research identified the logarithmic form of construction speed as the most appropriate response variable. GFA has greater influence than cost on project duration but both factors are necessary to achieve a forecast model with the highest accuracy. We developed an analysis to verify the stability of forecasted values and showed how a model with high values of fit and accuracy may display an anomalous behavior in the forecasted values. The sensitivity of the proposed forecast model was also analyzed versus the variability of construction costs.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The potential of integrating multiagent systems and virtual environments has not been exploited to its whole extent. This paper proposes a model based on grammars, called Minerva, to construct complex virtual environments that integrate the features of agents. A virtual world is described as a set of dynamic and static elements. The static part is represented by a sequence of primitives and transformations and the dynamic elements by a series of agents. Agent activation and communication is achieved using events, created by the so-called event generators. The grammar defines a descriptive language with a simple syntax and a semantics, defined by functions. The semantics functions allow the scene to be displayed in a graphics device, and the description of the activities of the agents, including artificial intelligence algorithms and reactions to physical phenomena. To illustrate the use of Minerva, a practical example is presented: a simple robot simulator that considers the basic features of a typical robot. The result is a functional simple simulator. Minerva is a reusable, integral, and generic system, which can be easily scaled, adapted, and improved. The description of the virtual scene is independent from its representation and the elements that it interacts with.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

From the late seventeenth to early nineteenth centuries, many religious temples have been built in the province of Alicante (south east of Spain) with brick domes as their main characteristic feature. Often, the limited data available about these remarkable constructions make rehabilitation interventions become into real research projects, with a high value for their historic conservation over time. The aim of this paper is to show a detailed refurbishment analysis of a religious temple built in 1778, showing the need of preservation of historic buildings as a part of the architectural heritage by establishing a common pattern of materials, geometry and constructive systems, specifically in their domes. In most cases, there was not an architectural project for the construction, that is why the analysis of any documentary and archival sources available is essential to find different ways to proceed on the use and maintenance of these religious buildings.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Today, the requirement of professional skills to university students is constantly increasing in our society. In our opinion, the content offered in official degrees need to be nourished with different variables, enriching their global professional knowledge in a parallel way; that is why, in recent years, there is a great multiplicity of complementary courses at university. One of the most socially demanded technical requirements within the architectural, design or engineering field is the management of 3D drawing software, becoming an indispensable reality in these sectors. Thus, this specific training becomes essential over two-dimension traditional design, because the inclusion of great possibilities of spatial development that go beyond conventional orthographic projections (plans, sections or elevations), allowing modelling and rotation of the selected items from multiple angles and perspectives. Therefore, this paper analyzes the teaching methodology of a complementary course for those technicians in the construction industry interested in computer-aided design, using modelling (SketchupMake) and rendering programs (Kerkythea). The course is developed from the technician point of view, by learning computer management and its application to professional development from a more general to a more specific view through practical examples. The proposed methodology is based on the development of real examples in different professional environments such as rehabilitation, new constructions, opening projects or architectural design. This multidisciplinary contribution improves criticism of students in different areas, encouraging new learning strategies and the independent development of three-dimensional solutions. Thus, the practical implementation of new situations, even suggested by the students themselves, ensures active participation, saving time during the design process and the increase of effectiveness when generating elements which may be represented, moved or virtually tested. In conclusion, this teaching-learning methodology improves the skills and competencies of students to face the growing professional demands of society. After finishing the course, technicians not only improved their expertise in the field of drawing but they also enhanced their capacity for spatial vision; both essential qualities in these sectors that can be applied to their professional development with great success.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Both the current economic situation in the construction sector and the continuous normative changes in the building area imply the use of new methodologies to enhance students’ competences in the degree of Building Engineer. The aim of this paper is to present, analyse and discuss the development of constructive workshops as a new teaching methodology used in the subject of Construction of Structures I at the University of Alicante to complement the constructive and technical knowledge acquired by our students and to enhance their communicative and representation skills essential for their professional practice in the future. The used methodology is based on the development of three-dimensional construction details (in groups of 3 or 4 students) to be shown in two A1-pannels exposed in the corridors of the Polytechnic School. Thus, students’ work approaches constructive problems in a global way by discussing simultaneously with teachers and other groups about the most suitable solution on each case. This contribution has multiperspective results and improves criticism of students in different areas, encouraging new learning strategies and active participation. What is more, on-line information and web applications have been used to prepare and organize this kind of workshops, allowing students to use new technologies as a complementary learning methodology. In conclusion, the use of these new workshops in the Degree of Building Engineer stimulates an interactive class versus a traditional lecture where the participative groups´ attitude and the development of oral presentations dissolve the traditional boundaries regarding public communication skills of the students in the Degree.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Nowadays, on a global level, the Higher Education System has a complex and broad horizon of curricular tools to use in the teaching and learning process. In addition to these new educational instruments, full of possibilities, we face specific socio-economic conditions that affect in a significantly way the Curriculum Development in certain knowledge areas (areas traditionally built on a methodology based on a physical presence of students in the classroom). Some areas such as Restoration, Rehabilitation or Construction Pathologies, and the construction sector in general, require very defined and particular knowledge that only a small number of experts claim as specialized training. All these aspects condition the teaching methodology performed in a physical classroom at a university campus (the only option used until recent years) and made us consider the integration of online teaching in these areas too. The present work shows the teaching methodology used for the development of two online courses, where we offer distance learning for "highly specialized" formation in the Edification area (an area where traditionally there was only classroom training). At the beginning, both courses were designed by classroom training, but got a really small number of applications due to the specialized topic proposed. Later, we proposed a "Curriculum Redesign" of the contents, offering an online modality, which implied a significant demand both within and outside the university area. A notable feature of this educational experience is the great spectrum opened for attendees of both courses in the online version. This situation improved significantly the "Curriculum Development" for the student and implied an interesting new proposal on the offered contents and materials (what would have been really difficult to get in a face to face classroom). In conclusion, the absence of certain types of specialized contents in the academic university curricula makes essential to raise new methodologies to save the gap in this area through additional training courses as those analyzed in this paper. Thus, our experience opens a debate on the appropriateness of implementing online training in relation to the face to face training in constructive content subjects and, especially, presents a new scheme, not without controversy, for the curriculum design.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The subject of Construction of Structures I studies, from a constructive point of view and taking into account current legislation, reinforced concrete structures used in buildings, through the acquisition of knowledge and construction criteria required in the profession of a Technical Architect. The contents acquired in this course are essential for further professional development of technicians and are closely related to many of the subjects taught in the same or other courses of the Degree in Technical Architecture at the University of Alicante. The aim of this paper is to present, analyze and discuss the development of a new methodology proposed in the mentioned subject, as it supposed an important change in the traditional way of teaching Construction and Structures I. In order to incorporate new teaching tools in 2013-2014, the course has been implemented by using a Moodle software tool to promote blended learning with online exercises. Our Moodle community allows collaborative work within an open-source platform where teachers and students share a new and personalized learning environment. Students are easily used to the interface and the platform, value the constant connection with teachers or other fellows and completely agree with the possibility of making questions or share documents 24 hours a day. The proposed methodology consists of lectures and practical classes. In the lectures, the basics of each topic are discussed; class attendance, daily study and conducting scheduled exercises are indispensable. Practical classes allow to consolidate the knowledge gained in theory classes by solving professional exercises and actual construction problems related to structures, that shall be compulsorily delivered online. So, after the correction of the teacher and the subsequent feedback of students, practical exercises ensure lifelong learning of the student, who can download any kind of material at any time (constructive details, practical exercises and even corrected exams). Regarding the general evaluation system, goals achievement is assessed on an ongoing basis (65% of the final mark) along the course through written and graphic evidences in person and online, as well as a individual development of a workbook. In all cases, the acquisition of skills, the ability to synthesize, the capacity of logical and critical thinking are assessed. The other 35 % of the mark is evaluated by a complementary graphic exam. Participation in the computing platform is essential and the student is required to do and present, at least 90% of the practices proposed. Those who do not comply with the practices in each specific date could not be assessed continuously and may only choose the final exam. In conclusion, the subject of Construction of Structures I is essential in the development of the regulated profession of Technical Architect as they are considered, among other professional profiles, as specialists in construction of building structures. The use of a new communication platform and online teaching allows the acquisition of knowledge and constructive approaches in a continuous way, with a more direct and personal monitoring by the teacher that has been highly appreciated by almost 100% of the students. Ultimately, it is important to say that the use of Moodle in this subject is a very interesting tool, which was really well welcome by students in one of the densest and important subjects of the Degree of Technical Architecture.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The construction industry has long been considered as highly fragmented and non-collaborative industry. This fragmentation sprouted from complex and unstructured traditional coordination processes and information exchanges amongst all parties involved in a construction project. This nature coupled with risk and uncertainty has pushed clients and their supply chain to search for new ways of improving their business process to deliver better quality and high performing product. This research will closely investigate the need to implement a Digital Nervous System (DNS), analogous to a biological nervous system, on the flow and management of digital information across the project lifecycle. This will be through direct examination of the key processes and information produced in a construction project and how a DNS can provide a well-integrated flow of digital information throughout the project lifecycle. This research will also investigate how a DNS can create a tight digital feedback loop that enables the organisation to sense, react and adapt to changing project conditions. A Digital Nervous System is a digital infrastructure that provides a well-integrated flow of digital information to the right part of the organisation at the right time. It provides the organisation with the relevant and up-to-date information it needs, for critical project issues, to aid in near real-time decision-making. Previous literature review and survey questionnaires were used in this research to collect and analyse data about information management problems of the industry – e.g. disruption and discontinuity of digital information flow due to interoperability issues, disintegration/fragmentation of the adopted digital solutions and paper-based transactions. Results analysis revealed efficient and effective information management requires the creation and implementation of a DNS.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The construction industry is characterised by fragmentation and suffers from lack of collaboration, often adopting adversarial working practices to achieve deliverables. For the UK Government and construction industry, BIM is a game changer aiming to rectify this fragmentation and promote collaboration. However it has become clear that there is an essential need to have better controls and definitions of both data deliverables and data classification. Traditional methods and techniques for collating and inputting data have shown to be time consuming and provide little to improve or add value to the overall task of improving deliverables. Hence arose the need in the industry to develop a Digital Plan of Work (DPoW) toolkit that would aid the decision making process, providing the required control over the project workflows and data deliverables, and enabling better collaboration through transparency of need and delivery. The specification for the existing Digital Plan of Work (DPoW) was to be, an industry standard method of describing geometric, requirements and data deliveries at key stages of the project cycle, with the addition of a structured and standardised information classification system. However surveys and interviews conducted within this research indicate that the current DPoW resembles a digitised version of the pre-existing plans of work and does not push towards the data enriched decision-making abilities that advancements in technology now offer. A Digital Framework is not simply the digitisation of current or historic standard methods and procedures, it is a new intelligent driven digital system that uses new tools, processes, procedures and work flows to eradicate waste and increase efficiency. In addition to reporting on conducted surveys above, this research paper will present a theoretical investigation into usage of Intelligent Decision Support Systems within a digital plan of work framework. Furthermore this paper will present findings on the suitability to utilise advancements in intelligent decision-making system frameworks and Artificial Intelligence for a UK BIM Framework. This should form the foundations of decision-making for projects implemented at BIM level 2. The gap identified in this paper is that the current digital toolkit does not incorporate the intelligent characteristics available in other industries through advancements in technology and collation of vast amounts of data that a digital plan of work framework could have access to and begin to develop, learn and adapt for decision-making through the live interaction of project stakeholders.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

It has been widely documented that when Building Information Modelling (BIM) is used, there is a shift in effort to the design phase. Little investigation into the impact of this shift in effort has been done and how it impacts on costs. It can be difficult to justify the increased expenditure on BIM in a market that is heavily driven by costs. There are currently studies attempting to quantify the return on investment (ROI) for BIM for which these returns can be seen to balance out the shift in efforts and costs to the design phase. The studies however quantify the ROI based on the individual stakeholder’s investment without consideration for the impact that the use of BIM from their project partners may have on their own profitability. In this study, a questionnaire investigated opinions and experience of construction professionals, representing clients, consultants, designers and contractors, to determine fluctuations in costs by their magnitude and when they occur. These factors were examined more closely by interviewing senior members representing each of the stakeholder categories and comparing their experience in using BIM within environments where their project partners were also using BIM and when they were not. This determined the differences in how the use and the investment in BIM impacts on others and how costs are redistributed. This redistribution is not just through time but also between stakeholders and categories of costs. Some of these cost fluctuations and how the cost of BIM is currently financed are also highlighted in several case studies. The results show that the current distribution of costs set for traditional 2D delivery is hindering the potential success of BIM. There is also evidence that stakeholders who don’t use BIM may benefit financially from the BIM use of others and that collaborative BIM is significantly different to the use of ‘lonely’ BIM in terms of benefits and profitability.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Gazprom is determined to continue its efforts to build the South Stream gas pipeline regardless of the slump on the European gas market and the fact that there is sufficient capacity already in the existing transport infrastructure. The official inauguration of the maritime section of South Stream was held on 7 December this year, but the construction itself will commence in 2014. The agreements concluded so far, both intergovernmental and between corporations, are necessary for the launch of the construction of the new pipeline, but still do not guarantee that the project will be completed on time. First of all, some legal problems have yet to be resolved, such as the evaluation of the compliance of the planned actions with the ‘third energy package’ or the fact that ecological surveys required under European law need to be carried out. Secondly, given the present situation on the European gas market and medium-term forecasts, the high cost of implementation of this project and the maintenance expenses of existing pipelines – which are not being used to full capacity – the new project seems to be unfeasible. However, Gazprom’s determination in its efforts to build the pipeline proves that Russia is ready to take a high economic risk to maintain its dominant position on the European gas supply market; it will restrict the possibilities of alternative infrastructural projects being implemented (above all, the EU’s Southern Corridor) and use the construction of new pipelines as an instrument of political pressure on the present transit countries (especially Ukraine).

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The allocation and use of the water resources of Central Asia is one of the most difficult issues to arise out of the break-up of the Soviet Union. How should the waters of the great Central Asian rivers, the Syr Darya and Amu Darya, be used? To generate much needed hydropower electricity in the mountainous countries in which they arise? Or for irrigation in the energy-rich downstream countries? The aim of this paper is to describe the basic problem and the efforts undertaken both by the Central Asian states and the international community, including the EU, to seek a resolution. It traces recent developments relating to the planned construction of dams, the modification of energy supplies and the periodic issue of increasingly bellicose statements from the capitals of the region. Finally it looks into the challenge for establishing a modern international legal order to govern the region's strategic water resources.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

University of Michigan News Service photo. On verso: U. Hosp. new

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Co-ed housing. Baits I and II occupied in 1966 and 1967. Stamp on verso: University of Michigan, News Service, 3528 Administration Bldg., Ann Arbor, Michigan 48104