563 resultados para contractors
Resumo:
From July 1916 to Sept. 1922, successive issues for each month were devoted to specific subjects: Roads and streets; Waterworks and hydraulics, etc. Paging is continuous throughout each vol.
Resumo:
"EPA 560/5-85-024"--Cover.
Resumo:
Memorial of the people of Red River Settlement.
Resumo:
Mode of access: Internet.
Resumo:
"B-282320"--P. 1.
Resumo:
Mode of access: Internet.
Resumo:
The purpose of this paper is to investigate the reasons of social impacts of projects in developing countries despite of thorough impact assessment in appraisal phase of projects. A case study approach on a sewerage project in Barbados was undertaken using primary and secondary information. The study reveals that although the impact assessment report suggested appropriate mitigation measures, but they were not implemented by the contractors. The study suggests fostering an interconnected and symbiotic relationship between appraisal and implementation phases of a project in order to manage project environment. Additionally, a more vigilant and proactive supervisory role should be instituted and strengthened over time and adapted within the dictates of environmental needs. Copyright © 2005 Inderscience Enterprises Ltd.
Resumo:
The Small and Medium-sized construction Enterprises (construction SMEs) in Thailand face challenges like high fragmented structure and low productivity. Many industries improved their business performance using the supply chain integration. This research was conducted by interviewing 14 small and medium Thai building contractors to understand the features and relationship characteristics of the supply chain of construction SMEs. The study reveals that the linkages between the small and medium general contractors and other supply chain members are based on personal trust rather than contract laws, there is no systematic procedure to manage the relationship with clients during the project execution, and social connections help to maintain long-term relationship with clients. Based on the working behaviour and commitment to long-term relationship, six forms of relationship with supply side members are proposed. Finally, improvement measures for the supply chain integration of the construction SMEs in Thailand are presented.
Resumo:
For many decades, the Kingdom of Saudi Arabia has been widely known for being a reliable oil exporter. This fact, however, has not exempted it from facing significant domestic energy challenges. One of the most pressing of these challenges involves bridging the widening electricity supply-demand gap where, currently, the demand is growing at a very fast rate. One crucial means to address this challenge is through delivering power supply projects with maximum efficiency. Project delivery delay, however, is not uncommon in this highly capital-intensive industry, indicating electricity supplies are not coping with the demand increases. To provide a deeper insight into the challenges of project implementation and efficient practice, this research adopts a pragmatic approach by triangulating literature, questionnaires and semi-structured interviews. The research was conducted in the Saudi Arabian power supply industry – Western Operating Area. A total of 105 usable questionnaires were collected, and 28 recorded, semi-structured interviews were conducted, analysed and synthesised to produce a conceptual model of what constitutes the project implementation challenges in the investigated industry. This was achieved by conducting a comprehensive ranking analysis applied to all 58 identified and surveyed factors which, according to project practitioners in the investigated industry, contribute to project delay. 28 of these project delay factors were selected as the "most important" ones. Factor Analysis was employed to structure these 28 most important project delay factors into the following meaningful set of 7 project implementation challenges: Saudi Electricity Company's contractual commitments, Saudi Electricity Company's communication and coordination effectiveness, contractors' project planning and project control effectiveness, consultant-related aspects, manpower challenges and material uncertainties, Saudi Electricity Company's tendering system, and lack of project requirements clarity. The study has implications for industry policy in that it provides a coherent assessment of the key project stakeholders' central problems. From this analysis, pragmatic recommendations are proposed that, if enacted, will minimise the significance of the identified problems on future project outcomes, thus helping to ensure the electricity supply-demand gap is diminished.
Resumo:
Whole life costing (WLC) has become the best practice in construction procurement and it is likely to be a major issue in predicting whole life costs of a construction project accurately. However, different expectations from different organizations throughout a project's life and the lack of data, monitoring targets, and long-term interest for many key players are obstacles to be overcome if WLC is to be implemented. A questionnaire survey was undertaken to investigate a set of ten common factors and 188 individual factors. These were grouped into eight critical categories (project scope, time, cost, quality, contract/administration, human resource, risk, and health and safety) by project phase, as perceived by the clients, contractors and subcontractors in order to identify critical success factors for whole life performance assessment (WLPA). Using a relative importance index, the top ten critical factors for each category, from the perspective of project participants, were analyzed and ranked. Their agreement on those categories and factors were analyzed using Spearman's rank correlation. All participants identify “Type of Project” as the most common critical factor in the eight categories for WLPA. Using the relative index ranking technique and weighted average methods, it was found that the most critical individual factors in each category were: “clarity of contract” (scope); “fixed construction period” (time); “precise project budget estimate” (cost); “material quality” (quality); “mutual/trusting relationships” (contract/administration); “leadership/team management” (human resource); and “management of work safety on site” (health and safety). There was relatively a high agreement on these categories among all participants. Obviously, with 80 critical factors of WLPA, there is a stronger positive relationship between client and contactor rather than contractor and subcontractor, client and subcontractor. Putting these critical factors into a criteria matrix can facilitate an initial framework of WLPA in order to aid decision making in the public sector in South Korea for evaluation/selection process of a construction project at the bid stage.
Resumo:
The aim of this research is to assess the acquisition and absorption technology capabilities of the public sector in developing countries, with specific focus on the State of Kuwait. The assessment process of these two capabilities was conducted using a model originally designed for the private sector. In addition, the research aims to propose a framework to enhance the technological capability of developing countries, as well as the performance of the public sector. To achieve these aims, an investigation of the technology process to three public ministries in Kuwait was conducted. The prime interest of this investigation was to evaluate the role of the transferred technology in enhancing the indigenous technological capability of the public sector. The research is based on a case study approach, comprising a main case study (Ministry of Electricity and Water) and three minor case studies. Based on the outcomes from an extensive literature review and the preliminary sectoral visits, the research question and four hypotheses were formulated. These hypotheses were then tested using interview-based survey and documentation. The findings of the research revealed the weakness of the acquisition and absorption technological capabilities of the public sector. Consequently, the public sector relies extensively on foreign contractors and expatriates to compensate for this weakness. Also, it was found that Kuwait Government has not taken the necessary measures to develop its technological capability. This research has proposed a framework which could lead, if properly managed, to the enhancement of indigenous capability. It has also proposed how to improve performance and productivity in the public sector. Finally, the findings suggest that the assessment model, with minor adjustment, is applicable to the public sector.
Resumo:
The control needed in the management of a project was analysed with particular reference to the unique needs of the construction industry within the context of site management. This was explored further by analysing the various problems facing managers within the overall system and determining to what extent the organisation would benefit from an integrated mangement information system. Integration and management of information within the organisational units and the cycles of events that make up the main sub-system was suggested as the means of achieving this objective. A conceptual model of the flow of information was constructed within the whole process of project management by examining the type of information and documents which are generated for the production cycle of a project. This model was analysed with respect to the site managers' needs and the minimum requirements for an overall integrated system. The most tedious and time-consuming task facing the site manager is the determination of weekly production costs, calculation and preparation of interim certificates and valuation of variations occurring during the production stage and finally the settlement and preparation of supplier and sub-contractors' accounts. These areas where microcomputers could be of most help were identified and a number of packages were designed and implemented for various contractors. The gradual integration of stand-alone packages within the whole of the construction industry is a logical sequence to achieve integration of management system. The methods of doing this were analysed together with the resulting advantages and disadvantages.
Resumo:
This fourth edition of Essentials of Jamaican Taxation as with earlier editions covers the material for an undergraduate course in Jamaican taxation and deals with the theory of taxation and its application through the main provisions of the Income Tax Act, the various Acts governing payroll taxes, the General Consumption Tax Act and the Contractors Levy Act. This edition covers changes which took place after 2007 including the main provisions in the 2012 budget. The text is designed to give mainly students of accounting a working knowledge of taxation as it is administered in Jamaica so they are equipped to perform computations of tax payable by businesses/employers, employees, self-employed, and persons with income from sources other than employment. Most of the text should be understood quite readily by readers other than students who wish to be informed on taxation matters.
Resumo:
Since 2000, the number of living wage ordinances has steadily increased throughout the country. While most of the current research has focused on the beneficial outcomes of living wages, little has been published on their administrative practices. To address this shortcoming, this study focused on the identification of key administrative and political factors involved impacting the implementation of living wage ordinances in Miami-Dade and Broward Counties. The study utilized a triangulation of interviews, surveys, and direct observation. The author conducted interviews of administrators and members of the living wage oversight boards in both counties and observed the monthly meetings held by each county's oversight board from January 2006 to June 2007. These findings were buttressed with a national survey of senior staff in other living wage communities. The study utilized descriptive statistics, Chi Square, Cronbach's Alpha, and Spearman's Rank Correlation Coefficient (Spearman's rho). Interviews indicated that administrators in Dade and Broward are seriously under-staffed and budgeted. Ambiguities in the enabling ordinances have lead to loopholes that undermine implementation and accountability for participating contractors. Survey results showed that policy ambiguity, organizational politics, and a lack of organizational capacity were significant negative factors in the implementation process while an organizational culture emphasizing consistent enforcement was a positive factor. Without the proper inputs, an organization hinders itself from meeting its outputs and outcomes. This study finds that Broward and Miami-Dade Counties do not provide the necessary administrative support to implement a living wage effectively – in stark contrast to the high hopes and strong political support behind their passage. For a living wage to succeed, it first needs an organizational culture committed to providing the necessary resources for implementation as well as transparent, consistent accountability mechanisms.
Resumo:
The integration of automation (specifically Global Positioning Systems (GPS)) and Information and Communications Technology (ICT) through the creation of a Total Jobsite Management Tool (TJMT) in construction contractor companies can revolutionize the way contractors do business. The key to this integration is the collection and processing of real-time GPS data that is produced on the jobsite for use in project management applications. This research study established the need for an effective planning and implementation framework to assist construction contractor companies in navigating the terrain of GPS and ICT use. An Implementation Framework was developed using the Action Research approach. The framework consists of three components, as follows: (i) ICT Infrastructure Model, (ii) Organizational Restructuring Model, and (iii) Cost/Benefit Analysis. The conceptual ICT infrastructure model was developed for the purpose of showing decision makers within highway construction companies how to collect, process, and use GPS data for project management applications. The organizational restructuring model was developed to assist companies in the analysis and redesign of business processes, data flows, core job responsibilities, and their organizational structure in order to obtain the maximum benefit at the least cost in implementing GPS as a TJMT. A cost-benefit analysis which identifies and quantifies the cost and benefits (both direct and indirect) was performed in the study to clearly demonstrate the advantages of using GPS as a TJMT. Finally, the study revealed that in order to successfully implement a program to utilize GPS data as a TJMT, it is important for construction companies to understand the various implementation and transitioning issues that arise when implementing this new technology and business strategy. In the study, Factors for Success were identified and ranked to allow a construction company to understand the factors that may contribute to or detract from the prospect for success during implementation. The Implementation Framework developed as a result of this study will serve to guide highway construction companies in the successful integration of GPS and ICT technologies for use as a TJMT.