973 resultados para SLIM FLOOR
Resumo:
Background We investigated the geographical variation of water supply and sanitation indicators (WS&S) and their role to the risk of schistosomiasis and hookworm infection in school age children in West Africa. The aim was to predict large-scale geographical variation in WS&S, quantify the attributable risk of S. haematobium, S. mansoni and hookworm infections due to WS&S and identify communities where sustainable transmission control could be targeted across the region. Methods National cross-sectional household-based demographic health surveys were conducted in 24,542 households in Burkina Faso, Ghana and Mali, in 2003–2006. We generated spatially-explicit predictions of areas without piped water, toilet facilities and finished floors in West Africa, adjusting for household covariates. Using recently published helminth prevalence data we developed Bayesian geostatistical models (MGB) of S. haematobium, S. mansoni and hookworm infection in West Africa including environmental and the mapped outputs for WS&S. Using these models we estimated the effect of WS&S on parasite risk, quantified their attributable fraction of infection, and mapped the risk of infection in West Africa. Findings Our maps show that most areas in West Africa are very poorly served by water supply except in major urban centers. There is a better geographical coverage for toilet availability and improved household flooring. We estimated smaller attributable risks for water supply in S. mansoni (47%) compared to S. haematobium (71%), and 5% of hookworm cases could be averted by improving sanitation. Greater levels of inadequate sanitation increased the risk of schistosomiasis, and increased levels of unsafe water supply increased the risk of hookworm. The role of floor type for S. haematobium infection (21%) was comparable to that of S. mansoni (16%), but was significantly higher for hookworm infection (86%). S. haematobium and hookworm maps accounting for WS&S show small clusters of maximal prevalence areas in areas bordering Burkina Faso and Mali smaller. The map of S. mansoni shows that this parasite is much more wide spread across the north of the Niger River basin than previously predicted. Interpretation Our maps identify areas where the Millennium Development Goal for water and sanitation is lagging behind. Our results show that WS&S are important contributors to the burden of major helminth infections of children in West Africa. Including information about WS&S as well as the “traditional” environmental risk factors in spatial models of helminth risk yielded a substantial gain both in model fit and at explaining the proportion of spatial variance in helminth risk. Mapping the distribution of infection risk adjusted for WS&S allowed the identification of communities in West Africa where integrative preventive chemotherapy and engineering interventions will yield the greatest public health benefits.
Resumo:
Introduction Buildings, which account for approximately half of all annual energy and greenhouse gas emissions, are an important target area for any strategy addressing climate change. Whilst new commercial buildings increasingly address sustainability considerations, incorporating green technology in the refurbishment process of older buildings is technically, financially and socially challenging. This research explores the expectations and experiences of commercial office building tenants, whose building was under-going green refurbishment. Methodology Semi-structured in-depth interviews with seven residents and neighbours of a large case-study building under-going green refurbishment in Melbourne, Australia. Built in 1979, the 7,008m² ‘B’ grade building consists of 11 upper levels of office accommodation, ground floor retail, and a basement area leased as a licensed restaurant. After refurbishment, which included the installation of chilled water pumps, solar water heating, waterless urinals, insulation, disabled toilets, and automatic dimming lights, it was expected that the environmental performance of the building would move from a non-existent zero ABGR (Australian Building Greenhouse Rating) star rating to 3.5 stars, with a 40% reduction in water consumption and 20% reduction in energy consumption. Interviews were transcribed, with responses analysed using a thematic approach, identifying categories, themes and patterns. Results Commercial property tenants are on a journey to sustainability - they are interested and willing to engage in discussions about sustainability initiatives, but the process, costs and benefits need to be clear. Critically, whilst sustainability was an essential and non-negotiable criterion in building selection for government and larger corporate tenants, sustainability was not yet a core business value for smaller organisations – whilst they could see it as an emerging issue, they wanted detailed cost-benefit analyses, pay-back calculations of proposed technologies and, ideally, wished they could trial the technology first-hand in some way. Although extremely interested in learning more, most participants reported relatively minimal knowledge of specific sustainability features, designs or products. In discussions about different sustainable technologies (e.g., waterless urinals, green-rated carpets), participants frequently commented that they knew little about the technology, had not heard of it or were not sure exactly how it worked. Whilst participants viewed sustainable commercial buildings as the future, they had varied expectations about the fate of existing older buildings – most felt that they would have to be retrofitted at some point to meet market expectations and predicted the emergence of a ‘non-sustainability discount’ for residing in a building without sustainable features. Discussion This research offers a beginning point for understanding the difficulty of integrating green technology in older commercial buildings. Tenants currently have limited understandings of technology and potential building performance outcomes, which ultimately could impede the implementation of sustainable initiatives in older buildings. Whilst the commercial property market is interested in learning about sustainability in the built environment, the findings highlight the importance of developing a strong business case, communication and transition plan for implementing sustainability retrofits in existing commercial buildings.
Resumo:
For the Australian fashion industry to move towards a more socially and environmentally ethical industry, change to existing processes would need to occur in all market levels. Change is particularly needed in the mass market, where larger volumes inevitably lead to greater environmental impact. Recent trends in eco fashion have waxed and waned, with only minor impact on the methodology of the mass market design process, with greenwashing and confusion of concepts being common problems. In the mass market, the product lifecycle begins in the design room and ends on the retail floor. A design process for sustainability necessarily expands this lifecycle, assessing the impact of every stage in the life of a fashion garment from the fibre and textiles through to consumer use, to eventual disposal and beyond disposal to fibre recycling and reuse or resale. However, how easy is it for designers to consider a wider view of the product lifecycle in their design process? How much autonomy do they have over their design process, and where do they believe their responsibility begins and ends for the garments they design? This paper will present some preliminary findings from interviews with designers in the Australian women’s wear mass market, revealing their concerns and views on the challenges of a sustainability for their industry.
Resumo:
The decision of the Court of Appeal in Dunworth v Mirvac Qld Pty Ltd [2011] QCA 200 arose from unusual circumstances associated with the flood in Brisbane earlier this year. Maris Dunworth (‘the buyer’) agreed to purchase a ground floor residential apartment located beside the Brisbane River at Tennyson from Mirvac Queensland Pty Ltd (‘Mirvac’). The original date for completion was 12 May 2009. In earlier proceedings, the buyer had alleged that she had been induced to purchase the apartment by false, misleading and deceptive representations. This claim was dismissed and an order for specific performance was made with a new completion date of 8 February 2011...
Resumo:
'my mother is water, my father is wood' was an installation comprised of two large cork discs mounted on the gallery floor and wall, overlaid with images of photographic and archival research evidence, and a turned wood sculptural object. It also included a short video work on a miniature screen embedded in the upright disc. The work explored the language of natural elements and the structure of genealogical research to discuss the Scandinavian history of Queensland and my own family. The work was selected by the directors of LEVEL ARI in Brisbane for inclusion in their 2011 exhibitions program.
Using cost-effective multimedia to create engaging learning experiences in law and other disciplines
Resumo:
This is the final report of an Australian Learning and Teaching Council Teaching Fellowship which addressed the needs of two separate groups of learners: (1) final year law students studying ethics and (2) law academics and other interested educators in higher education wishing to use information and communication technologies (ICT) to create engaging learning environments for their students but lacking the capacity to do so. The Fellowship resulted in final year law students being infused with an improved appreciation of ethical practice than they receive from traditional lecture/tutorial means by the development of an integrated program of blended learning including an online program entitled "Entry into Valhalla". This "ethics capstone‟ utilises multimedia produced using cost effective resources (including the "Second Life" virtual environment) to create engaging, contextualised learning experiences. The Fellowship also constructed the knowledge of producing cost-effective multimedia projects in other law academics and other educators in higher education by staff development activities comprising workshops, conference presentations and an interactive website using the "Entry into Valhalla" program as a case study exemplar.
Resumo:
The increasing stock of aging office buildings will see a significant growth in retrofitting projects in Australian capital cities. Stakeholders of refitting works will also need to take on the sustainability challenge and realize tangible outcomes through project delivery. Traditionally, decision making for aged buildings, when facing the alternatives, is typically economically driven and on ad hoc basis. This leads to the tendency to either delay refitting for as long as possible thus causing building conditions to deteriorate, or simply demolish and rebuild with unjust financial burden. The technologies involved are often limited to typical strip-clean and repartition with dry walls and office cubicles. Changing business operational patterns, the efficiency of office space, and the demand on improved workplace environment, will need more innovative and intelligent approaches to refurbishing office buildings. For example, such projects may need to respond to political, social, environmental and financial implications. There is a need for the total consideration of buildings structural assessment, modeling of operating and maintenance costs, new architectural and engineering designs that maximise the utility of the existing structure and resulting productivity improvement, specific construction management procedures including procurement methods, work flow and scheduling and occupational health and safety. Recycling potential and conformance to codes may be other major issues. This paper introduces examples of Australian research projects which provided a more holistic approach to the decision making of refurbishing office space, using appropriate building technologies and products, assessment of residual service life, floor space optimisation and project procurement in order to bring about sustainable outcomes. The paper also discusses a specific case study on critical factors that influence key building components for these projects and issues for integrated decision support when dealing with the refurbishment, and indeed the “re-life”, of office buildings.
Resumo:
This two-storey office building and upper floor interior fit-out, completed for the 25th anniversary of Adelaide-based construction firm, Badge Constructions, is a signature building for the client, and its recently established Brisbane-based operations, and a showpiece for their commercial and industrial construction prowess and dynamic, collaborative and transparent work ethic. Situated in the industrial precinct of Bulimba’s Oxford Street, the building is a continuation of the street’s nearby commercial heart, whilst its architectural language references the adjacent industrial structures. The building’s shed-like skillion roof and western wall have been considered as a folded plane, allowing space to be considered as the inhabitation of the inner surface of this plane. The analogy of a lined garment, tailored to suit its wearer, clarifies the relationship between the western façade plane’s unadorned, monochromatic outer surface and the coloured and patterned inner surface, celebrating inhabitation. The use of typically external construction materials are re-positioned as an integral part of the building’s interior fit-out, alluding to Badge’s construction repertoire, and weakening traditional barriers between interior and exterior commercial space. In reference to its Queensland context, the external glazed line of the building is pulled back from the street, providing an eastern verandah edge and a northern court, as a part of the public realm. The upper floor office incorporates a cantilevered outdoor mezzanine within the northern court, whilst the adjacent reception area and stairwell utilises clear glazing in order to visually connect to the street. The building is designed to take advantage of natural light to the east, whilst shading habitable spaces from the north, a building strategy that reduces solar heat gain and energy consumption. Placement of the building’s amenities core to the west provides substantial bracing and allows maximum activation of the north and east street edge. A collaborative design process has resulted in an affordable commercial building with a high level of design resolution and relationship to its Brisbane context, while also challenging the traditional relationships between exterior and interior commercial space, and informed client and consultant team of allied disciplines.
Resumo:
Abstract: LiteSteel beam (LSB) is a new cold-formed steel hollow flange channel section produced using a patented manufacturing process involving simultaneous cold-forming and dual electric resistance welding. The LSBs are commonly used as floor joists and bearers with web openings in residential, industrial and commercial buildings. Their shear strengths are considerably reduced when web openings are included for the purpose of locating building services. However, no research has been undertaken on the shear behaviour and strength of LSBs with web openings. Therefore experimental and numerical studies were undertaken to investigate the shear behaviour and strength of LSBs with web openings. In this research, finite element models of LSBs with web openings in shear were developed to simulate the shear behaviour and strength of LSBs including their buckling characteristics. They were then validated by comparing their results with available experimental test results and used in a detailed parametric study. The results showed that the current design rules in cold-formed steel structures design codes are very conservative for the shear design of LSBs with web openings. Improved design equations have been proposed for the shear capacity of LSBs with web openings based on both experimental and parametric study results. An alternative shear design method based on an equivalent reduced web thickness was also proposed. It was found that the same shear strength design rules developed for LSBs without web openings can be used for LSBs with web openings provided the equivalent reduced web thickness equation developed in this paper is used. This is a significant advancement as it simplifies the shear design methods of LSBs with web openings considerably.
Resumo:
Abstract: The LiteSteel Beam (LSB) is a new cold-formed steel hollow flange channel beam recently developed in Australia. It is commonly used as a floor joist or bearer in buildings. Current practice in flooring systems is to include openings in the web element of floor joists or bearers so that building services can be located within them. Shear behaviour of LSBs with web openings is more complicated while their shear strengths are considerably reduced by the presence of web openings. However, no research has been undertaken on the shear behaviour and strength of LSBs with web openings. Therefore a detailed experimental study involving 26 shear tests was undertaken on simply supported LSB test specimens with web openings and an aspect ratio of 1.5. This paper presents the details of this experimental study and the results of their shear capacities and behavioural characteristics. Experimental results showed that the current design rules in cold-formed steel structures design codes are very conservative for the shear design of LSBs with web openings. Improved design equations have been proposed for the shear strength of LSBs with web openings based on the experimental results from this study.
Resumo:
Nursing personnel are consistently identified as one of the occupational groups most at risk of work-related musculoskeletal disorders. During the moving and handling of bariatric patients, the weight of the patient combined with atypical body mass contributes to a significant risk of injury to the care provider and patient. This is further compounded by the shape, mobility and co-operation of the patient. The aim of this study was determine user experiences and design requirements for mobile hoists with bariatric patients. Structured interviews were conducted with six experienced injury management staff from the Manual Task Services department of three hospitals in Adelaide, South Australia. All staff had experience in patient handling, the use of patient handling equipment and the provision of patient handling training. A series of open-ended questions were structured around five main themes: 1) patient factors; 2) building/vehicle space and design; 3) equipment and furniture; 4) communication; and 5) staff issues. Questions focussed on the use of mobile hoists for lifting and transferring bariatric patients. Interviews were supplemented with a walk-through of the hospital to view the types of mobile hoists used, and the location and storage of equipment. Across the three hospitals there were differing classification systems to define bariatric patients. Ensuring patient dignity, respect and privacy were viewed as important in the management and rehabilitation of bariatric patients. Storage and space constraints were considered factors restricting the use of mobile floor hoists, with ceiling hoists being the preferred method for patient transfers. When using mobile floor hoists, the forces required to push, pull and manoeuvre, as well as sudden unstable movements of the hoist were considered important risks factors giving rise to a risk of injury to the care provider. Record keeping and purchasing policies appeared to inhibit the effective use of patient handling equipment. The moving and handling of bariatric patients presents complex and challenging issues. A co-ordinated and collaborative approach for moving and handling bariatric patients is needed across the range of care providers. Designers must consider both user and patient requirements.
Resumo:
Recently developed cold-formed LiteSteel beam (LSB) sections have found increasing popularity in residential, industrial and commercial buildings due to their light weight and cost-effectiveness. Currently, there is significant interest in the use of LSB sections as flexural members in floor joist systems, although they can be used as flexural and compression members in a range of building systems. The plastic bending behaviour and section moment capacity of LSB sections with web holes can be assumed to differ from those without, but have yet to be investigated. Hence, no appropriate design rules for determining the section moment capacity of LSB sections with web holes are yet available. This paper presents the results of an investigation of the plastic bending behaviour and section moment capacity of LSB sections with circular web holes. LSB sections with varying circular hole diameters and degrees of spacing were considered. The paper also describes the simplified finite element (FE) modelling technique employed in this study, which incorporates all of the significant behavioural effects that influence the plastic bending behaviour and section moment capacity of these sections. The numerical and experimental test results and associated findings are also presented.
Resumo:
When used as floor joists, the new mono-symmetric LiteSteel beam (LSB) sections require web openings to provide access for inspections and various services. The LSBs consist of two rectangular hollow flanges connected by a slender web, and are subjected to lateral distortional buckling effects in the intermediate span range. Their member capacity design formulae developed to date are based on their elastic lateral buckling moments, and only limited research has been undertaken to predict the elastic lateral buckling moments of LSBs with web openings. This paper addresses this research gap by reporting the development of web opening modelling techniques based on an equivalent reduced web thickness concept and a numerical method for predicting the elastic buckling moments of LSBs with circular web openings. The proposed numerical method was based on a formulation of the total potential energy of LSBs with circular web openings. The accuracy of the proposed method’s use with the aforementioned modelling techniques was verified through comparison of its results with those of finite strip and finite element analyses of various LSBs.
Resumo:
Cold-formed steel beams are increasingly used as floor joists and bearers in buildings. Their behaviour and moment capacities are influenced by lateral-torsional buckling when they are not laterally restrained adequately. Past research on lateral-torsional buckling has concentrated on hot-rolled steel beams. Hence a numerical study was undertaken to investigate the lateral-torsional buckling behaviour of simply supported cold-formed steel lipped channel beams subjected to uniform bending. For this purpose a finite element model was developed using ABAQUS and its accuracy was verified using available numerical and experimental results. It was then used in a detailed parametric study to simulate the lateral-torsional buckling behaviour and capacity of cold-formed steel beams under varying conditions. The moment capacity results were compared with the predictions from the current design rules in many cold-formed steel codes and suitable recommendations were made. European design rules were found to be conservative while Australian/New Zealand and North American design rules were unconservative. Hence the moment capacity design equations in these codes were modified in this paper based on the available finite element analysis results. This paper presents the details of the parametric study, recommendations to current design rules and the new design rules proposed in this research for lateral-torsional buckling of cold-formed steel lipped channel beams.
Resumo:
Australian manufacturers recently developed a new mono-symmetric cold-formed steel hollow flange channel section known as LiteSteel Beam. The innovative LSB sections with rectangular flanges are currently being used as floor joists and bearers in buildings. In order to assess their behaviour and section moment capacity including the presence of any inelastic reserve bending capacity, 20 section moment capacity tests were conducted in this study. Test results were compared with the section moment capacities predicted by the steel design codes. Although the current cold-formed steel design rules generally limit the section moment capacities to their first yield moments, test results showed that inelastic reserve bending capacity was present in the compact and non-compact LSB sections. The results have shown that suitable modifications to the current design rules are needed to allow the inclusion of available inelastic bending capacities of LSBs in design.