994 resultados para MEDIAL PREOPTIC AREA
Resumo:
This is the South Area still waters 1995 November surveys from the National Rivers Authority, 1996. The report focuses on the surveys of ten Cheshire Meres (Betley, Budworth, Combermere, Hatchmere, Oak mere, Pick mere, Redes, Rostherne, Tabley, and Tatton) previously surveyed in November 1994 and May 1995. Eight others (Chapel Mere, Little Mere, Marbury Mere, Mere Mere, Oss Mere, Petty Pool, Quoisley Big Mere and Tabley Moat) were surveyed for the first time. Two other lakes, Carr Mill Dam and Pennington Flash, were surveyed. Neither of these are considered to be part of the Cheshire meres group of lakes but are of a Regional interest. This report discusses the results of the November 1995 survey before making a comparison between these and the November 1994 survey results. The section on results contains information about water column profile; nutrients (chlorophyll a; Phaeophytin; Nitrate and Nitrite; Ammonia; ortho-Phosphate; Silicate; and total Phosphorus.
Resumo:
This is the report on Habitats Directive, the Review of Consents Stage 1 and 2 by the Environment Agency of the South Pennine Moors cSAC/SPA. The Habitats Directive has the main aim to promote the maintenance of biodiversity by defining a common framework for the conservation of wild plants and animals and habitats of community interest. The Directive establishes a European ecological network known as "Natura 2000". The network comprises Special Areas of Conservation (SAC) and Special Protection Areas (SPA). In the section on Stage 1 or Screening Process of the Habitat Directive, it is identified the likely impacts upon the Rixton Clay Pits cSAC of a project, plan or activities, either alone or in combination with other projects, plans or activities, and considers whether these impacts are likely to be significant. In the section on Stage 2 or Appropiate Assessment of the Habitat Directive, it is considered the impact on the integrity of the Rixton Clay Pits cSAC of the projects, plans or activities, either alone or in combination with other projects, plans or activities, with respect to the site’s structure and function and its conservation objectives. Additionally, where these are adverse impacts, an assessment of the potential mitigation of those impacts. The criteria used in this report to identify relevant projects, plans or activities and their impacts are water quality discharge consents, waste management licences, abstraction licences, Integration Pollution Control (IPC) and Integrated Pollution Prevention Control (IPPC) permits. Proformas, hydrogeological and GIS maps are included in the review.
Resumo:
This is a technical report on the assessment of the hydrogeological impacts of aggregate extraction activities in the Delamere Area, Cheshire. The first aim of the study was to carry out Stage 3-appropriate assessment, under the EU Habitats Directive (92/43/EEC), of the possible hydrogeological impacts of aggregate extraction activities authorised by the Cheshire CC on candidate Special Areas of Conservation (cSAC) on the Delamere sandsheet, Cheshire. Identifying possible impacts if these activities on the hydrogeological environment, construction of a numerical groundwater flow model of the groundwater system to investigate and quantify impacts and to produce a report as required under Stage 3 of the Habitats Regulations. Secondly, to identify the future potential impacts of the continued extraction of sand and gravel reserves from above and below the water tables from within the Delamere sandsheet, thus releasing reserves identified within the Area of Search of the Cheshire Replacement Minerals Local Plan 1999. This aspect of the study should assist in identifying the implications of further working within Delamere for North West sub-regional apportionment.
Potentialities for increased utilization of scrap fish and fish waste in the Gulf and Caribbean area